GTR 62016425
Tenders Are Invited For Revitalization Of The Village Of Iwanowice Through The Renovation Of The Village Hall With A Residential Part
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62016425
Tendering Authority
Subscribe to view
Tender No
IOS.271.2.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Revitalization Of The Village Of Iwanowice Through The Renovation Of The Village Hall With A Residential Part
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-04-2023
Closed
Work Detail
The Subject Of The Contract Is Revitalization Of The Village Of Iwanowice Through The Renovation Of The Village Hall With A Residential Part. Detailed Description Of The Subject Of The Contract: Task Co-Financed From The Polish Government Fund Program Governance: Program Of Strategic Investments. The Subject Of The Contract Is Revitalization Of The Village Of Iwanowice Through The Renovation Of The Village Hall With A Residential Part, Including: A) Construction Industry Works: - Demolition Works, - Raw Construction Works, - Roof Truss, - Finishing Works, - Door Joinery, - Window Joinery, - Facade Works, B) Sanitary Works: - Preparatory Works - Disassembly And Demolition, - Construction Works, - Water And Sewage Installation, - Heating Installation, C) Electrical Works. A Detailed Description Of The Subject Of The Contract Is Included In The Design Documentation , Technical Specifications For The Execution And Acceptance Of Construction Works And In Bills Of Quantities. Note: Bills Of Quantities Attached To Swz Are Auxiliary. Due To The Lump-Sum Nature Of The Contractual Remuneration, The Offer Price Should Include The Actual Costs Of The Task Implementation Resulting From The Design Documentation, Stwiorb And The Provisions Of The Swz. As Part Of The Subject Of The Contract, The Contractor Is Obliged To Provide Geodetic Services, Perform All Tests And Tests, Checks, Restore The Area To Its Previous Condition, Notify The Competent Authority About The Commencement Of Construction Works, Obtain A Permit To Use The Facility. The Contractor Must Carry Out A Geodetic And As-Built Inventory At Its Own Expense And As-Built Documentation. If The Drawings, Stwiorb And Bills Of Quantities Indicate The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Or Standards, Approvals, Specifications And Systems Referred To In Art. 101 Of The Public Procurement Law, The Employer Allows Solutions Equivalent To Those Described, And In Such A Reference They Are Accompanied By The Words Or Equivalent. The Technical And Qualitative Features Of The Subject Of The Contract Should Comply With Polish Standards Transposing European Standards Or Standards Of Other Member States Of The European Economic Area. The Contractor Who Refers To Solutions Equivalent To Those Described By The Employer Is Obliged To Demonstrate (Prove) In The Offer That The Construction Works Or Equipment Offered By Him Meet The Requirements Specified By The Employer. In The Case Of Using Equivalent Materials, The Employer Requires The Contractor To Submit A List Of Materials Together With The Offer Spare Parts For The Technical Documentation (Own Elaboration Containing At Least: The Manufacturers Catalogue, Manufacturers Name, Description Of Materials) - Failure To Submit Such A List Means That The Contractor Will Use The Materials And Solutions Adopted In The Technical Documentation. Months - A Maximum Of 60 Months From The Date Of Acceptance Of Construction Works By The Employer And Signing (Without Comments) Of The Final Report. Warranty Period 60 Months. The Employer Does Not Allow The Submission Of Equivalent Offers. The Employer Does Not Divide The Contract Into Parts And Thus Does Not Allow Partial Bids. Tenders Not Containing The Full Scope Of The Subject Of The Contract Will Be Rejected. Reasons For Not Dividing The Contract Into Lots: The Contracting Authority Did Not Divide The Contract Into Parts Due To Excessive Technical Difficulties Related To The Coordination Of Activities Of Various Contractors Performing Individual Parts Of The Contract, Which Could Seriously Jeopardize The Proper Performance Of The Contract, As Also Result In Serious Difficulties In Enforcing The Ordering Partys Rights Related To The Guarantee And Warranty Granted By The Contractors For Individual Parts Of The Order. Information Regarding The Variant Offer Referred To In Art. 92 Of The Public Procurement Law. 95 Sec. 1 Of The Public Procurement Law Act, Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Activities In The Field Of Contract Performance, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2022, Item 1510, As Amended) The Contractor Or Subcontractor Of Persons Performing Activities During The Execution Of The Contract Is The Performance Of Construction Works, Including: Demolition Works, Shell Works, Replacement Of Joinery, Installation Works Of The Sanitary And Electrical Industries, Finishing Works. The Employment Requirement Referred To Above Does Not Apply To Persons Performing Independent Technical Functions In The Construction Industry Or Persons Holding Qualifications Issued On The Basis Of Other Regulations That Authorize Them To Perform Work Independently Without Supervision, Including Construction Manager, Works Managers, Surveyor.2) Method Of Employment Verification Of These Persons: The Contractor Or Subcontractor Is Obliged To Document, At Each Request Of The Employer, No Later Than Within 5 Calendar Days From The Date Of Receipt Of Such A Request, The Fulfillment Of The Fact Of Employing People, By Submitting To The Employer A Statement That All Persons Performing The Activities Indicated In Section 1 Were Employed During The Performance Of The Contract By The Contractor Or Subcontractor, As At The Specified Date, On The Basis Of An Employment Contract. The Statement Should Include In Particular: Information, Including Personal Data, Necessary To Verify Employment Under An Employment Contract, In Particular The Name And Surname Of The Employed Employee, The Date Of Concluding The Employment Contract, The Type Of Employment Contract And The Scope Of The Employees Duties. 3) The Powers Of The Ordering Party To Control The Contractors Compliance With The Requirements Referred To In Art. 95 Sec. 1 Of The Public Procurement Law And Sanctions For Failure To Meet These Requirements: A) Failure By The Contractor Or Subcontractor To Submit The Declaration Referred To In Sec. 2, Will Be Treated As Failure To Fulfill The Obligation To Employ Employees Under The Employment Contract And Will Result In Charging A Contractual Penalty In The Amount Specified In The Draft Provisions Of The Contract. 2 The Ordering Party Reserves The Right To Notify Relevant Services. Article 22 § 1 Of The Act Of June 26, 1974 - Labor Code (I.E. Journal Of Laws Of 2022, Item 1510, As Amended) States: By Entering Into An Employment Relationship, The Employee Undertakes To Perform Work Of A Specific Type For Of The Employer And Under His Supervision, And At The Place And Time Designated By The Employer, And The Employer - To Employ An Employee For Remuneration. Place Of Implementation: Iwanowice Ul. Zamkowa 2, Plot No. 89/1 And 89/2 (Precinct Iwanowice).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c8b4ddf4-7e39-4ca0-b4bb-be900788ac78.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.