GTR 63017491

Tenders Are Invited For Modernization Of The Water Treatment Plant In Boguchwała

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
63017491
Tendering Authority
Subscribe to view
Tender No
RGT.ZP.271.1.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Water Treatment Plant In Boguchwała
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
21-04-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Modernization Of The Water Treatment Plant In Boguchwały (Suw) Gm. Miłakowo Plot 294/58, Precinct 0002 Boguchwała. The Basic Material Scope Of The Task Includes The Execution Of: A) Construction Of A New Suw Building. B) Disassembly Of The Current Fence And Installation Of A New One. C) Construction Of One Retention Tank, Insulated And Protected Against Corrosion. D) Modernization/Renovation Of Backwater Sedimentation Tanks. E) Modernization Of Lighting. F) Execution Of Internal Water And Sewage Installations Along With The Assembly Of Fittings; Such As Filters With Accessories, Aerator, Gate Valves, Pipes, Etc. G) Electrical Installation Of The Water Treatment Plant. H) Execution Of Heating And Ventilation. I) Implementation Of A Computer System And Its Integration Into The Existing System Located In Suw Miłakowo - Possibility Of Remote Control. J) Execution Of External Technological Networks With Fittings. K) Construction Of A New Well With Casing Of The Well; As Well As The Construction Of The Casing Of The Existing Well, Including The Replacement Of The Discharge Pipe To The Water Treatment Plant. L) Delivery And Installation Of A Power Generator - Mobile, With A Light Housing. M) Installation Of Flowmeters In Any Necessary Place. N) Installation Of Booster Pumps. O) Rinsing The Filters With Water In The Holding Tank. P) Installation Of Uv Lamps. Q) Execution Of Control Cabinets. R) Installation Of A Set Of Compressors For Aeration. S) Installation Of The Blower For Water Treatment. T) Construction Of Separate Rooms: Chlorinator, Sanitary And Office Facilities. U) Full Automation Of The Process. V) Replacement Of A Submersible Pump In The Existing Well And Implementation Of A Modern Start System. W) Installation Of Air Dryers. 2. Basic Scope Of Works: A) Construction Of A New Station Building In Steel Hall Technology, Adjacent To The Existing Suw Building, B) Delivery And Installation Of A New Technological Water Treatment System, C) Delivery And Installation Of 1 Treated Water Storage Tank With Capacity Of 25 M3, D) Construction Of A New Deep Well - With A Capacity Of 28 M3/H And A Planned Depth Of > 100 M, E) Construction Of Water, Sewage And Electricity Networks/Connections, F) Renovation Of Backwater Tanks, G) Construction Of An Exit From A Public Road And Communication Within The Station Area, H) Delivery Of A Mobile Power Generator Up To 50 Kw, With A Light Roof.3. The Implementation Of The Subject Of The Contract Is Divided Into 2 Stages: 1) Stage I Of The Task - Preparation Of Design Documentation For The Water Treatment Plant Along With The Necessary Infrastructure, Including Construction And Technical Infrastructure, Prepared On The Basis Of The Functional And Utility Program (Pfu) And Obtaining A Building Permit. A Multi-Discipline Construction Design Is To Include: - Land Development Design, - Architectural And Construction Design, - Technical Design; Structural Designs Along With The Method Of Assembling Structures And Devices To The Ground, If Necessary, Technological Designs. As Part Of The Construction And Detailed Design, The Contractor Is Obliged To Detail The Solutions That Are Described In The Fup, And Also Propose Other Solutions Than In The Fup, If Obtained In This Way There May Be Benefits For The Quality, Cost Reduction Or Improvement Of The Usability Of The Erected Facilities. The Ordering Party Reserves The Right To Approve Or Reject Such Changes In The Initial Period Of Design Works. Its Destiny. In Particular: - Execution Of Construction Works For The Construction Of The Water Treatment Station And The Necessary Infrastructure In Accordance With The Approved Construction Design. - Authors And Geological Supervision During The Implementation Of Construction Works. - Providing Full Geodetic Services During Construction Works. - Conducting The Required Tests And Tests And Preparing The Necessary Acceptance And As-Built Documentation And Obtaining The Required Documents On Behalf Of The Employer Related To Commissioning And Use Of The Facility.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d13496dc-ccf3-4f1a-8623-771765c2a58e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders