GTR 62425980

Tenders Are Invited For Reconstruction Of Roads In Former State-Owned Estates In Klępicz, Bielin And Stare Objezierze

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
62425980
Tendering Authority
Subscribe to view
Tender No
ISR.271.2.2023.ZP
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Roads In Former State-Owned Estates In Klępicz, Bielin And Stare Objezierze
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-04-2023 Closed
Work Detail
The Subject Of The Contract Is Roads In Former State-Owned Farm Estates In The Following Scope: Preparatory And Demolition Works, Foundations, Resistors And Edges, Pavements, Marking, Finishing Works, A Detailed Description Of The Subject Of The Contract Is Included In The Technical Documentation And Technical Specifications For The Execution And Acceptance Of Works. Due To The Flat-Rate Nature Of The Remuneration, Bills Of Quantities Are Attached For Information Purposes Only And Do Not Constitute The Basis For The Valuation. 2) Under This Order And The Offer Price, The Contractor Will Be Obliged To Perform And Ensure: The Provisions Of The Law On Health And Safety And Fire Protection Conditions, C) In The Case Of Using Subcontractors, Coordinating The Works Of Subcontractors, Bearing Full Responsibility For Them, D) Ensuring Technical Supervision Over The Task Being Carried Out, Supervision Of Personnel In The Field Of Work Order And Discipline, F) Proper Maintenance Of Construction Documentation G) During The Performance Of The Order, Ensure That All Materials Used To Perform The Subject Of The Contract Have Been Admitted To Trading And Have Appropriate Declarations Of Compliance With The Applicable Standards. Contractor, Above At The Request Of The Ordering Party, The Documents Shall Be Delivered Upon Final Acceptance. The Assembly Of Any Materials And Equipment Without Valid Certificates Is Excluded, H) Requirements For Works - All Works Should Be Carried Out In Accordance With Applicable Regulations, Applicable Standards, Technical Conditions And Construction Art, Health And Safety And Fire Protection Regulations. With The Recommendations Of The Employers Supervision Inspector, And In Accordance With The Requirements Of The Design Documentation And The Guidelines Of This Specification, As Well As With Other Attachments, I) The Contractor Is Obliged To Restore The Proper Condition And Order Of The Construction Site, As Well As (If Used) Roads, Real Estate, Equipment, Structures, Etc., Which The Contractor Violated While Performing The Subject Of The Contract, J) Covering The Costs Related To The Development Of Traffic Organization Designs And The Occupation Of The Road Lane Future Events Or Circumstances That May Adversely Affect Or Delay The Performance Of The Contract. 4) The Contractor, As Part Of The Remuneration Specified In The Offer, Is Obliged To Mark And Secure The Place Of Works For The Duration Of Their Implementation, Own Materials Purchased By The Contractor. 7) The Contractor Is Obliged To Remove Within 6 Hours Of Disclosing The Failure Or Becoming Aware Of The Failure On The Existing Equipment Caused By Or Related To The Contractors Works Directly Or Indirectly, Including In Particular Failure To Exercise Due Diligence And Caution When Carrying Out Works In The Immediate Vicinity Of Existing Equipment. The Employer Reserves The Right To Substitute Failure Removal At The Contractors Expense In The Event That The Contractor Fails To Undertake Works Related To The Failure Removal Within 3 Hours Of Becoming Aware Of The Failure I.8) The Cost Of Securing The Work Site Must Be Included In The Offer Price.9) To Perform The Contract, The Contractor Is Obliged To Use Materials That Guarantee Appropriate Quality, With Technical And Quality Parameters Corresponding To The Properties Of Materials Accepted In The Project And Approved For Use. When Performing Construction Works, The Contractor Will Use Construction Products Placed On The Market In Accordance With The Rules Set Out In The Act Of 16 April 2004 On Construction Products (Journal Of Laws Of 2019, Item 266) And In The Implementing Regulations To This Act.10 ) The Contractor Is Obliged To Present Documents Confirming That The Built-In Materials Comply With The Applicable Standards And Legal Regulations. All Documents For The Performed Subject Of The Order, In Particular: A) Materials Testing Reports, B) Documents Confirming The Quality Of Materials And Equipment Used To Perform The Subject Of The Order, C) Other Documents Collected During The Execution Of The Subject Of The Order And Relating To Its Implementation, In Particular Drawings With Changes Made During The Task, D) As-Built Design, E) Inventory G As-Built Survey, F) Other Documents Necessary To Report The Completion Of The Works. All The Documents Referred To Above (Let. A-E) Are To Be Ordered, 12) During The Implementation Of The Investment, The Contractor Will Provide The Employer And The Supervision Inspector With Access To Construction Materials That Will Be Used To Perform The Subject Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
97e1696b-5930-4b16-980a-6fbbc22ba168.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders