GTR 63130380

Tenders Are Invited For Adaptation Of The Gwpk Teaching Studio To The Needs Of People With Disabilities Along With The Replacement Of The Roofing In The Design And Build Formula

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
63130380
Tendering Authority
Subscribe to view
Tender No
GWPK.230.1.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The Gwpk Teaching Studio To The Needs Of People With Disabilities Along With The Replacement Of The Roofing In The Design And Build Formula
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
20-04-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Development Of Design And Cost Documentation And The Execution, In Particular, Of This Documentation Of Construction Works For The Task Entitled Adaptation Of The Gwpk Teaching Studio To The Needs Of People With Disabilities Along With The Replacement Of The Roofing In The Design And Build Formula, Co-Financed Under The Grant Implemented By The State Fund For Rehabilitation Of Disabled Persons Entitled Accessible Natural Parks As Part Of The Protected Area, Accessible Area Project, Under Measure 4.3 Of The Operational Program Knowledge Education Development 2014-2020, Priority Axis Iv Social Innovation And Transnational Cooperation, Measure 4.3 Transnational Cooperation, For The Implementation Of The Grant Project Entitled Nature Without Barriers - Active People With Disabilities. Location: The Subject Of The Contract Will Be Implemented On Plots No. Characteristic Parameters Of The Subject Of The Contract: • Preparation Of Technical Documentation For Ramps And A Platform For The Disabled. • Delivery And Assembly, Installation, Commissioning Of The Platform - An External Vertical Lift With A Lifting Height Of Up To 3 Meters For The Disabled, Made Of Galvanized Elements And Stainless Metals With Resistance To Operation Of External Conditions With A Robust Drive System Along With The Necessary Accompanying Devices. The Contractor Will Obtain The Necessary Technical Documentation Of The Device, The Necessary Acceptance And Approval For Use, Including The Office Of Technical Inspection. • Purchase And Installation Of The Elevator Bell And The Door Bell. ), Activated By Pulling A Cord, A Ceiling System That Triggers The Activation Of A Signal Lamp And An Audible Signal Outside The Room. • In The Toilet For The Disabled On The Ground Floor, Provide And Install A Changing Table For Small Children And Infants Made Of Antibacterial Hdpe Plastic, Telescopically Opened, Resistant To Maximum Load Up To 20 Kg (Children Up To 3 Years Old), With Ce Declaration Standard En 12221- 1999 - Directive 2001/95/Ec General Product Safety (1 Piece). • Stair Steps Of The Internal Staircase Should Be Secured With Anti-Slip Tape (Purchase And Install Anti-Slip Tape On The Stairs). • In The Internal Staircase Of The Building, Provide And Install Wall Handrails On Brackets, Referring In Color To The Existing Balustrade (2 Pieces). • In The External Car Park, Mark Two Parking Spaces With A Blue Surface For The Disabled - Making A Horizontal Parking Space Sign For People With Disabilities, Purchase And Mark With A Vertical Road Sign (2 Pieces), Meeting All The Requirements Of The Relevant Regulation, Such As: Size, Color, Assembly Method, Suspension Height, Distance From The Road, Line Thickness, Line Angle, Etc. • Two Ramps For Wheelchairs And Childrens Wheelchairs To The Shed And Gazebo In The Educational Garden, Made Of Materials Referring To The Existing Surfaces. • Reconstruct The Cascade In The Pond In The Educational Garden. The Redevelopment Will Consist In Creating A Greater Slope Of The Flowing Water By Increasing The Height Of The Cascade. It Is Planned To Dismantle The Existing Cascade And Pond, Remove Stones, Algae Layer, Deepen The Depression, Cover The Pond Walls With Mineral Wool, For Protection Of Epdm, With A Double Layer Of Non-Woven Fabric. The Construction Of The New Cascade And The Walling Of The Pond Should Be Made Of Large Stone Slabs. Connect The Water Supply To The Water Stream With A New Pump With A Filter To Generate A More Intense Noise Of The Water Flowing Over The Stones. • Deliver And Install 32 Pieces Of Contrasting Braille Plates For Doors, Switches, Buttons, Etc. Inside The Building. • Deliver And Install A Board Informing About The Accessibility Of The Facility For The Disabled. The Information Board Will Be Made In Contrasting Colors And With Enlarged Print. • On The Front Wall From Kołłątaja Street, Put The Name Of The Building, Logo And Address. • Replace The Roof Covering Of The Teaching Building (Gwpk) With Checking The Technical Condition Of The Roof Structure (Financed From The Employers Own Funds). • Delivery With Assembly, Installation Of Control Automation With Wiring, With Instrumentation, Start-Up Of The Central Heating Boiler (Financed From The Employers Own Funds). The Contractor Will Deliver All Devices, Brand New Elements, Production Year 2022, 2023. The Contractor Will Install Elements Of Equipment That Require Assembly And Connections. Note! A Detailed Description