GTR 62144963
Tenders Are Invited For Expansion Of The Sanitary Sewage System At Ul. Zbożowa In Wieliczka Within The Task: Expansion Of The Sanitary Sewage System In The Wieliczka Commune
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62144963
Tendering Authority
Subscribe to view
Tender No
WZP.271.13.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of The Sanitary Sewage System At Ul. Zbożowa In Wieliczka Within The Task: Expansion Of The Sanitary Sewage System In The Wieliczka Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
31-03-2023
Closed
Work Detail
1. The Subject Of The Contract Is The Performance Of Construction Works Consisting In The Extension Of The Sanitary Sewage System Of The Gravitational And Pressure Network Together With The Sewage Pumping Station On Plots No. 1522, 168/2, 167/2, 166/2, 165/2, 164/13, 164 /14 In Wieliczka, Rev. 2, Commune Wieliczka. The Designed Sanitary Sewage Network In Ul. Zbożowa Will Run In The Right-Of-Way In The Street-At Ul. Zbożowa With The Category Of A Municipal Street (Access Road). Inclusion In Ul. Zbożowa In Accordance With The Technical Conditions. The Pumping Station Will Be Located On Plot No. 164/13. The Scope Includes The Construction Of A Sanitary Sewage Network From The S0 Junction To The S11 Sewage Pumping Station And From The S38 And S25 Pumping Stations. There Is A Need To Use A Sewage Pumping Station On The Investment Site Due To The Varying Level Of The Terrain And The Depth Of The Existing Network. A Sanitary Sewage Network Is Designed With A Diameter Of Fi200, Fi160, A Discharge Section Of Fi90. The Sanitary Sewage Network In The Field Should Be Made Of Plastic Pipes, Min. . The Intersections Are At A Standard Distance From Each Other. The Newly Designed S0 Well Along With A Section Of The Designed Network And Sewage Pumping Station Will Be Located In The Right-Of-Way Of Zbożowa Street On A Plot Owned By The Commune - Plot No. 164/13, Rev. 2 Wieliczka. The Pumping Station Will Be Located On Plot 164/13 (In A Generally Accessible Place). Pumping Stations Should Be Electrically Powered. The Manhole Of The Pumping Station Should Be Made As Flood Protection, Exhaust Ventilation With An Anti-Odour Filter. Pumping Station Capacity Qww=12.4 L/S Pump Lifting Height 10.0Mh2o. Concrete Sewage Wells Dn 2000, Dn 1200, Dn 1000, Dn 600 And Plastic Ones Dn 425, Dn 600. The Designed Sanitary Sewage System From The Designed Connection Well S0 Should Be Made Of Pvc Pipes Sn8 Dn 200, Discharge Part 2 X Pe Sd11 90 X 8.2. Installation Of Pipelines Should Be Carried Out In Accordance With Pn-En 1610:2002 Construction And Testing Of Sewage Pipes. Materials Used For The Construction Of The Sanitary Sewage Network Should Have The Required Attestations, Certificates And Certificates Of Admission On The Polish Market. Due To The Fact That The Discharged Domestic Sewage Will Be Of The Nature Of Typical Domestic Sewage, Pre-Treatment Is Not Planned. Particular Attention Should Be Paid To The Tightness Of The Connection, Both To The Exfiltration Of Sewage Into The Ground And The Infiltration Of Groundwater Into The Pipeline. The Space Between The Surface Of The Opening And The Outer Surface Of The Channel Should Be Filled With A Plastic Material. Pipelines And Utilities, After Laying On A Properly Prepared Substrate, Should Be Inventoried And Tested For Tightness And Patency. After Successful Tests As Above, Pipelines And Utilities Should Be Backfilled In Layers In Accordance With The Recommendations Contained In The Construction Design, Conditions And Decisions Of The Owner Of The Sewage Network And The Supervision Inspector. Earthworks And Assembly Works At Each Stage Of Their Execution Are Subject To Supervision And Acceptance By The Supervision Inspector (Submerged Works Are Subject To Protocol Acceptance). The Following Works: - Dismantling The Surface Of Bitumen And Mineral Masses - 90 M2; - Dismantling The Surface Of Cobblestones - 425 M2; - Dismantling Of Concrete Curbs - 180 M; - Dismantling Of The Foundation - 515 M2; - Execution Of The Surface Of Paving Stones - 500 M2; - Execution Of Concrete Curbs - 180 M; External 160 Mm - 32.00 M;- Ducts Made Of Pvc-U Solid Sn8 Pipes Connected By Pressing, Dia. External 200 Mm - 160.23 M; - Ducts Made Of Pvc-U Solid Sn8 Pipes Connected By Pressing, Dia. External 250 Mm - Casing Pipe - 11.00 M; - Installation Of Pipelines Made Of Polyethylene Pe, Hdpe Pipes With An Outer Diameter Of 90 Mm - 166.60 M; - Chambers Made Of Concrete Rings With A Relief Ring - 15 Pcs; - System Sewage Chambers - 3 Pcs.; - Sewage Pumping Station - 1 Pc. 2. Additional Information On The Subject Of The Contract: The Contractor Is Obliged To Prepare Documents And Obtain A Certificate Of No Grounds For Raising Objections, In Accordance With Applicable Regulations. 3. The Detailed Scope Of The Order Is Specified In The Following Studies Included In The Design Documentation And Attached To The Specification: - Technical Documentation - Annex No. 9; - Decision Of The Staroste Of Wieliczka To Transfer The Rights And Obligations Of The Expansion Of The Sanitary Sewage System To The Municipality Of Wieliczka - Annex No. 10; - Technical Specification For Execution And Acceptance Of Construction Works - Appendix No. 11; - Bill Of Quantities - In Appendix No. 12, However, Due To The Flat-Rate Nature Of Remuneration, The Bill Of Quantities Should Be Treated As An Auxiliary Document, And The Lack Of Any Item In The Bill Of Quantities Does Not Release The Contractor From The Obligation To Perform It, If From The Technical Documentation;4. If The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Or Standards, Approvals, Specifications And Systems Referred To In Art. 99 Sec. 5 Of The Public Procurement Law, The Contracting Authority Allows Offering Materials Or Equivalent Solutions, Provided That They Guarantee The Proper Implementation Of The Works And Ensure The Achievement Of Technical Parameters Not Worse Than Those Assumed In The Above-Mentioned Documents. The Contractor Who Refers To Equivalent Solutions Is Obliged To Prove That The Solution He Offers Meets The Requirements Specified By The Contracting Authority. In This Case, The Contractor Shall Attach To The Offer A List Of Equivalent Solutions, Respectively, Along With Its Description Or Standards.6. Additional Information Regarding The Subject Of The Contract.6.1) The Contractor Undertakes To Perform External Works And Tidy Up The Construction Site And Adjacent Areas, If During The Works It Violated These Areas. The Contractor Is Obliged To Prepare Photographic Documentation Before Starting The Task. The Contractor Bears All Costs For Damages Caused To Third Parties During The Execution Of The Task. The Employer Does Not Provide For The Payment Of Compensation To Property Owners For Damage Caused By The Contractor During Construction. The Contractor Is Obliged To Make Arrangements With Property Owners And Road Administrators Regarding Entry With Works, Minimizing Damage And Incurring Related Costs. 6.2) The Contractor Will Perform The Subject Of The Contract From Its Own Materials And Equipment. The Materials And Devices Used Should Comply With Declarations Of Compliance With Polish Standards, Certificates And Technical Approvals. The Contractor Is Obliged To Have Valid Documents Confirming The Permission For Their Use/Incorporation (E.G. Attestations, Certificates, Technical Approvals, Declarations Of Conformity) For The Materials Used. Transport Of Materials To The Construction Site As Well As Delivery And Operation Of Machinery And Equipment Are The Responsibility Of The Contractor. The Contractor Is Obliged To Perform Construction Works In Accordance With The Construction Art, Applicable Regulations And Standards, And In Compliance With Health And Safety And Fire Protection Regulations. And Maximum Reduction Of The Nuisance Of Carrying Out The Works. The Contractor Also Guarantees The Performance Of The Subject Of The Contract Under The Supervision Of Persons With The Required Professional Preparation To Perform Independent Functions In The Construction Industry. Before Commencing The Final Acceptance Of The Works, The Contractor Shall Present To The Ordering Party Reports On The Tests And Tests That Were Necessary For The Proper Execution Of The Order, Certificates Or Attestations For The Materials Used, Documentation Regarding The Completed Construction Works (As-Built Inventory). Prior To Signing The Contract For The Performance Of Construction Works In Accordance With The Guidelines Of The Employer. The Most Advantageous In These Proceedings To Have Paid Civil Liability Insurance In The Scope Of Activities Related To The Subject Of The Contract Throughout The Entire Period Of Contract Performance In The Amount Of At Least Pln 500,000.00.6.7) The Employer Pursuant To Art. 95 Sec. 1 Of The Public Procurement Law Requires The Contractor Or Subcontractor To Employ Persons Performing Activities Related To The Performance Of The Contract On The Basis Of An Employment Relationship, In Accordance With Point 20.2. Swz.7. Attention! The Employer Recommends Carrying Out A Site Visit, However, The Employer Does Not Expect To Reject The Bid Of The Contractor Who Did Not Have A Site Visit As Part Of The Procedure In Question. Due To The Fact That The Future Construction Site Is Generally Accessible And Not Fenced, It Is Possible To Carry Out An Optional Site Inspection On Their Own By The Interested Contractors. All The Necessary Documents Are Posted On The Website Of The Conducted Procedure And Therefore The Ordering Party Does Not Provide For The Possibility Or Does Not Require The Contractor To Check The Documents Necessary For The Execution Of The Contract Available On Site At The Ordering Party.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3758ebf0-c921-4e36-bba1-9400705b0b0d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.