GTR 63651620
Tenders Are Invited For Expansion And Reconstruction Of Public Utility Buildings Along With The Reconstruction Of Tourist Infrastructure Facilities
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
63651620
Tendering Authority
Subscribe to view
Tender No
BZP.271.1.6.TP.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion And Reconstruction Of Public Utility Buildings Along With The Reconstruction Of Tourist Infrastructure Facilities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
11-05-2023
Closed
Work Detail
Expansion And Reconstruction Of School Buildings In Ślesin - Zsp In Ślesin, Building At Ul. Youth 11. The Subject Of Part I Of The Order Is: Reconstruction Of The Building Of The School And Kindergarten Complex In Ślesin At Ul. Youth 1 Along With The Extension Of The Library And The Replacement Of The Roof Covering And The Installation Of A Photovoltaic Installation.2. A Detailed Description Of The Subject Of The Contract, A Description Of The Contracting Authoritys Requirements In Terms Of Implementation And Acceptance Are Specified In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works.3. The Contractor Will Be Obliged To: 1) Due To The Performance Of Works During The School Year, Carry Out Works In Such A Way As To Ensure The Safety Of Students, Teachers And Other Persons Staying On The Premises Of The Educational Institution; 2) To Cooperate With School Directors On An Ongoing Basis; In Such A Way That It Is Possible To Conduct School Classes And Conduct Exams; 4) Immediately Collect And/Or Conclude A Contract For The Purchase Of Materials Necessary To Perform The Task, Including In Particular: A) Window And Door Joinery, Including Roof Windows, B) Roofing Materials C) Reinforcing Steel, D) Wall Materials For Thermal Modernization, Including: Polystyrene And Mineral Wool;5) Strictly Comply With The Guidelines Contained In The Technical Specifications For The Execution And Acceptance Of Works, Design Documentation And This Swz;6) Perform Works Taking Into Account The Needs Of Accessibility For The Disabled,7) Have Units Of Equipment And Means Of Transport, Ensuring The Execution Of The Order In Accordance With The Swz And Design Documentation Within The Contractual Period;8) To Keep The Construction Site Clean On An Ongoing Basis;9) To Keep Squares, Roads And Public Roads Clean On An Ongoing Basis On Which Construction Vehicles And Transporting Materials Will Move; 10) Ensure The Possibility Of Passing In The Vicinity Of The Handed Over Work Front; 11) Use Construction Materials And Devices: A) Marked With Ce, Which Means That Their Compliance With The Harmonized Standard Has Been Assessed, Or European Technical Approval Or A National Technical Specification Of An Eu Member State Or The European Economic Area, Recognized By The European Commission As Compliant With The Basic Requirements, Or B) Included In The List Of Products Of Minor Importance To Health And Safety, For Which The Manufacturer Has Issued A Declaration Of Conformity, Specified By The European Commission With Recognized Rules Of Technical Knowledge, Or C) Marked With A Construction Mark, D) Materials And Devices Used To Perform The Subject Of The Contract Must Have Quality And Technological Characteristics, At Least Those Specified In The Design Documentation And Technical Specification For The Execution And Acceptance Of Works, And Must Have Appropriate Attestations And Certificates; E) All Materials Used By The Contractor During The Performance Of The Subject Of The Contract Should Be New And Meet The Quality Requirements Of Products Admitted To Trading, Use In Construction In Accordance With Art. 10 Of The Act Of 7 July 1994 Construction Law (Journal Of Laws Of 2023, Item 682), And In Particular Art. 4 And Art. 5 Of The Act Of April 16, 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213) And The Quality And Species Requirements Specified In Stwiorb.12) Keep The Places Of Work Free Of Obstacles, Remove Unnecessary Materials, Waste , Garbage, Devices That Are No Longer Needed To Perform The Subject Of The Contract; 13) Organize And Properly Secure The Place Of Construction Work With Facilities In A Way That Ensures The Safety Of People Staying On And Within The Facility And Against Access By Third Parties. The Contractor Bears Full Responsibility Accident, As Well As For Damage To The Property Of Third Parties Caused By Its Participation Or Oversight Related To The Implementation Of This Order; 14) Handle Waste In Accordance With Applicable Law In This Regard. The Contractor As A Waste Producer Within The Meaning Of Art. 3 Sec. 1 Point 32 Of The Act On Waste Is Obliged To Manage The Waste Generated During The Implementation Of The Task In Accordance With The Act Of December 14, 2012 On Waste (Journal Of Laws Of 2022, Item 699, As Amended) And The Act Of April 27, 2001 R. - Environmental Protection Law (Journal Of Laws Of 2022, Item 2666, As Amended);15) Carry Out Construction And Demolition Works In Accordance With The Provisions Of The Regulation Of The Minister Of Infrastructure Of February 6, 2003 On Occupational Health And Safety During Perform Construction Works (Journal Of Laws Of 2003, No. 47, Item 401); 16) Remove Immediately And Effectively Any Damage Caused By The Contractor; And Participate In Their Receipt.4. The Required Minimum Warranty Period For All Parts Is 60 Months From The Date Of Receipt By The Employer And Signing (Without Comments) Of The Final Report. The Guarantee Period Will Be Scored As Part Of The Offer Evaluation Criterion.5. Payment Terms: 1) The Employer Provides For Payments In Accordance With The Payment Schedule As Part Of The Funds Received Under The Government Program Of The Polish Fund. Investment: - The First Tranche In 2023 In The Amount Not Higher Than 15% Of The Co-Financing, - The Second Tranche In 2024 In The Amount Of The Co-Financing Remaining To Be Paid. Swz.6. The Required Maximum Completion Date Of The Subject Of The Agreement Is: 16 Months From The Date Of Signing The Agreement.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
64ab5cfb-f5bc-484b-96ad-17d6e3ed6e91.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.