GTR 62478768
Tenders Are Invited For Expansion, Modernization And Thermal Modernization Of The Rescue And Firefighting Center Of The Volunteer Fire Brigade In Czarna Białostocka.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62478768
Tendering Authority
Subscribe to view
Tender No
Or.271.7.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion, Modernization And Thermal Modernization Of The Rescue And Firefighting Center Of The Volunteer Fire Brigade In Czarna Białostocka.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-04-2023
Closed
Work Detail
A Detailed Description Of The Subject Of The Contract Can Be Found In Appendix No. 1 To The Tor. As Part Of The Task, It Is Necessary To Modernize The Building Of The Fire Station Of The Volunteer Fire Department Consisting In The Extension Of The Building With A Garage For Ambulances Along With The Superstructure Of The Roof Over The Garage In The Ground Floor Part With The Enlargement Of The Garage Door, The Superstructure Of The Roof Of The Tower, Insulation Of The Façade And The Roof Along With The Renovation Of Rooms And Internal Installations, Along With The Exhaust Flue Gases And Land Development, At Ul. Tartaczna 5 In Czarna Białostocka, Plot No. 884/2, 884/1, 882, Located Within Geodes. Czarna Bialystok, Commune Czarna Białostocka. In The Scope Of Modernization: • Expansion Of The Existing Fire Brigade Building With A Garage For Ambulances, • Superstructure Of The Roof Over The Garage In The Ground-Floor Part Of The Rafter Structure Based On The Walls And Enlargement Of The Garage Door, • Superstructure Of The Roof Of The Tower, • Internal Walls - Filling, Priming And Painting With Matt Silicone Paints With Increased Resistance To Dirt And With A Multiple Washable Cycle In White, • Ceilings - Puttying, Priming And Painting With Latex Acrylic-Composite Paints In White, • Replacement Of Internal Window Sills With Conglomerate, • Execution Of New Floor Layers After Removing The Old Ones In All Rooms With Anti-Water And Anti-Moisture Insulation •Land Development.•Installation Of New Window Joinery •Gable Roof Over The Unused Attic•Mono-Pitch Roof Over The Fire Engine Garage •Gable Roof Of The Tower With An Angle Of Inclination Of 35O •Mono-Pitch Roof Over The Social Part Of The Ground Floor • Roof Covering Materials, Flashings, Soffits, Gutters And Metal Facade Flashings Should Be Made In Gray Ral 7016 Matt, • Delivery And Assembly Of The Platform, Platform Balustrades Made Of Hot-Dip Galvanized Steel Elements, • Overlaying 3 Pcs Of Existing, Single-Channel Ventilation Chimneys, • Extend Two Ventilation Ducts • Extend The Ventilation Pipe Of The Sanitary Sewage System By Approx. 150 Cm And End It With A Vent, • Dismantle The Reinforced Concrete Column And The Alarm Siren Mounted On It Together With The Wiring, Hand Over The Dismantled Elements To The Facility Manager, • Dismantle The External Equipment Of The Facility • Execution And Installation Of The Osp Czarna Sign Białostocka In The Documentation Indicated In The Documentation •Insulation Of External Walls Above The Ground •Execution Of Flashings, •Modernization Of Internal Installations Of The Sanitary Industry •Modernization Of The Electrical Installation In The Scope Of Extension: •Execution Of Reinforced Concrete Footings And Footings Poured On Site, •Execution Of Concrete Block Foundation Walls Those Concrete Gr. 25 Cm On Cement-Lime Mortar M10•Execution Of Horizontal Insulation On Footings,•Masonry Works •Execution Of Vertical Insulation On Walls,•Assembly Of New Internal And External Windows And Doors According To The List Of Joinery,•Execution Of Concrete Base For Floor Layers Of The Ground Floor,•Work Carpentry •Covering Works Made Of Steel Sheet •Insulating The Building •Execution Of Sanitary Installations, •Execution Of Electrical Installations •Finishing Works In Terms Of Land Development: •Disassembly Of The Remains Of Hardening, •Execution Of The Base, •Execution Of Hardening, Accesses And Access Roads From Prefabricated Concrete Openwork Slabs With Minimum Dimensions Of 600X400x80 Mm And Made Of Concrete Cubes 80 Mm Thick With Pavement Framing With Road Curbs And Concrete Edges, • Construction Of A Fence Of The Area Made Of Prefabricated, 3D