GTR 62205058
Registration Of Interest (Roi) For Detailed Design Engineer: Wi Neera To Onepoto Shared Pathway And Coastal Resilience Project
NCB — National Competitive Bid
Closed
Australia and New Zealand
Tender Information
GTR Reference
62205058
Tendering Authority
Subscribe to view
Tender No
PC00214
Financer Name
Self-Funded
Work Title
Registration Of Interest (Roi) For Detailed Design Engineer: Wi Neera To Onepoto Shared Pathway And Coastal Resilience Project
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Australia and New Zealand
Political Region
Asia Pacific Economic Cooperation APEC,APAC Asia Pacific
Last Date of Bid Submission
06-04-2023
Closed
Work Detail
Registration Of Interest (Roi) For Detailed Design Engineer: Wi Neera To Onepoto Shared Pathway And Coastal Resilience Project. Open Date: Friday, 17 March 2023 10:00 Am (Pacific/Auckland Utc+13:00) Close Date: Thursday, 6 April 2023 12:00 Pm (Pacific/Auckland Utc+12:00) Tender Type: Registration Of Interest (Roi) Tender Coverage: Sole Agency Regions: Wellington Required Pre-Qualifications: None Overview: The Wi Neera To Onepoto Shared Pathway And Coastal Resilience Project (The Project) Includes Construction Of A 1.4Km Shared Cycling And Pedestrian Pathway Along Titahi Bay Road Between Wi Neera Drive And Onepoto, And Erosion Protection Works To Enhance Coastal Resilience Along The Coastal Edge Of Titahi Bay Road. This Is Stage 2 Of The 4-Stage Shared Pathway (Between Porirua Cbd And Titahi Bay). Stage 1 Implementation (Porirua Station To Wi-Neera) Was Completed In 2020. We Are Currently In Pre-Implementation (Heading In To Detailed Design) Of Stage 2 (Wi Neera To Onepoto). The Two Phases Of Stage 2 (This Project) Include: 1) Pre-Implementation: Including The Investigation And Concept Design; Consent-Level Design And Consenting; Detailed Design; And Procurement. 2) Implementation: Including Construction Of Pathway And Coastal Resilience Works. Due To Land Ownership Issues, The Project Has Been Split Into Stage A Coastal Resilience Works And Stage B Shared Pathway. We Need To Procure Engineering Services To Undertake The Detailed Design And Cost Estimation Of Stage A And Stage B Of The Project. This Supplier Will Act As The Lead For The Detailed Design Phase, Which Means They Are Responsible For Any Activity They Are Not Able To Undertake Themselves And Need To Out-Source. It Is Then Anticipated That This Supplier Will Also Deliver The Contract For The Engineer To Contract (This Will Be Included As An Option In The EngineerS Contract) For: Construction Of Stage A; Followed By Construction Of Stage B (As A Further Contract Option). Tender Link : Https://Www.Gets.Govt.Nz/Pcc/Externaltenderdetails.Htm?Id=27088569
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e4712a3d-ea9a-41bb-a7c1-dc8eff09f37a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.