GTR 62081435
Tenders Are Invited For Expansion Of Ul. Roosevelt Together With The Necessary Technical Infrastructure In Piotrków Trybunalski.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62081435
Tendering Authority
Subscribe to view
Tender No
SPZ.271.12.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of Ul. Roosevelt Together With The Necessary Technical Infrastructure In Piotrków Trybunalski.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
05-04-2023
Closed
Work Detail
1. Subject Of The Contract: Performance Of Construction Works In The Scope Of Extension Of Ul. Roosevelta Along With The Necessary Technical Infrastructure On The Section From The Roundabout Of The Cursed Soldiers 1944-1956 To Ul. Towarowa And On The Section From Ul. Graniczna To Ul. Wronia In Piotrków Trybunalski. The Task Includes, Among Others: Road Expansion With Reconstruction And Extension Of Intersections, Reconstruction And Construction Of Driveways To Properties, Construction And Reconstruction Of Sidewalks, Bicycle Paths, Pedestrian And Bicycle Paths And Dirt Shoulders, Construction And Reconstruction Of Bays And Bus Platforms, Construction And Reconstruction Of Sewage Systems Drainage System And A Roadside Ditch, Construction Of Lighting, Construction Of A Service Channel, Reconstruction Of The Water Supply Network With Connections, Reconstruction Of The Sanitary Sewage Network With Connections, Liquidation Of Collisions With Underground And Above-Ground Infrastructure, Landscaping, Installation Of Road Safety Devices. The Scope Of The Contract Also Includes The Preparation Of The Necessary Technical Documentation For The Section Of Ul. Roosevelta From The Roundabout Of The Cursed Soldiers 1944-1956 To Ul. Towarowa. The Scope Of The Contract Includes: 1) For The Section Of Ul. Roosevelta From The Roundabout Of The Cursed Soldiers 1944-1956 To Ul. Towarowa: - Development Of Construction, Executive And Technical Designs, On The Basis Of The Attached Functional And Utility Program, Obtaining All The Arrangements, Permits And Permits Required By Law, And Then Performing Construction Works On This Basis, - Replacement Of The Road Surface Structure; - Construction Of Sidewalks For Pedestrians; - Construction Of Pedestrian And Bicycle Paths; - Reconstruction And Expansion Of Intersections With Lower Class Roads; - Reconstruction Of The Car Park Along Roosevelta Street By The Hospital; - Reconstruction Of The Car Park Along Roosevelta Street Between Adama Próchnika And Czarna Streets; - Construction And Reconstruction Of Exits - Construction And Reconstruction Of Individual Exits; - Construction And Reconstruction Of Bus Bays Along Roosevelta Street With Platforms; - Construction Of Platforms At Bus Stops Located By The Roadway; - Construction And Reconstruction Of Rainwater Drainage System; Network For The Duration Of The Works; - Construction Of Lighting Or Pedestrian Crossings; - Construction Of Street Lighting; - Construction Of A Service Channel; - Construction And Reconstruction Of The Sanitary Sewage Network With Connections In The Right-Of-Way; - Construction And Reconstruction Of The Water Supply Network With Connections In The Right-Of-Way - Cutting Down Trees To The Extent Necessary; - Establishing An Area Green Areas - Compensatory Plantings, Lawns, Shrubs, Etc.; - Assembly Of Small Architecture Elements, - Tidying Up The Area, - Execution Of Vertical And Horizontal Markings, - Carrying Out The Necessary Tests, Measurements, Tests And Camera Inspections. 2) For The Section Of Ul. Roosevelt From Ul. Wronia To Graniczna Street: - Replacement Of The Road Surface Structure; - Construction Of Footpaths For Pedestrians; - Construction Of Pedestrian And Bicycle Routes; - Reconstruction Of Intersections With Lower Class Roads; - Reconstruction And Construction Of Public Exits; - Construction And Reconstruction Of Individual Exits; - Construction Of Bus Bays Along Roosevelt Street With Platforms; - Construction Of Platforms At Bus Stops Located By The Roadway; - Reconstruction Of The Existing Bus Terminus At The Intersection Of Roosevelta And Graniczna Streets; - Construction Of A Rainwater Drainage System; - Elimination Of Collisions With Underground And Above-Ground Infrastructure And Securing The Network For The Duration Of The Works; - Construction Of Light Wells For Pedestrian Crossings; - Construction And Reconstruction Of The Water Supply Network With Connections In The Right-Of-Way, - Reconstruction And Protection Of The Electricity Network Colliding With The Investment - Street Lighting; - Felling Of Trees (Self-Sown Seedlings) To The Extent Necessary; - Setting Up Green Areas - Lawns; - Assembly Of Small Architecture Elements; - Tidying Up The Area; - Execution Of Vertical And Horizontal Markings; - Carrying Out The Necessary Tests, Measurements, Tests And Camera Inspections. Requirements: The Works Should Be Carried Out In A Way That Ensures Continuous Traffic. The Contractor Is Obliged To Provide Full Surveying Services, Including The As-Built Inventory. The Contractor Is Obliged To Carry Out The Necessary Tests And Tests Resulting From The Provisions And Construction Law. Supply Route Of The Investment Before The Commencement Of Works. Photographic Or Video Documentation Is Required. The Contractor Is Obliged To Keep A Book Of Measurements. The Contractor Will Be Liable For Any Damage Caused By His Actions, In Particular Damage To The Above-Ground Installations And Underground Devices Indicated In The Documents Provided To Him By The Ordering Party. 7 Days Before Notifying The Completion Of The Investment, It Will Provide At Least 1 Copy Of The As-Built Documentation For Each Industry And An As-Built Geodetic Map For Checking And Approval By Supervision Inspectors. The Commencement Of Works Should Be Reported To The Appropriate Units - Network Administrators, In Order To Inform About The Above-Mentioned Works And Their Duration. The Contractor Is Obliged To Inform The Residents And Real Estate Users Of The Streets Covered By Construction Works About The Commencement And Planned Completion Of The Works. Equivalent Solutions: Pursuant To Art. 101 Sec. 4 Of The Public Procurement Law, If The Design Documentation Or Stwior Contains A Reference To The Standards, Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Sec. 1 Point 2 And Sec. 3 Of The Public Procurement Law And Such References Were Not Accompanied By The Phrase Or Equivalent, The Employer Allows Solutions Equivalent To Those Described In Each Standard, Technical Assessment, Approval, Technical Specification, Technical Reference System.3. The Employer Requires That The Total Share Of Electric Vehicles Or Vehicles Powered By Natural Gas In The Fleet Of Motor Vehicles Within The Meaning Of Art. 2 Point 33 Of The Act Of 20 June 1997 - Road Traffic Law Used In The Performance Of This Task Was At Least 10%, In Accordance With Art. 68 Sec. 3 In Connection Article 35 Sec. 2 Point 2 Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels.4. The Employer Reserves The Obligation For The Contractor To Personally Perform Key Tasks: Road Works (Bituminous Surfaces, Paving Works).5. The Subject Of The Contract Is Described In Detail In Swz Part Ii.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c99a326c-8a98-41e4-8b86-d111b759d1ae.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.