GTR 63254925

Quotation Are Invited For Removal And Overhauling Of Dn 1350 Non-Return Valve Of 93/94 Brine Recirculation Pump 11 & 12

NCB — National Competitive Bid Closed Asia
Tender Information
GTR Reference
63254925
Tendering Authority
Subscribe to view
Tender No
2332300883
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Removal And Overhauling Of Dn 1350 Non-Return Valve Of 93/94 Brine Recirculation Pump 11 & 12
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
17-04-2023 Closed
Work Detail
Quotation Are Invited For Removal And Overhauling Of Dn 1350 Non-Return Valve Of 93/94 Brine Recirculation Pump 11 & 12 1032301193Rfx Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. 1 Item-00001 Overhauling Of Brine Recirculation Pump Discharge Non Return Valve As Below Scope Of The Work. 1-#Removal Of Thermal Insulation And Cladding. 2-#Removal Of Hydraulic Cylinder Along Related Counter-Weight. 3-#Removal Of The Valve From The Pipeline. 4-#Transportati On Of Valve From Dewa Jebel Ali Site To Contractor Workshop. 5-#Disassemble The Valve And Clean All Parts Thoroughly With Un Iversal Cleaner After Dismantling. 6-#Prepare The Detailed Inspection Report With Recommendations And Submit Workshop Inspection Report To Dewa. 7-#Repair Of Damaged/ Deformed/ Corroded Parts Like, Seal Retainer, Retaining Ring, Valve Body, Butterfly Disc, Shaft, Etc. If Required, As Approved By Dewa Engineer. 8-#In Case Of Repairs By Welding Required, Submit Wps And Wpqr. 2 Set 9-#Any W Elding, Machining, Shaft Straightening, Etc. Required For Repairs Or Adjustments Are In Contractor Scope Of Work And No Addi Tional Charges Shall Be Considered. 10- Machining & Line Boring To Install New Thordon Bush Instead Of Existing Teflon Bush , All S Hall Be Provided By Contractor And No Additional Charges Shall Be Considered. 11- The Clearance Between Bush And Shaft From 0. 12 To 0.14 Mm 12-#Consumables Like Gaskets, O-Rings, Screws, Pins And Seals Shall Be Provided By Contractor And No Additional Ch Arges Shall Be Considered. 13-#Rebuild The Valve And Test For Smooth Operation. 14-#Carry Out Pressure Test 15-#Valve Body Paint Ing. 16-#Submit Assembly Report (Including Ndt Report And Pressure Test Report. 17-#Transportation Back To Dewa Jebel Ali Site. Special Notes / Instructions: Removal And Overhauling Of Dn 1350 Non-Return Valve Of 93/94 Brine Recirculation Pump 11 & 12 At L2-Station, Desalination, Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332300883
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1c495975-554c-4866-909e-db563b68a0ca.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders