GTR 62211354
Tenders Are Invited For Execution Of Construction Works For The Investment Task Mon. Renovation Of Basements And Locker Rooms In Primary School No. 4 - Building B At Szarych Szeregów Street
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62211354
Tendering Authority
Subscribe to view
Tender No
RZP.271.17.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Construction Works For The Investment Task Mon. Renovation Of Basements And Locker Rooms In Primary School No. 4 - Building B At Szarych Szeregów Street
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
31-03-2023
Closed
Work Detail
1. Execution Of Construction Works For The Investment Task Entitled Renovation Of The Cellars And Locker Rooms In Primary School No. 4 - Building B At Ul. Gray Ranks. The Order Covers The Execution Of Construction Works In Accordance With The Design Documentation Constituting Appendix No. 6 To The Swz And The Bill Of Quantities Constituting Appendix No. 7 To The Swz And The List Of Prices Constituting Appendix No. 8 To The Swz. All Kinds Of Works Inside The School Building Should Be Planned So As To Start On 02.05.2023, Additionally They Must Be Carried Out In Such A Way That They Do Not Hinder The Functioning Of Classes, I.E. From 13:00-22:00. During The Holiday Period, Work Can Be Carried Out From 6:00 - 22:00. Renovation Works Concern The Cloakrooms Located In Building B Of Primary School No. 4 At Ul. Szarych Szeregów, Land Plot No. 679/4, 679/3, 679/1, 1164, Geodetic Precinct No. 2. The Scope Of Adaptation And Renovation Works Includes: - Assembly Of A Stair Platform Between The Area And The Ground Floor For The Disabled - Replacement Of Damaged Floors - Repair Of External And Internal Walls - Repair Of Partition Walls - Separation Of Boxes From Steel Sections For Individual Departments - Finish Of Masonry Walls With Abrasion And Chemical Resistant Vinyl Lining - Assembly Of Doors And Windows - Repair Of Window Sills And Finishing Them With Pvc Cladding - Replacement Of Lighting - Installation Of Sockets - Installation Of Direct-Acting Residual Current Devices - Replacement Of The Rainwater Drainage Connection With New Ones With A Diameter Of Dn 315 - Replacement Of Risers And Levels Of The Rainwater Drainage System Along With Accessories Along Their Existing Course - Complete Replacement Of The Discharge To The Rainwater Connection With The Drainage Of Rainwater From The Entire Area Through A Pumping Station And A Collecting Tank Retention Chamber With A Capacity Of Approx. 200 M3 - Installation Of Mechanical Supply And Exhaust Ventilation - Installation Of Fire Hydrants. Locker Rooms In The Basement Will Be Equipped With Sets Of Lockers, Hangers And Benches For 600 Children. On The Ground Floor, In The Main Hall, Lockers Typical For Children With Mobility Limitations Are Planned. In Order To Increase Fire Safety, Apart From Hydrants, Changing Rooms Will Be Equipped With Powder Extinguishers. All Works Should Be Carried Out On The Basis Of The Attached Design Documentation, In Accordance With The Principles Of Construction Art And All Applicable Standards. The Detailed Scope Of Works For This Task Is Defined By The Bill Of Quantities And Price List As Well As Design Documentation. When Performing The Works, Decisions, Conditions, Arrangements, Opinions To The Developed Design Documentation Should Also Be Taken Into Account. If The Scope Of Works Does Not Directly Follow From The Construction/Executive Design, The Elements Contained In The Bill Of Quantities Should Be Used. The Contractor Is Also Responsible For Obtaining An Occupancy Permit On Behalf Of The Employer Or Making An Effective Notification Of The Completion Of The Works And The Intention To Commence Use, Together With The Preparation Of The As-Built Geodetic Inventory (If Required In Accordance With Applicable Regulations). Note: 1) Where The Subject Of The Order Is Described By Indicating Trademarks, Patents Or Origin, The Ordering Party Allows The Contractor To Use Solutions Equivalent To Those Described In The Documentation, Provided That They Have At Least The Same Or Better Parameters Technical And Functional And Will Not Lower The Standards Specified In The Documentation. 2) If The Contractor Proposes Materials And Other Equivalent Elements, He Is Obliged To Prepare And Attach To The Offer A List Of All Proposed Materials And Other Equivalent Elements And Demonstrate Their Equivalence To Materials And Other Elements Described In The Documentation, Which Is A Description Of The Subject Of The Contract, Stwior With An Indication Of The Name, Page And Item Of The Bill Of Quantities To Which It Applies. 3) All Equivalent Materials Or Other Elements Proposed By The Contractor Must: A) Have Technical And Functional Parameters Not Worse Than Those Specified In The Documents B) Have Appropriate Approvals And Approvals. 4) The Description Of The Proposed Equivalent Solutions Should Be Attached To The Offer And Must Be Detailed Enough For The Ordering Party, When Evaluating The Offer, To Assess The Fulfillment Of The Requirements Regarding Their Technical Parameters And Decide Whether The Proposed Solutions Are Equivalent. This Means That The Contractor Is Obliged To Indicate That The Materials And Other Elements Offered By Him Are Equivalent To Those Described By The Ordering Party.2. Scope Of Works The Basic Scope Also Includes: - Final Acceptance, Charges For Media Consumption, E.G. Water, Electricity During Construction. Fees For The Consumption Of Utilities, In The Case Of Invoices Issued By The Ordering Party, Shall Be Settled Within 14 Days From The Date Of Issuing The Invoice. - Preparation Of As-Built Documentation And As-Built Geodetic Inventory In 2 Copies;3. Requirements Related To The Performance Of The Contract In The Scope Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing The Activities Indicated By The Contracting Authority In The Scope Of Contract Performance, If The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2020, Item 1320, As Amended) Include The Following Types Of Activities: 1) Demolition Works 2) Bricklaying And Masonry Works 3) Plastering 4) Painting Works 5) Special Construction Works Other Than Roofing 6) Covering Floors And Walls 7) Installing Door And Window Frames 8) Installing Non-Metallic Joinery 9) Installing Metal Joinery, Except For Doors And Windows 10) Water And Sewage Installation Works11) Installing Ventilation Systems12) Hydraulic Installation Works 13) Electrical Installation Works14) Construction Works In The Field Of Construction Of Power Lines Detailed Requirements For The Implementation And Enforcement Of The Requirement Of Employment On The Basis Of An Employment Relationship Are Specified In The Contract Template Constituting Appendix No. 5 To The Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
49ab1549-7774-4d4b-b944-f01e9f7388ea.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.