Embossed, Wire Mesh Panels, Min. 5 Mm, Galvanized And Powder Coated With Gray Polyester Paint, Mounted On Posts Made Of Steel Profile With Min. Dim. 60X40x1.5 Mm, Secured As Above With A Concrete Foundation Of Prefabricated Concrete Boards, Min. 20 Cm And Gr. Min. 55 Mm With Concrete Connectors And Sockets For Poles, Delivery And Assembly Of Two Double-Leaf Swinging Gates With Dimensions Each 500X150 Cm From Prefabricated Panels Like A Fence In A Closed Profile, Min. 60X40x1.3 Mm Mounted On Gate Posts, Min. 80X80x4 Mm, With Bottom Locking Of Each Part Of The Gate And Transversal Locking With A Key Lock, • Delivery And Assembly Of Stainless Steel U-Type Bicycle Racks For 3 Bicycles To Be Installed On A Paved Area At The Entrance To The Ground Floor Part Of The Building From The North, • Leveling, Leveling, Topsoiling And Sowing Of Grass. The Contractors Tasks Also Include: - Development Of A Geodetic As-Built Inventory - 3 Copies, - Prior To Commencing Construction, Agree On The Land Development Plan In Terms Of Collisions With The Administrators Of Power, Telephone And Sanitary Networks, - Preparation Of Pictograms (Toilets: Technical (Warehouse, Heating Substation, Multifunctional Room, Office Room, Etc.) And Identification (Numbering) Of Doors To Rooms Of The Building With Described Tags For The Keys Of The Operated Locks, - Providing The Tsos Mates With The Possibility Of Entering And Exiting The Firehouse Area, - Implementation Of The Task On Traffic” Of An Object Of Strategic Importance In Terms Of Fire Protection For The Area Of Operation Doe - Implementation Schedule To Be Agreed With The Facility Manager, - Disassembly Of The Showcase With The Figure Of St. Floriana To Carry Out Facade Works And Re-Assembly In The Location Indicated In The Design, - Installation Of Two Double Flag Holders In Places Agreed With The Facility Manager, - Border Points Destroyed During Implementation Should Be Re-Established And Permanently Stabilized, A Report Required By Law In In Terms Of Real Estate Divisions, - Obtaining An Occupancy Permit On Behalf Of The Ordering Party (Preparation Of Notifications To Sanepid And The Fire Brigade, Participating In Facility Inspections, Removing Identified Defects And Shortcomings, Incurring The Cost And Obtaining Positive Inspection Reports, - The Ordering Party Provides For A Phased - Monthly Settlement Of Works Depending Payment For A Specific Stage Of The Works In Accordance With The Presented And Approved Material And Financial Schedule, Their Actual Execution Confirmed By The Investors Supervision Inspectors, A Written Notification Of The Completion Of The Works Stage Submitted To The Employer And After The Protocol Confirmation Of This Fact, - The Employer Informs That The Costs Related To The Consumption Of Electricity, Heat, Water And Sanitary Protection Are Borne By The Contractor Based On Separate Agreements With Network Administrators Or With Specialized Companies Providing Such Services, - The Contractor Will: - Carry Out Test Runs Of The Installation What. And Hot Water, - Carrying Out Test Runs Of The Exhaust Gas Extraction Technology, - Carrying Out Test Runs Of The Power Generator Technology Along With The Preparation Of Operating Instructions And Connecting The Above-Mentioned Aggregate, Alarm Siren, Etc. - Carrying Out Test Runs Of The Air-Conditioning System - Carrying Out Test Runs Of Emergency Evacuation Lighting, Appropriate Protocols Should Be Drawn Up For Trial Movements. Trial Operations Should Be Carried Out Until The Positive Effects Assumed By The Project Are Achieved (E.G. Heating And Cooling To The Assumed Parameters And Their Maintenance, Switching On The Power Generator, Switching On Emergency And Evacuation Lighting, Etc.), - All Dismantled Elements Of The Fence, Roofing, Flashings, Metal Gutters And Downspouts, After Cleaning, Should Be Deposited In The Place Designated By The Administrator For Further Development. The Investment Should Be Valued And Performed In Accordance With The Design Documentation, The Bill Of Quantities Is Only An Auxiliary Element To Prepare The Offer .
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
15fc9f46-e917-4627-9848-1efa40b4871e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.