GTR 62081592
Tenders Are Invited For Construction Of The Municipal Roads Of Pilecki Street And Fieldorf Nila Street In Ełk
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62081592
Tendering Authority
Subscribe to view
Tender No
O-ZP.271.12.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of The Municipal Roads Of Pilecki Street And Fieldorf Nila Street In Ełk
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-04-2023
Closed
Work Detail
1. Subject Of The Contract The Subject Of The Contract Is The Construction Of Ul. Pk Witolda Pileckiego And Ul. Fieldorfa Nila In Ełk. As Part Of The Construction Of The Streets, New Surfaces Of Bitumen Roadways, Sidewalks, Entrances And Parking Spaces Are To Be Made Of Concrete Paving Stones, Thickness. 8 Cm And A Bicycle Path With A Red Bituminous Surface. The Total Length Of The Streets To Be Built Is Approx. 723 M, Including Pileckiego Street Approx. 331.5 M And Nila Street Approx. 391.5 M. As Part Of The Task, A Rainwater Drainage System, Street Lighting In Led Technology, Teletechnical Sewage System And Reconstruction Of Devices Colliding With The Investment (Pge Collisions) Are To Be Built. Vertical And Horizontal Markings Should Be Made On The Constructed Structure. The Detailed Method Of Land Development Is Included In The Building Design - Land Development Design And Architectural And Construction Designs.1.1. The Scope Of The Contract Includes: 1.1.1. Development And Approval Of A Temporary Traffic Organization Project For The Construction Period. Execution And Maintenance Of Access And Detour Roads For The Duration Of The Construction And After Completion Of All Works, Restoring The Adjacent Area To Its Original Condition.1.1.2. Execution Of Construction Works On The Basis Of The Attached Design Documentation, Including: A) Road Works At Pileckiego And Fieldorfa Nila Streets: - Demolition Works Including The Removal Of Demolition Materials, - Earthworks, - Construction Of Bitumen Road Surfaces,]- Construction Of The Intersection Of Pileckiego And Fieldorfa Nila Streets Of The Small Roundabout Type, - Construction Of The Surface Of Exits Made Of Concrete Paving Stones, - Construction Of Parking Spaces Made Of Concrete Paving Stones, - Construction Of Pavements Made Of Concrete Paving Stones, - Construction Of A Bicycle Path With A Bituminous Surface - Setting Of Concrete Curbs And Stone On A Concrete Footing With Resistance, - Setting Concrete Edges On A Concrete Footing With Resistance, - Laying Lawns, - Making Horizontal And Vertical Markings, - Finishing And Cleaning Works, Note: - Due To The Change In The Scope Of Reconstruction Of The Collision With The Power Grid, All Collisions Of The Relocation Of Power Grids Shown In The Construction Design Nym - The Development Project Should Be Treated As Outdated. The Scope Of The Reconstruction Of Power Grid Collisions Is Presented In The Replacement Project In The File 6_Pab_Branza_Elektryczna_Przebudowa_Overhead_Lines. - Pileckiego Street Was Built In The Earlier Period On The Section From Km 0+000 To Km 0+050 In Terms Of Bitumen Road, Exits, Sidewalk (Located On The Right Side Of This Section ), Street Lighting (3 Lanterns), Other Works To Be Performed In Accordance With The Design Documentation. - At The Junction Of The Planned Exit With The Designed Sidewalk Of The Bicycle Path, No Side Resistance Should Be Made On The Exit, - A Layer Of Aggregate Stabilized With Cement Under The Roadway, Roundabout Ring, Parking Bays And Exits Should Be Made As Class Rm = 2.5 Mpa From The Mix From The Delivery, Produced In Stationary Mixers, - Road Markings Should Be Made As Thin-Layer, Warranty Period For Road Markings Is 12 Months, - The Paving Stone On The Roundabout Ring Should Be Made Of Rough Irregular Stone - Split 15/17 Cm With Filling The Joints With Mineral Resin Intended For Heavy Loads.-. The Bicycle Path Should Be Made In The Following System: Wearing Course Of Ba Ac11s 50/70 Kr1 Gr. 4 Cm - Red, Binding Layer With Ba Ac16w 50/70 Kr1 Gr. 5 Cm, Foundation Made Of Crushed Aggregate Stabilized With Moss. Gr. 15 Cm. B) Electrical And Teletechnical Works: - Construction Of A Cable (Lighting) Line - Yaky 4X35mm2 + Yaky 4X16mm2, - Assembly Of Anodized Aluminum Lighting Poles, 10 M High, With A Boom With A Reach Of 1.5 M, The Pole Pattern Should Be Adapted To The Already Existing Street Lamps In Ul. . Pileckiego, - Assembly Of The Led Lighting Fixture, - Assembly On The Pole Of A Set Of 230V Power Socket With A Long Cable. 6 M For Christmas Decorations, - Assembly Of A Lighting Cabinet, - Configuration And Commissioning Of A Street Lighting Control And Monitoring System, - Removal Of Power Collisions Between Mv And Lv Overhead Lines, Including Reconstruction Of The Overhead Transformer Station (Change Of Station Location), - Construction Of A 2-Hole 2X110 Teletechnical Cable Duct /6,3- Construction Of A Cable Chamber, Type Skr-1, - Construction Of A Cable Chamber, Type Sk-1.C) Sanitary Works: Detailed Description Of The Subject Of The Contract Is Included In The Detailed Design And Sst. In The Area Of Pileckiego Street And Fieldorfa Nila Street In Ełk, In Accordance With The Design Documentation Entitled The Construction Of Ul. Witold Pilecki And Roads 3Kz And 5Kdl In Ełk Along With Infrastructure - Sanitary Industry”: - Rain Sewerage Network - Assembly Of New Channels And Wells With Connection To The Existing Network, Along With Replacement / Regulation Of Existing Well Tops. Disassembly Of Existing Sewers And Inlets. All Manholes In Roadways And Green Areas - Ventilated. In Terms Of Sidewalks And Paths, Non-Ventilated Manholes. Note! Part Of The Network Has Already Been Constructed On The Di1-D02 Section, Along With The Lateral Drain And The W1 Inlet - Excluded From Implementation (According To The Graphic Attachment). The Ks Network Is Currently Under Construction By The User Pwik Ełk And The Progress Of Its Implementation Is As Follows: - Section S08-Si1 With Connections Has Already Been Completed; - Sections Of The Network S9-S11, S08-S14, S13-S28 - To Be Completed By The User In During The Contract; - Sections S15-S19 And S15-S24 Together With The Sewage Pumping Station - Are Not Planned For Implementation. - Water Supply Network With Connections - Excluded From The Scope Of Works For The Contractor (In Accordance With The Graphic Attachment). Note: The Water Supply Network Is Currently Under Construction By The User Pwik Ełk And Its Implementation Is As Follows: - Section W03-W05-W07 With Connections And Hydrants Has Already Been Completed; - Sections Of The Network W05-Hp05, W04-Hp04 - To Be Performed By User During The Contract.2. Warranty - Minimum Required Warranty Period 36 Full Months From The Date Of Final Acceptance Note: Due To The Limited Number Of Characters In The Field, More Information In The Specification Of The Terms Of The Order.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
40903420-e1b6-4444-a159-8ba6a1b6fe1a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.