GTR 62977521
Tenders Are Invited For Modernization Of The Corridor And Replacement Of Sewage Risers - Adaptation Of The Project For The Reconstruction Of The Clinic K, In Accordance With The Concept Of The Reconstruction Of The Facility Of Polkowice Centrum Usług Zdrowotnych Zoz S.A.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62977521
Tendering Authority
Subscribe to view
Tender No
DZP-28/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Corridor And Replacement Of Sewage Risers - Adaptation Of The Project For The Reconstruction Of The Clinic K, In Accordance With The Concept Of The Reconstruction Of The Facility Of Polkowice Centrum Usług Zdrowotnych Zoz S.A.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
18-04-2023
Closed
Work Detail
1. The Subject Of The Contract Is The Modernization Of The Corridor And The Replacement Of Sewage Risers - Adaptation Of The Project For The Reconstruction Of The Clinic K, In Accordance With The Concept Of The Reconstruction Of The Facility Of Polkowice Centrum Usług Zdrowotnych Zoz S.A.2. A Detailed Description Of The Subject Of The Contract Includes: 1) Execution Of Construction Works In Accordance With The Technical Design, Including: 1.1. Demolition And Demolition Works, Including: - Demolition Of Walls; - Disassembly Of Window And Door Joinery; - Disassembly Of Internal And External Window Sills; - Removal Of Plaster; - Disassembly Of Floor And Wall Finishing; - Disassembly Of Existing Sanitary And Electrical Equipment; 1.2. Preparatory Works, Including: - Cleaning The Surface Of Old Cladding And Coatings, - Processing Of Openings And Technological Culverts In Building Partitions, - Reprofiling Of Cleaned Surfaces, - Incorporation Of System Expansion Joints, - Preparation Of Primers For Finishing Coatings1.3. General Construction And Assembly Works, Including: - Bricking Up The Door Openings; - Construction Of Partition Walls In A Lightweight Building System; - Plastering Of Internal Walls; - Execution Of Interior Wall Finishing; - Execution Of Floor Finishing; - Execution Of Ceiling Finishing; - Installation Of Internal Door Joinery; - Installation Of External Window Joinery; - Installation Of External And Internal Window Sills 2) Installation Works In Accordance With The Technical Design, Including: 2.1. Sanitary Installations2.1.1. Demolition Works, Disassembly - Disassembly Of Sanitary Installation Approaches, - Execution Of Uncoverings Of Existing Risers And Levels Of Sanitary Installation, 2.1.2. Installation Works - Execution Of Ditches For Installation Assemblies, - Replacement Of Existing Cold Water, Hot Utility Water And Sewage Risers - Covering Of Grooves And Openings 2.2. Heating Installations:2.2.1. Demolition Works, Disassembly - Disassembly Of Radiators, 2.2.2. Installation Works - Replacement Of Risers And Installation Distributions, - Making Installation Approaches To Newly Designed Radiators, - Installation Of Newly Designed Radiators, - Covering Grooves And Openings 2.2.3. Room Air-Conditioning System,- Execution Of Air-Conditioning System Pipelines,- Execution Of Condensate Drainage System With Connection To The Sanitary Sewage System,- Installation Of Air-Conditioning Units And Units,- Covering Of Furrows And Openings2.3. Electrical Installations2.3.1. Demolition Works, Disassembly - Disassembly Of Electrical And Teletechnical Installation Cables, - Disassembly Of Boards/Switchboards, 2.3.2. Installation Works - Switchgear Installation - Distribution Of Cable Routes For Basic, Emergency, Evacuation Lighting Installations, Plug Sockets And Teletechnical, - Installation Of Luminaire Control - Connectors - Installation Of Basic And Emergency Lighting Luminaires, - Installation Of Plug Sockets, - Installation Of Evacuation Signs, - Installation Of Lighting Luminaires Emergency, - Performing The Measurements Required By The Regulations, Together With The Reports Confirming Their Execution2.4. Lightning Protection System - Installation Of Vertical Air Terminals, - Connection Of Newly Built Air Terminals To The Existing Lightning Protection System Of The Building, - Performance Of Measurements Required By Regulations, Together With Protocols Confirming Their Execution.2.5. Installation Of Structured Cabling - Distribution Of Structured, Copper And Fiber Optic Cabling - Installation Of Structured Cabling Sockets, Patch Panels, Rack Cabinets, - Connections Of Newly Built Structured Cabling Installations To The Existing Installation, - Execution Of Call System With Lamps And Buttons, - Execution Of The Required By Law Measurements Along With Protocols Confirming Their Performance. 3) Other Works Including:3.1. Delivery And Assembly Of Equipment And Room Equipment In Accordance With The Technical Design; 4) Performing Cleaning Works After Construction Works 3. A Detailed Description And Method Of Order Execution Are Included In The Description Of The Subject Of The Order (Opz), Constituting Appendix No. 8 To The Swz And Results From The Following Documents: 1) Specification Of Execution And Acceptance Of Construction Works For The Architectural And Construction Industry, Prepared By Mgr Inż. Grzegorz Kędzierski; 2) Technical Specifications - Electrical, Teletechnical And Low-Current Installations; 3) Specification Of Execution And Acceptance Of Construction Works For The Sanitary Industry, Prepared By Mgr Inż. Wojciech Kuśnierkiewicz;4) Technical Design;5) Auxiliary Bill Of Quantities For Construction Works For The Architectural And Construction Industry, Developed By Eng. Bartosz Borowiecki;6) Auxiliary Bill Of Quantities For Construction Works For The Electrical Industry, Prepared By Mgr Inż. Michał Nagórka;7) Auxiliary Bill Of Quantities For Construction Works For The Sanitary Industry, Prepared By Mgr Inż. Wojciech Kuśnierkiewicz.8) Technical Description Of Devices And Equipment Of Rooms In Accordance With The Technical Design: A) Appendix No. 9A To Swz: Furniture With A Structure Made Of Furniture Board, B) Appendix No. 9B To Swz: Furniture With An Aluminum Profile Structure Filled With Furniture Board, C) Annex 9C To The Swz: Medical Chair With Backrest, D) Annex 9D To The Swz: Swivel Armchair With Height Adjustment, E) Annex 9E To The Swz: Upholstered Chair With Armrests, F) Annex 9F To The Swz: Gynecological Chair, G ) Attachment No. 9G To The Swz: Treatment Trolley, H) Attachment No. 9H To The Swz: Treatment Trolley With Cuvettes, I) Attachment No. 9I To The Swz: Scale With Height Gauge, J) Attachment No. 9J To The Swz: Wooden Medical Couch, K) Attachment No. 9K To Swz: Rehabilitation Ladder, L) Appendix No. 9L To Swz: Ceiling Treatment Lamp.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
67e676d5-f7c3-4015-a7e4-0abd1aecca95.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.