GTR 63440327
Tenders Are Invited For Construction Of A Municipal Road On Kwiatowa Street In Cewice
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
63440327
Tendering Authority
Subscribe to view
Tender No
ZP-ZIR.271.11.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Municipal Road On Kwiatowa Street In Cewice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
08-05-2023
Closed
Work Detail
The Subject Of The Contract Includes The Construction Of A Municipal Road At Ul. Kwiatowa In Cewice. The Investment Was Co-Financed By The Government Road Development Fund. Scope Of The Subject Of The Contract1. Rainwater Drainage System: A) Earthworks - Within The Existing Utilities, Works Must Be Done Manually. 149.7 Running Meters, Made Of Sn8 Pvc Pipes With Push-Fit Joints, Ø200 In Diameter - Min. 16 M.C) Street Inlets In A Monolithic Reinforced Concrete Structure With A Sand Trap With A Diameter Of Ø500 - Min. 10 Pcs. D) Reinforced Concrete Inspection Chambers With A Diameter Of Ø1200 In A Monolithic And Prefabricated Structure - Min. 5 Pcs. 2. Lighting: A) Earthworks - Within The Existing Utilities, The Works Must Be Done Manually. B) Installation Of A Steel Lighting Pole With Min. 9 M - Min. 3 Pcs. C) Installation Of Lighting Fittings 100 W, Luminous Flux Min. 8600Lm Min. 3 Pcs.D) All Measurements And Tests Should Be Carried Out In Accordance With The Design, Confirmed By Appropriate Reports.3. Service Duct: A) Earthworks - Within The Existing Utilities, Works Must Be Done Manually. B) The Duct Should Be Made Of Hdpe 110 Pipe - Min. 167.5 .0 Meters 4. Road Construction: A) Construction Of A Municipal Road On Plot No. 23/8, Ul. Kwiatowa In Cewice, With A Length Of At Least 167.5 M And A Width Of At Least 4.5 M. Min. 8 Cm Of Gray Color - Min. 930.0 M2; The Entire Section Is Bounded On Both Sides By Protruding Concrete Curbs Measuring 15X30x100 Cm, Placed On A Concrete Footing With Resistance. Road Structure: Sand Draining Layer, Thickness. Min 10 Cm, Foundation Layer With Kłsm 0/31.5 Gr. Min. 15 Cm, Base Layer Made Of Lean Concrete - Min. 20 Cm, Cement-Sand Bedding, Thickness. Min 3 Cm. B) The Pavement Should Be Made Of Concrete Paving Stones, Thickness 6 In Grey, Graphite And Yellow According To The Attached Pattern - Min. 207.0 M2. Sidewalk Construction: Sand Draining Layer, Th. Min 5 Cm, Foundation Layer With Kłsm 0/31.5 Gr. Min 10 Cm, Cement-Sand Bedding, Thickness At Least 3 Cm. The Pavement Is Bounded On Both Sides By A Concrete Rim. C) The Exits Should Be Made Of Concrete Paving Stones, Thickness Min 8 Cm In Graphite Color - Min. 102.0 M2. The Construction Of The Descent: Sand Draining Layer, Th. Min 10 Cm, Foundation Layer With Kłsm 0/31.5 Gr. Min. 20 Cm, Cement-Sand Bedding - Thickness Min. 3 Cm. From The Side Of The Road, Drive-On Curbs Embedded At Hmax = 4 Cm, Finished With Resistors Embedded At Zero. 28.0 Items E) Vertical Road Signs In Accordance With The Permanent Traffic Organization Design. F) Regulation Of Wells, Valves, Drain Grates. The Contractor Is Obliged To: 1. Provide Full Surveying Services For The Investment.2. Performing A Geodetic As-Built Inventory In Accordance With Art. 57 Sec. 1 Point 5 Of The Construction Law.3. Obtaining A Permit To Occupy The Right-Of-Way And Pay Related Fees For The Duration Of The Works.4. In The Event Of Damage To The Existing Underground Utilities, Cables, Wires, Ducts, Etc., The Contractor Is Obliged To Repair The Damage And Bear All Related Costs.5. In The Event Of Damage To The Boundary Stones, The Contractor Shall Be Obliged To Reconstruct Them At His Own Expense.6. Restoration Of The Work Site And Infrastructure To The Original Condition.7. Tidying Up The Construction Site.8. The Contractor Is Obliged To Notify All Necessary Institutions And Network Managers About The Commencement Of Construction Works At Least 7 Days In Advance, Together With Obtaining Relevant Statements After The Completion Of Works, And Familiarize Himself With The Content Of The Arrangements Contained In The Design Documentation.9. Before Entering The Areas Owned By Natural Persons, The Contractor Is Obliged To Notify Them Of The Date Of Commencement Of Works, At Least 7 Days In Advance. After Completing The Works On Private Plots, The Contractor Is Obliged To Obtain A Written Statement From The Owner That He Does Not Raise Any Objections To The Works Performed And That The Area Has Been Tidied Up.10. Carrying Out Works In A Way That Allows Entry To The Property.11. Preparation Of The As-Built Cost Estimate After The Completion Of Construction Works.3. The Ordering Party Requires The Contractor To Grant At Least 36 Months Warranty For Defects And 36 Months Quality Guarantee For The Executed Subject Of The Contract. Both Periods Are Equalized. At The Same Time, The Extension Of These Periods Is Possible. In Such A Case, Declaring A Longer Period Will Result In An Appropriate Score In The Offer Evaluation Criteria4. The Ordering Party Does Not Require The Contractor To Personally Perform Key Tasks Related To The Construction Works Covered By The Subject Of The Contract. 6. In Addition, The Employer Requires That Exits And Connections With The Existing Infrastructure Be Made In A Way That Allows The Use Of It By Disabled People And People With Reduced Mobility, And It Will Not Cause Any Difficulties With The Use Of The Created Infrastructure.1. The Ordering Party Requires The Contractor Or Subcontractor To Employ Persons On The Basis Of An Employment Contract Within The Meaning Of The Current Provisions Of The Labor Code To Perform Activities Related To The Execution Of The Order: 1. Earthworks, 2. Paving Works, 3. Assembly Works
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e17c5544-5e61-4c8a-b714-90c7a5a4768e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.