GTR 63408738
Tenders Are Invited For Mining Protection Of The Iin/264 Chamber And The Surroundings Of The Leopold Canal With The Leopold-Schmidt Chamber Complex At The Iin Position In The Wieliczka Salt Mine
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
63408738
Tendering Authority
Subscribe to view
Tender No
KSW/2023/INP/21
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Mining Protection Of The Iin/264 Chamber And The Surroundings Of The Leopold Canal With The Leopold-Schmidt Chamber Complex At The Iin Position In The Wieliczka Salt Mine
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
08-05-2023
Closed
Work Detail
1. Subject Of The Contract. The Subject Of The Contract Is The Performance Of Mining Works Aimed At Securing The Iin/264 Chamber And The Surroundings Of The Leopold Canal In The Leopold-Schmidt Chamber Complex At Pos. Ii In The Underground Part Of The “Wieliczka” Salt Mine, Hereinafter Referred To As “Mining Works”.2. Scope Of Works As Part Of Mining Works. As Part Of The Mining Works, The Contractor Is Obliged To: 1) Organize The Site (Area) Of The Works, 2) Prepare The Technology For Performing The Works, 3) Provide The Materials Necessary For The Execution Of Mining Works, 4) Provide The Machines And Devices Necessary For Perform Mining Works,5) Provide Persons With Appropriate Authorizations And Qualifications To Supervise Mining Works,6) Provide Surveying Services,7) Carry Out Mining Works.3. Execution Of Mining Works.3.1 Prior To Commencing Works In The Underground Workings Of The “Wieliczka” Salt Mine, The Contractor Is Obliged To Prepare The Technology For Their Execution, Agree It With The Services Reporting To The Operations Manager Of The “Wieliczka” Salt Mine (Hereinafter Referred To As Krzg), And Then , After Making The Arrangements, Its Submission For Approval By Krzg. The Technology Should Be In Accordance With The Krzg Order No. Ksw/Z/Krzg/42/2018 Of April 24, 2018, Constituting Appendix 1 To The Specification.3.2. Mining Works Should Be Performed In Accordance With: 1) Design Documentation Under The Name: Technical Design Of The Mining Protection Of The Iin/264 Chamber And The Surroundings Of The Leopold Canal In The Leopold - Schmidt Chamber Complex At Pos. Iin In The Wieliczka Salt Mine, Developed By Ksw S.A. In September 2019, Constituting Appendix No. 2 To The Specification,2) Permission No. 56/19 Of The Conservator Of Monuments Of The Krakow Saltworks Of December 6, 2019, Reference Number Dk-453-84/19, Constituting Appendix No. 3 To The Specification,3) Decision No. 11/21 Of The Conservator Of Monuments Of The Krakow Saltworks Of October 25, 2021, Reference Number Dk-453-84/19, Constituting Appendix 4 To The Specification,4) Conservation Recommendations Of The Conservator Of Monuments Of The Krakow Saltworks Of December 30, 2019, Reference Number Dk-453-98/19, Constituting Appendix No. 5 To The Specification, 5) Instructions For Fire-Retardant Impregnation Of Wooden Elements Of The Lining And Decoration Of Excavations In K.S. Wieliczka S.A. To Fire-Retardant Material, Constituting Appendix No. 6 To The Specification,6) Instructions For Safe Peeling Of Ceilings And Sidewalls In Underground Corridor And Chamber Workings Of The Wieliczka Salt Mine, Constituting Appendix No. 7 To The Specification,7) Instructions For Safe Manual Transport On The Surface And In Underground Workings Of The Wieliczka Salt Mine, Constituting Appendix No. 8 To The Specification,8) Instructions For Placing Derailed Underground Cars On The Track, Constituting Appendix No. 9 To The Specification,9) Instructions For Safe Performance Of Work Using Power Tools, Constituting Appendix No. 10 To The Specification,10 ) Ordinance Of The Krzg No. Ksw/Z/Krzg/48/2019 Of May 15, 2019 On The Selection Of Support For Excavations In The Wieliczka Salt Mine, Constituting Appendix No. 11 To The Specification, To The Extent Including The Verification Of The Technical Solutions Adopted In The Design Documentation .11) Ordinance Of The Krzg No. Ksw/Z/Krzg/101/2020 Of October 15, 2020 On The Introduction Of The Revised Instructions For The Use Of Bolt Supports In The Wieliczka Salt Mine, Constituting Appendix No. 12 To The Specification, To The Extent Including The Verification Of The Adopted In The Design Documentation Of Technical Solutions, 12) Instructions For Safe Work At Heights Using The Warsaw Scaffolding In The Underground Workings Of The Wieliczka Salt Mine, Constituting Appendix 13 To The Specification, 13) The Offer Submitted By The Contractor, 14) Ordinance Of The Krzg No. Ksw/Z/ Krzg/36/2021 Of April 22, 2021 On The Rules For Using Anchor Supports In Underground Mining Excavations, Constituting Appendix No. 14 To The Specification,15) Krzg Order No. Ksw/Z/Krzg/37/2021 Of April 22, 2021 On The Rules For The Inspection And Acceptance Of The Anchor Support, Constituting Appendix No. 15 To The Specification,16) Ordinance Ksw/Krzg/26/2020 Of March 5, 2020 On The Rules For Making Connections To The Compressed Air Network Installation, Constituting Appendix No. 16 To The Specification. 3.3. The Estimated Scope Of Mining Works Is Specified In The Following Bill Of Quantities: Securing The Chamber Iin/264, Level Iinlp. Planned Works Unit Quantity1 Stripping Of The Ceiling And Sidewalls M² 938.02 Stripping Of Rock Mass M³ 318.03 Stripping Of Compressed Excavated Material M³ 179.04 Drilling Of Vertical Inspection Holes In The Chamber Roof M 382.05 Installation Of Intersections Pcs. Diameter Min. 0.20 M Pcs. 20.07 Drilling Holes For Anchors In The Ceiling Of The 6-M-Long Chamber 86.08 Installation Of Glass-Epoxy Anchors In The Ceiling Of The 6-M-Long Chamber Pcs. 4 Anchors With A Length Of 2 M Pcs. 15.010 Installation Of Wooden Canopy Diam. 0.3 M, Length 5 M, 9.011 Pieces. Installation Of Wooden Canopy Diam. 0.3 M, 3.5 M Long, 57.012 Pieces. 0.3 M Pcs. 0.3M Pcs. 2.014 Installation Of Wooden Fence Stands With A Diameter Of 0.3 M Long And 3.0 M Long, Pcs. 20.015 Execution Of Ceiling Lining And Sidewalls Made Of 0.05 M Boards, M² 52.316 Installation Of A Bundle Of 9 Wooden Stands, Dia. 0.3 M And 2.5 M Long, Pcs. 1.017 Execution Of A Filling Belt From Excavated Material Behind The Lining On Sections No. 2 And 3 M³ 59.018 Reinforcement And Supplementation Of The Existing Salt Cubes Filling Belt On Section No. 3 From New Cubes M³ 1.019 Execution 14 Openwork Chests Filled With Spoil From Mines With A Diameter Of 0.3 Stacked In A Layer Every 0.75 M M³ 753.020 Filling The Chests With Spoil M³ 432.021 Execution Of 3 Full Wood Chests From Mines With A Diameter Of 0.3 Laid In A Layer Every 0.75 M M³ 21.0 Detailed Information On The Subject Of The Contract And The Rules For Its Implementation Are Included In The Contract Template Attached As Appendix 24 To The Specification, Which Is Available At: Https://Kopalniawieliczka.Ezajacyjacy.Pl
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4c3903f1-2ce1-4948-bf7a-81f6898d7115.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.