GTR 62144802

Tenders Are Invited For Comprehensive Thermal Modernization And Modernization Of The Building Of The Fire Station Of The Osp Inowłódz (Procedure Ii)

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
62144802
Tendering Authority
Subscribe to view
Tender No
RI.271.6.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Comprehensive Thermal Modernization And Modernization Of The Building Of The Fire Station Of The Osp Inowłódz (Procedure Ii)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
30-03-2023 Closed
Work Detail
1. The Subject Of The Contract Is Construction Works Covering The Scope Of: Extension, Reconstruction, Superstructure And Comprehensive Thermal Modernization, Including The Installation Of Photovoltaic Panels And Heat Pumps Together With The Necessary Infrastructure Of The Building Of The Fire Station Of The Volunteer Fire Service In Inowłodz.2. The Detailed Scope Of Works Includes Mainly: 2.1. Garage Part 2.1.1. Demolition Works: Demolition Of Walls, Ceiling, Roof, Doors, Cladding With Lifting And Disposal Of Debris.2.1.2. Construction Works: Mining Of Foundations, Execution Of Footings, Columns, Reinforced Concrete Beams And Ceilings, Masonry Walls, Lintels, Delivery And Assembly Of Hollow-Core Floor Slabs 2.1.3. Execution Of Floors (Within The Extension Of The Part Of The Building): Concrete Foundations And Floors, Anti-Moisture And Thermal Insulation, Concrete Floors Painted With Resin Paints. Laying Ceramic Tiles On All Surfaces, I.E. In The Existing And Added Parts.2.1.4. Execution Of Internal Partitions: Construction Of Partition Walls, Plastering And Laying Plaster On Walls And Ceilings.2.1.5. Wall Insulation (In The Scope Of Newly Built Walls): Priming, Fixing Thermal Insulation, Plastering With Thin-Layer Plaster On The Mesh, Insulation Of Foundation Walls.2.1.6. Installation Of Woodwork: Insertion Of Gates (Automatic With Remote Control, Including One Pair With Patent Lock Doors), Anti-Burglary External Roller Shutters For Windows To Rooms 18 And 21.2.1.7. Execution Of The Roof Structure And Roof Sheathing: Assembly Of A Wooden Structure Protected With Preparations, Fixing Foil, Covering With Osb Board, Assembly Of Flashings, Soffit, Ventilators, Snow Fences, Roof Drainage, Seaming Sheet Metal, Replacement Of Attic Doors.2.1.8. Finishing Works: Assembly Of Internal Doors With Frames, Suspended Ceilings, Internal Window Sills, Ventilation Ducts, Walls And Doors Made Of Hpl Boards, Priming And Painting Walls And Ceilings, Facing Walls With Ceramic Tiles Up To 2 M High Within The Room Area. 21.2.1.9. Execution Of The Water And Sewage System: Installation Of Pipelines, Pipes, Wells, Approaches, Inlets (Including Linear Drainage Along The Entire Length Of All Parking Spaces - Change In Relation To The Design), Toilet Bowls, Washbasins, A Shower Tray With A Shower Cabin, Batteries, Valves, Cleaners, Water Meters , Delivery And Assembly Of A Washer-Extractor Set (Load Min. 10 Kg), A Dryer And A 4-System Automatic Dispenser For Special Clothes (Along With The Supply Of Electricity Required By The Manufacturer And The Water And Sewage System For The Set), Punching Holes, Cutting Furrows, Metering , Tests And Checks. 2.1.10. Execution Of Electrical Installations: Installation Of Boxes, Switchgears, Connectors, Wires, Pipes, Sockets, External Halogen Lamps Above The Gates, Above The Gate With The Entrance Door For A Motion Detector), External Monitoring Installation With A Preview Of All Doors And Windows, Measurements And Tests. 2.1.11. Execution Of Works Accompanying Comprehensive Thermal Modernization: Other Works Not Provided For In The Documentation And Necessary To Be Performed For The Proper Implementation Of The Investment Task, Including Parking Stoppers Under Car Wheels, Steel Lockers With Seats For 20 People, Replacement Of Metal Roof Tiles With Seam Sheet On The Shed Next To The Historic Fire Engine, Illuminated Letters Osp Inowłódz (As Part Of The Investment, All Elements And Façade Surfaces Should Be Renewed And The Steel Mast Cleaned And Repainted).2.2. Aisle Part 2.2.1. Demolition Works: Demolition Of Walls, Ceiling, Roof, Doors, Cladding With Lifting And Disposal Of Debris.2.2.2. Construction Works: Assembly Of Lintels, Steel Beams, Painting Of Steel Structures, Bricklaying Of Walls, Execution Of Reinforced Concrete Structures, Widening Of Foundations. 