GTR 63130402

Tenders Are Invited For Adaptation Of The Former Boiler Room For The Needs Of The Company Archive

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
63130402
Tendering Authority
Subscribe to view
Tender No
WOA.261.15.2023.BK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The Former Boiler Room For The Needs Of The Company Archive
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
24-04-2023 Closed
Work Detail
The Subject Of The Contract Is Construction Works Related To The Adaptation Of The Former Boiler Room For The Needs Of The Company Archive.1. The Implemented Investment Task Includes: Renovation Of The Existing Part Of The Building (Boiler Room) With Internal Installations: Electrical, Sewage, Cooling, Heating, In Accordance With The Documentation Developed By Firma Handlowo-Usługowa A&A, 35-055 Rzeszów, Ul. Naruszewicza 13/8.2. The Rooms Covered By Construction Works Are Located In The Basement (Level -1) In The Building Of The Regional Directorate For Environmental Protection In Rzeszów. The Adaptation Will Include A Boiler Room With A Fuel Store. The Scope Of Works Is Mainly Based On Cleaning, Securing And Insulating The Existing Walls In The Above-Mentioned Room, As Well As Bricking Up Window And Door Openings That Are Unnecessary In The Operation Of The Archive. The Works In Their Scope Include Broadly Understood Floor Finishes, Which Were Selected On The Basis Of The Expected Function, As Well As The Replacement Of Doors With Expertly Selected Ones For The Planned Function. In The Archive Room, It Is Planned To Install Lighting Adapted To The Planned Conditions, As Well As A Supply And Exhaust System Ensuring Adequate Comfort And Operation Of The Adapted Archive Room.3. In The Scope Of External Works, After Excavation Of The External Walls And The Room After The Coal Chute, Preceded By The Demolition Of The Cobblestone Surface, Preparation Of The Base Of The Fuel Depot Ceiling (Chute) Preparation Of The Substrate For External Walls For Waterproofing, Waterproofing Of The Fuel Depot Ceiling (Chute) And External Walls, Backfilling Excavations And Reconstruction Of The Surface Next To The Building, Maintaining The Slope From The Building. External Works Were Subject To Notification To The Architectural And Construction Administration Authority. A Certificate Was Obtained Confirming That There Are No Grounds To Object To The Notification Of The Intention To Perform Construction Works.4. As Regards Internal Works In The Room Of The Former Fuel Depot, It Is Planned To Demolish The Partition Wall Under The Joist, Prepare The Wall Base From The Inside For Waterproofing, Renovate And Desalinate The Intermediate Ceiling, Perform Surface Desalination Of Walls And Ceilings, Complete And Level The Concrete Base (Existing Floor) , Waterproofing The Floor, Building A New Wall Under The Joist, Waterproofing The Walls From The Inside (From The Base Concrete Level To The Ceiling), Plastering, Painting The Room.5. Within The Scope Of Internal Works In The Room Of The Former Boiler Room, It Is Planned To Brick Up Wall Openings Unnecessary For The Archive, Prepare The Base Of Internal Walls For Waterproofing, Supplement And Level The Concrete Base (Existing Floor), Make An Injection Diaphragm Of Reinforced Concrete Columns At The Level Of Basement Floors And Their Renovation, Renovation And Waterproofing Of Columns, Waterproofing Of Walls From The Inside (From The Base Concrete Level To The Ceiling), Execution Of A Reinforced Concrete Floor, Installation Works, Execution Of Plastering Works, Execution Of Spray Insulation From The Ceiling Above The Boiler Room, Painting Of The Room.6. Equipping The Archive Room With Sliding Shelves.7. Execution Of Installation Works In Particular Industries: 1) In The Architectural Industry: A) Construction Works In The Chute Room, B) Construction Works In The Boiler Room, C) Internal Insulation, D) External Insulation, E) Installation Of Racks, 2) In The Sanitary Industry: A ) Mechanical Ventilation Installation, B) Air-Conditioning Installation, C) Rainwater Drainage System, D) Sanitary Sewage System, E) Water Supply System, F) Fire Protection System, G) Central Heating System, 3) In The Electrical Industry: Electrical Installation. Exact Scope Of Works And Technology Of Execution Are Described In The Construction Design And The Technical Specification For The Acceptance And Execution Of Works Attached To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ba59ad01-9139-4b24-b12d-910b618c7533.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders