GTR 62850278
Tenders Are Invited For Adaptation Of The Facility To Fire Protection Requirements, Including Adjustment Of Communication Routes With Separation Of Stairways, As Well As Purchase And Installation Of Fire Safety Systems.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62850278
Tendering Authority
Subscribe to view
Tender No
ZP-1/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The Facility To Fire Protection Requirements, Including Adjustment Of Communication Routes With Separation Of Stairways, As Well As Purchase And Installation Of Fire Safety Systems.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
14-04-2023
Closed
Work Detail
The Subject Of The Contract Is The Adaptation Of The Facility To Fire Safety Requirements, Including The Adaptation Of Communication Routes With The Separation Of Staircases, As Well As The Purchase And Installation Of Fire Safety Systems. The Works Covered By The Contract Will Be Performed In The Building Where The Statutory Medical Activity Is Carried Out. During The Renovation, Only The Rooms Covered By The Proceedings Will Be Excluded From Use. Areas Of Rooms Under Renovation: - Basement Staircases - 72.64 M², - Ground Floor Staircases - 82.75 M², First Floor Staircases - 102.39 M² - Second Floor Staircases - 48.05 M² - Attic Staircases - 69.77 M². The Floors In The Staircases Are To Be Made Of Gres/Granite Tiles. The Reconstruction Consists In The Modernization And Renovation Of Three Staircases, The Installation Of A Smoke Extraction System And Sap Installation, And The Improvement Of The Technical Condition Of The Facility. Staircase Fire Separation And Smoke Extraction Will Be Carried Out In Stages. In The Hospital Building, A Staircase Smoke Exhaust System Should Be Used: - For The Kl 1 And 2 Staircases, The System: • Smoke Exhaust Will Be Implemented By Means Of Smoke Exhaust Vents With An Actuator, Located In The Roof Above The Staircase - Compensation Air Inflow In The Lower Part Of The Staircase: In The Basement And On The Ground Floor Through The Entrance Door To The Staircase. There Are To Be Smoke Detectors On Each Of The Staircases, Manual Smoke Removal Buttons On Each Floor, As Well As Ventilation Buttons And Weather Stations. The Fire Alarm System Is To Include: - Organization Of The Signaling System On The Site, - Installation Of The Installation, - Arrangement Of Devices According To The Drawings And Materials Included In The Ssp Installation. Construction Works To Be Performed: 1) Demolition Works, Disassembly: - Disassembly Of Wooden And Pvc Doors (Without A Certificate) With Frames - Disassembly Of Pvc Flooring, Tiles And Wooden Stair Treads - Disassembly Of Baseboards - Disassembly Of Metal Thresholds - Disassembly Of Bumpers From Walls And Protective Strips - Disassembly Of Lighting Fittings And All Elements Of Installation Casings - Disassembly Of All Elements Of Equipment From Walls - Disassembly Of Technical Boxes And Technical Cabinets - Disassembly Of Ventilation Grilles - Disassembly Of Radiators - Disassembly Of Information Boards - Removal Of Loose Plaster And Paints From Walls And Ceilings - Removal Of Paints From Walls And Ceilings - Disassembly Of Electrical And Heating System Elements, - Removal Of Floors And Cladding, - Demolition Of Wooden Steps On A Brick Or Concrete Vault, - Disassembly Of Wooden Balustrades. Construction Of Gkf Board - Supplementing The Floors - Making A Self-Levelling Screed To The Extent Necessary - Laying A New Floor Made Of Granite Stoneware Tiles In A Contrasting Color Than The Treads, - Making A New Plasterboard Wall On A Frame (According To The Drawing Part) - Installing Doors To Rooms, Main Doors Entrance Doors (According To The List Of Door Joinery) - Supplementing The Plaster In The Place Of Losses Caused During The Replacement Of Window Joinery (Internal And External) Along With Repainting The Recesses - Installation Of Electrical And Teletechnical Installations (Separate Industry Study), - Installation Of Fire Protection Installations, - Emergency And Night Lighting - Plastering New Masonry Elements - Replenishing Plasters On Walls And Ceilings (To The Extent Necessary) And Installing System (Suspended) Ceilings - Punching Holes, Making Grooves For Cables - Installing Wall Coverings With A Rough Surface - Priming, Double Leveling And Painting With Paint (According To With Guidelines) Of Walls - Installation Of System Plasterboards And Installation Casings (With Revisions) Along With Their Priming And Painting - Installation Of Fenders, Corner Protections And Protection Against Mechanical Damage To Walls (In Accordance With The Branch Technology) - Installation Of Handrails And Handrails For The Disabled - Installation Of Radiators And Lighting Fittings (Separate Industry Studies) - Assembly Of Installation Equipment (In Accordance With Industry Documentation) - Assembly Of New Information Boards And Decorative Elements - Removal Of Security Measures, - Tidying Up The Construction Site.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c123da9d-8cf4-4b87-89a3-9dec1bbf111d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.