GTR 63887836
Tenders Are Invited For Modernization Of The Building At Ul. Piłsudskiego 9 In Czarna Białostocka As Part Of The Project Podlaskie For Ukraine
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
63887836
Tendering Authority
Subscribe to view
Tender No
Or.271.10.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Building At Ul. Piłsudskiego 9 In Czarna Białostocka As Part Of The Project Podlaskie For Ukraine
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
11-05-2023
Closed
Work Detail
A Detailed Description Of The Subject Of The Contract, The Conditions And Manner Of Its Implementation, Required By The Contracting Authority, Is Included In The Description Of The Subject Of The Contract (Also Referred To As Opz), Constituting Appendix No. 1 To The Swz. Residential At Ul. Piłsudskiego 9 In Czarna Białostocka, Plot No. 203/1 Located Within Geodes. Czarna Bialystok, Commune Czarna Białostocka. The Scope Of Works Related To The Subject Of The Investment Includes: Renovation Of Rooms, Renovation Of Internal Installations In The Building, Renovation And Insulation Of The Buildings Facade With Replacement Of Some Windows And External Doors, Renovation And Insulation Of The Roof With Replacement Of The Roofing, Gutters And Downpipes, Renovation Of External Stairs Renovation Of Hardened Surfaces And Bands Around The Building. Modernization Of The Buildings Internal Space - Creation Of 8 Independent Mixed-Use Units In The Form Of: - On The Ground Floor: • 1 Two-Room Apartment With A Kitchenette And A Bathroom, - On The First Floor: • 2 Two-Room Apartments With A Kitchenette And Bathroom, • 1 Two-Room Apartment With Kitchen And Bathroom, - In The Attic: • 1 Two-Room Apartment With Kitchen And Bathroom, • 2 One-Room Apartments With Kitchen And Bathroom, • 1 Two-Room Apartment With Kitchenette And Bathroom With Passageways ( Corridors, Staircases, Lobbies On All Floors, As Well As A Common Room In The Basement And Rooms In The Basement. Within The Scope Of Construction Works, The Following Should Be Performed: - Demolition And Dismantling Of Parts Of The Walls And All Existing Floors With New Ones In The Form Of: • Bathrooms, Toilets, Kitchens And Kitchenettes • Together With 10 Cm Plinths From The Above-Mentioned Stoneware And Floor Tiles; • Stoneware Floors In Auxiliary, Communication And Storage Rooms; • In The Living Quarters And The Cellar Room With The Floor Covering Made Of Tiles - Disassembly Of The Reinforced Concrete Silo - Construction Of New Masonry Walls Made Of Ceramic Hollow Bricks - Construction Of New Monolithic Concrete Lintels Above The Door Openings - Disassembly Of Wooden Wall And Ceiling Coatings, Plastering Works, Finishing Coats, Existing Walls And Ceilings - Replacement, Delivery And Installation Of New Door Frames And Internal And Internal Door Leaves - Replacement, Delivery And Installation Of Aluminum External Doors With An Insulation Coefficient Of Min. 1.3 W/M2k, Double-Glazed - Insulated Glass, Laminated Anti-Burglary P2a Glass From The Outside, Laminated Safety Glass From The Inside, Opened To The Outside Of The Building, White On Both Sides, Equipped With A Lock With An Insert, A Key Insert On Both Sides And A Steel Door, Full, Smooth, Sound Insulation Min. 35 Db, Anti-Burglary Class Rc3, One Lock And Cylinder Certified In Class C, Lock With Cylinder, Key Cylinder On Both Sides; All Lock Inserts Should Be Equipped With A Set Of Keys - 3 Pcs. For The Cylinder And Appropriate Overhangs/Leaf Numbers Identifying The Lock With The Key, - Replacement, Delivery And Installation Of Pvc Windows And Balcony Doors - Replacement, Delivery And Installation Of Aluminum Windows - Replacement Of The Roofing And Insulation Over The Unused Attic - Flashing Sheet Metal And External Windowsills Made Of Steel Sheet, - Delivery And Installation Of Gutters And Downpipes In Gray Ral 7016 - Thermal Insulation Of External Walls, Polystyrene Overlay - Execution Of Plasters And External Wall Cladding In The Form Of: Thin-Layer Plaster In Colors Consistent With The Facade Drawings, Lamb , Grain 1.5 Mm Colored In The Mass; Ceramic Façade Cladding Made Of Clinker Tiles In The Plinth Part And The Ground Floor Zone Ceramic Façade Cladding - Clinker Tiles With Min. Dimensions 210X9x65 Mm, Gray With A Smooth Face Structure, Resistant To Weather Conditions (Uv Rays, Frost, Moisture), Galvanized Steel Sheet, Th. Min. 0.6 Mm, Protected With A Polyester Coating In Gray Ral7016 (Matt Gray) On A Standing Seam With A Spacing Of Approx. 50 Cm (As Roofing), Assembly And Finishing According To The Manufacturers Recommendations, Supplier Of The Roofing System And Facade System Selected By The Contractor, - Execution Renovation Of The Existing Steel And Glass Casing Of The Entrance To The Basement From The North-West Side (Gable) In The Form Of: - Renovation Of The Casing Of The Stairs Of The Main Entrance And Stairs To The Basement, - Execution Of Floor Layers With Flashings After Removing The Old Ones On The Balcony (Above The Main Entrance To The Building ) With A Coat Of Frost-Resistant Gres 30X30cm Tiles In Shades Of Grey, - Renovation Of The Balustrades Of The Balcony Above The Main Entrance By Removing Old Paint Layers, Anti-Corrosion Priming And Covering The Top Coat With Paint For Metal In Shades Of Gray, - Disassembly Of The Balustrades Of The External Stairs, Main Entrance And Descent To Basement (Front Elevation), - Purchase, Delivery And Assembly Of The First Equipment For Mixed Premises And The Common Room In The Form Of Wardrobes, Couches, Sofa Beds, Kitchen Tables, Chairs, 4-Burner Gas Cookers With An Oven Adapted To Be Powered By Propane-Butane Gas, Together With 11 Kg Cylinders Above As Far As Land Development Is Concerned, The Following Should Be Done: - Removal Of The Remains Of The Concrete Hardening Surface In Front Of The Building, - Removal Of Foundations - Hardening: In The Area Of The Former Fuel Oil Bunker And In The Area Behind The Stairs Of The Main Entrance - Make New Bands Around The Building Made Of Concrete Paving Slabs - Rubble And Other Demolition Materials Should Be Disposed Of Using The Services Of A Licensed Recipient, And The Disposal Documentation Should Be Attached To The Construction Documents, - After Completion Of Road Works And Works On The Building, Spread A Vegetation Layer Of Topsoil Along With Sowing Grass On The Adjacent Area. - Disassembly Of The Existing Lighting Fixtures, Plug Sockets And Switches Together With The Power Supply Installations, - Disassembly Of The Lightning Protection System To The Extent Necessary To Insulate The External Walls And Replace The Roofing, And Re-Install The Elements Of The Lightning Protection System Of The Facility, - Install Three New Te Switchgears, Cabinets, - Construction Of New Power Supply Lines Run Flush-Mounted In Furrows With Equipment In The Form Of Switches, Plug Sockets, Etc., - Delivery And Installation Of New Basic, Evacuation And Emergency Lighting Fixtures Made In Led Technology, - Measurement Of The Completed Power And Control Lines And The Operation Of The Applied Protections In Switchgears. Within The Scope Of Works In The Sanitary Industry In The Form Of: - Modernization Of The Existing Oil-Fired Boiler House Based On A Cast Iron Boiler. - Demo Of The Central Heating Installation With Radiators And Accessories, Water And Sewage Installations. With Sanitary Utensils - Demo Of Steel Fuel Oil Tanks, - Execution Of New Central Heating Installations With Radiators And Appropriate Shut-Off And Regulating Fittings, - Execution Of New Water Supply Systems (Cold And Hot Utility Water) - Execution Of A Heating Oil Storage Based On Polyethylene Tanks Made Of A New Flooding And Breathing System Of The Tanks And A New Oil Line To Supply One Burner, - Anti-Corrosion Protection Of The Installation, - Implementation Of Thermal Protection Of The Installation, - Implementation Of New Ventilation Systems, - Implementation Of Necessary Installation Installations, - Performance Of Installation Tightness Tests Before Installing Thermal Insulation And Covering Grooves, The Contractors Tasks Also Include: - Making Pictograms (Toilet:, Technical Rooms (Warehouse, Boiler Room, Common Room, Etc.) And Identifying (Numbering) The Doors To The Rooms Of The Building With Described Overhangs For The Keys Of The Operated Locks, - Providing Employees Of The Police Station With The Possibility Free Entry And Exit From The Area Belonging To The Building, And Entry To The Occupied Rooms On The Ground Floor Of The Building - Implementation Of The Task On The Move Of The Part Of The Facility Of Strategic Importance In Terms Of Public Order And Safety Of The Area Of Operation - Implementation Schedule Regarding The Need To Perform Necessary Works Within The Rented Premises Agree With The Commandant Of The Facility, - Disassembly And, After Insulation, Reassembly Of The Policja Plafond, Building Number, Official Information Board, Emblem, Two Double Flag Holders - The Employer Provides For A Phased - Monthly Settlement Of The Works, Making The Payment For A Specific Stage Of The Works In Accordance With The Presented And Accepted Material And Financial Schedule, Their Actual Implementation Confirmed By The Investors Supervision Inspectors, A Written Notification Of The Completion Of The Stage Of Works Submitted To The Employer And After A Protocol Confirmation Of This Fact, - The Employer Informs That The Costs Related To The Consumption Of Electricity, Heat, Water And Sanitary Protection Are Borne By The Contractor In Based On Separate Agreements With Network Administrators Or With Specialized Companies Providing Such Services, - The Contractor Will: - Carry Out Test Runs Of The Central Heating, Wz., Hot Water Installations, - Test Runs Of The Emergency Evacuation Lighting, - Submit A Cost Estimate Before Signing The Contract And After The Task Is Completed Of The As-Built Cost Estimate, - All Dismantled Elements Of The Roofing, Flashings, Gutters And Downpipes, Etc. To Be Used By The Contractor For The Task. The Investment Should Be Valued And Performed In Accordance With The Design Documentation, The Bill Of Quantities Is Only An Auxiliary Element To Prepare The Offer.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1eff5bbb-7ccf-4a85-9476-0b51c1e53280.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.