Of The Subject Of The Order Is Specified In The Functional And Utility Program - Appendix No. 1 To The Swz, Developed By The Design And Supervision Studio Wamar Ul. Lotnicza 14, 87-800 Włocławek. The Ordering Party Has Made Every Effort To Ensure That The Description Of The Subject Of The Order Does Not Include Any Trademark, Patent Or Origin, Source Or Special Process That Characterizes The Products Or Services Provided By A Specific Contractor. If A Trademark, Patent Or Origin, Source Or Specific Process Is Indicated In The Procurement Documents, This Is For Information Purposes Only. In Art. 101 Sec. 1 Point 2 And Sec. 3 Of The Public Procurement Law, The Contracting Authority Allows Offering Solutions Equivalent To Those Described, Provided That The Proposed Solutions Meet The Requirements Set Out In The Description Of The Subject Of The Contract To An Equivalent Degree. . 101 Sec. 5 And 6 Of The Public Procurement Law. The Subject Of The Contract Should Take Into Account The Requirements For Accessibility For People With Disabilities And Design For All Users. Detailed Obligations Of The Contractor In The Implementation Of This Contract Are Specified In The Draft Provisions Of The Contract - Appendix 2 To The Swz. Warranty And Guarantee Period For The Subject Of The Contract - In Accordance With The Offer Presented By The Contractor, But Not Less Than 3 Years From The Moment Of Signing The Final Protocol (Maximum 5 Years). 2. Employment Requirements Based On An Employment Relationship, In The Circumstances Referred To In Art. 95 Of The Public Procurement Law: The Contracting Authority Requires Pursuant To Art. 95 Sec. 1 Of The Public Procurement Law, Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing Activities In The Scope Of Contract Performance, If The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2022, Item 1510, As Amended), I.E. Manual Workers Performing The Following Works During The Task: Demolition, Preparatory, Disassembly, Assembly , Installation. The Contracting Authority Does Not Require That Persons Performing Independent Technical Functions In The Construction Industry Be Employed Under A Contract Of Employment. In Order To Verify The Employment, By The Contractor Or Subcontractor, On The Basis Of An Employment Contract, Of Persons Performing The Activities Indicated By The Ordering Party In The Scope Of Contract Performance, The Ordering Party Requests In Particular: The Contractors Or Subcontractors Statement (List Of Persons) On The Employment Of An Employee Under An Employment Contract, Containing Information, Including Personal Data, Necessary To Verify Employment Under An Employment Contract, In Particular The Name And Surname Of The Employed Employee, The Date Of Concluding The Employment Contract, The Type Of Employment Contract And The Scope Of The Employees Duties. The Above Will Be Provided To The Ordering Party At The Latest On The Date Of Conclusion Of The Contract. The Ordering Party Reserves The Right To Demand From The Contractor At Any Time The Execution Of The Subject Of The Order Certified Copies Of The Employment Contract Of The Employed Employee And The Statement Of The Employed Employee. If It Is Necessary To Introduce Changes In The Composition Of The Team Performing The Works, The Contractor Shall Notify The Employer Of This Fact. During The Execution Of The Order, The Ordering Party Is Entitled To Perform Control Activities Towards The Contractor Or Subcontractor Regarding The Fulfillment By The Contractor Or Subcontractor Of The Requirement To Employ Persons Performing The Activities Indicated Above Under An Employment Contract. In The Event Of Justified Doubts As To The Compliance With Labor Law By The Contractor Or Subcontractor, The Ordering Party May Request An Inspection By The National Labor Inspectorate.3. The Contractor Will Undertake To Comply With The Provisions On The Protection Of Personal Data Resulting From The Gdpr1), And Therefore, To Submit A Statement With The Following Content: I Declare That I Have Fulfilled The Information Obligations Provided For In Art. 13 Or Art. 14 Of The Gdpr1) To Natural Persons From Whom I Obtained Personal Data Directly Or Indirectly In Order To Apply For A Public Contract In This Procedure.*1) Regulation (Eu) 2016/679 Of The European Parliament And Of The Council Of 27 April 2016 On Protection Of Individuals With Regard To The Processing Of Personal Data And On The Free Movement Of Such Data, And Repealing Directive 95/46/Ec (General Data Protection Regulation) (Official Journal Eu L 119 Of 04/05/2016, P. 1). * In The Event That The Contractor Does Not Provide Personal Data Other Than Those Directly Related To Him Or There Is An Exclusion Of The Information Obligation, Pursuant To Art. 13 Sec. 4 Or Art. 14 Sec. 5 Of The Gdpr, The Contractor Does Not Submit The Content Of The Declaration (Removal Of The Content Of The Declaration, E.G. By Deleting It).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4e43943a-7e65-4b30-aaa6-30dd9ddc3a6e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you