2.2.3. Flooring: Laying Ceramic Tiles (All Surfaces).2.2.4. Execution Of Internal Partitions: Execution Of Partition Walls, Plastering And Laying Plaster On Walls And Ceilings, Assembly Of Walls And Doors Made Of Hpl.2.2.5 Boards. Wall Insulation (In The Scope Of Superstructured Walls): Priming, Fixing Thermal Insulation, Plastering With Thin-Layer Plaster On The Mesh, Facing With Stone Cladding In Accordance With The Elevation Drawings In The Design Documentation, Insulation Of Foundation Walls.2.2.6. Execution Of The Roof Structure And Roof Sheathing: Demolition Works, Renovation Works, Assembly Of A Wooden Structure Protected With Preparations, Fixing Foil, Covering With Osb Board, Assembly Of Flashings, Soffits, Ventilators, Snow Fences, Chimney Benches, Roof Drainage, Seam Roofing.2.2. 7. Finishing Works: Installation Of Internal Doors With Frames, Suspended Ceilings, Roof Hatches, Internal Window Sills, External Canopies, Facing Walls With Ceramic Tiles, Ventilation Ducts, Priming And Painting Walls And Ceilings. The Interior Of The Meeting Room Should Be Made As In The Visualization Attached To The Procedure. 2.2.8. Renovation Of Stairs, Making A Band: Excavations, Making A Foundation, Laying Pavers And Concrete Edging. 2.2.9. Delivery And Assembly Of Equipment: Gas Cooker With Hood And Accessories, Assembly Of Pipelines.2.2.10. Execution Of The Domestic Hot Water Installation: Delivery And Installation Of The Battery.2.2.11. Execution Of Water And Sewage Systems: Installation Of Pipelines, Pipes, Wells, Approaches, Inlets, Outflows, Toilet Bowls, Urinals, Washbasins, Shower Trays, Sinks, Batteries, Valves, Cleaners, Water Meters, Punching Holes, Cutting Furrows, Measurement, Testing And Checking. 2.2.12. Execution Of The Hydrant System: Assembly Of Cabinets, Fittings, Pipelines.2.2.13. Execution Of External Sewage System: Installation Of Pipelines.2.2.14. Execution Of Electrical Installations: Delivery And Assembly Of Air Curtains, Boxes, Switchgears, Connectors, Wires, Pipes, Sockets, Outlets, Connectors, Wires, Spiers, Switchgears, Earth Electrodes, Measurements And Tests. 2.2.15. Execution Of Works Accompanying Comprehensive Thermal Modernization: Other Works Not Provided For In The Documentation And Necessary To Be Performed For The Proper Implementation Of The Investment Task (As Part Of The Investment, All Elements, Façade Surfaces Should Be Renewed).2.3. Tower Part 2.3.1. Demolition Works: Floor Layers, Roof Elements And Sheathing With Removal And Disposal Of Debris.2.3.2. Execution Of Floors: Foundations And Concrete Floors, Anti-Moisture And Thermal Insulation, Laying Ceramic Tiles2.3.3. Wall Insulation: Insulation Of Foundation Walls.2.3.4. Insulation Of The Ceiling Over The Basement: Priming, Fixing The Thermal Insulation, Plastering With Glue On The Mesh Secured With Painting.2.3.5. Roof Insulation: Dry Laying Of Mineral Wool Insulation And Anti-Moisture Insulation.2.3.6. Execution Of The Roof Structure And Roof Sheathing: Demolition Works, Renovation Works, Assembly Of A Wooden Structure Protected With Preparations, Fixing Foil, Covering With Osb Board, Assembly Of Flashings, Soffits, Ventilators, Roof Drainage, Seaming With Sheet Metal.2.3.7. Execution Of The Central Heating System: Delivery And Assembly Of The Heat Pump, Radiators, Pipelines, Pipes, Valves, Manifolds, Tests And Checks.2.3.8. Delivery And Assembly Of A Complete Photovoltaic Installation 2.3.9. Execution Of Works Accompanying Comprehensive Thermal Modernization: Other Works Not Provided For In The Documentation And Necessary To Be Performed For The Proper Implementation Of The Investment Task (As Part Of The Investment, All Elements, Façade Surfaces Should Be Renewed).2.4. Land Use 2.4.1. Hardening: Demolition Of The Existing Pavements Made Of Asphalt Concrete And Concrete Cubes, Laying New Pavements Of The Staristra Paving Stones On The Foundation With Planting Of Curbs And Edges.2.4.2. Establishment Of Lawns: Cleaning The Area, Spreading Fertile Soil And Sowing Seeds With Grass. Note: A Detailed Description And Scope Of The Subject Of The Order Includes: Design Documentation, Bill Of Quantities, Stwiorb, Decision On The Building Permit Constituting Attachments To This Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
880d997d-4b4e-43dc-ad49-22df0b772ad7.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders