GTR 62016118
Tenders Are Invited For Reconstruction Of The District Hospital In Lesko With The Replacement Of The Roof Structure
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
62016118
Tendering Authority
Subscribe to view
Tender No
IN.272.1.2.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The District Hospital In Lesko With The Replacement Of The Roof Structure
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-03-2023
Closed
Work Detail
The Subject Of The Order Are Construction Works As Part Of The Investment Reconstruction Of The Poviat Hospital In Lesko With Replacement Of The Roof Structure In The Design-Build Formula. The Subject Of The Order Includes: ) Containing: A) A Construction Design For All Required Industries Along With All Accompanying Studies Developed In Accordance With The Construction Law Act, Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of A Construction Design (Journal Of Laws Of 2022, Item 1679) And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2021, Item 2454) - In Paper Form (5 Copies) And In Electronic Form On Cd/Dvd (2 Copies) Larze); B) Technical Design For The Entire Scope Of The Contract Along With All Accompanying Studies Developed In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And - Utility (Journal Laws Of 2021, Item 2454) - In Paper Form (5 Copies) And In Electronic Form On A Cd/Dvd (2 Copies); C) Executive Designs For The Entire Scope Of The Contract Along With All Accompanying Studies Developed In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2021, Item 2454) - In Paper Form (5 Copies) And In Electronic Form On A Cd Cd/Dvd (2 Copies);D) Investors Cost Estimate Prepared In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Grounds For Preparing An Investors Cost Estimate, Calculating The Planned Costs Of Design Works And Planned Costs Of Construction Works Specified In The Program Functional And Utility - In Paper Form (2 Copies) And In Electronic Form N On A Cd/Dvd (2 Copies);E) Technical Specification For The Execution And Acceptance Of Works In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2020 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program - In Paper Form (2 Copies) And In Electronic Form On A Cd/Dvd (2 Copies). 2) Obtaining All Legally Required Decisions, Opinions, Arrangements And Verifications Of The Design Documentation For The Planned Project, Including The Preparation Of All Studies Necessary For The Implementation Of The Investment, In Accordance With The Functional And Utility Program, 3) Obtaining A Building Permit Or Notification Of The Intention To Perform Construction Works ( In Accordance With The Premises Resulting From The Construction Law) And Other Necessary Administrative Decisions, 4) Execution Of Construction Works On The Basis Of The Design Documentation Developed In Accordance With The Fup Constituting Appendix No. 1 To The Swz. The Scope Of Construction Works Includes In Particular: A) Preparing The Facility For The Investment, Including: Providing All Utilities Necessary For The Duration Of The Investment, Carrying Out All Necessary, Previously Designed Demolition Works. - Strengthening (Possibly Replacing Elements) Of The Roof Truss Along With The Replacement Of The Covering And Elongation Of The Eaves Over Pavilion A And B And The Connector, - New Thermal Insulation Of External Ceilings Over Pavilion A And B And The Connector, - Replacement Of Window And Door Woodwork In Pavilion A And Connector, − Thermal Insulation Of External Walls And Façade Plaster According To The Adopted Technology Ensuring Compliance With Applicable Standards Of Thermal Permeability Of External Partitions In Pavilion A, − Anti-Moisture And Thermal Insulation Of Foundations In Pavilion A And B And Connector, − Separation Of Class 4 Stairwells As Separate Fire Protection Zones Along With The Execution Of The Smoke Extraction System In Pavilions A And B, − Replacement And Execution Of A Hydrant System With Semi-Rigid Hoses In Pavilions A And B, − Execution Of A New Emergency Lighting And Fire Alarm System In Pavilions A And B, − Replacement Of 2 Hospital Lifts In The Pavilion A, − Execution Of A 20Kw Photovoltaic Installation On The Roof Of Pavilion B, − Replacement Of The Hot Water Installation With Execution Of A Water Circulation System In Pavilion B, − Adaptation Of The Room In Pavilion B For The Purpose Of A Server Room With Equipment, − Reconstruction Of The Surgical And Internal Departments In The Pavilion B And Gynecology And Obstetrics In Pavilion A Consisting Of: ✓ Reconstruction And Adaptation Of Bathrooms For The Needs Of The Disabled, ✓ Replacement Of Lighting And Electrical Installation, ✓ Replacement Of Floors And Floor Coverings, ✓ Replacement Of The Emergency Call System, ✓ Reconstruction Of The Medical Gas Installation, ✓ Replacement Of Internal Woodwork Door,✓ Construction Of The Installation Installation Of Mechanical Ventilation And Air-Conditioning, ✓ Replacement Of The Central Heating System, ✓ Reconstruction And Renovation Of The Ward Rooms, ✓ Rtv Installation, ✓ Lan And Wlan Computer Network In The Reconstructed Wards. 5) Preparation And Delivery Of As-Built Documentation To The Employer, With An Evacuation Plan,7) Carrying Out Geodetic Services (If Applicable),8) Performing Authors Supervision In All Industries;9) Obtaining, On Behalf Of The Ordering Party, A Non-Final Occupancy Permit Or A Certificate Of No Grounds For Raising Objections To The Notification Of The Construction Supervision Authority About The Completion Of Construction, 10) The Electronic Version Of The Design Documentation Should Be Developed In An Editable And Non-Editable Version Using The Following Electronic Formats: - Drawings, Diagrams, Diagrams - Editable Version (In Svg Or Tif Format), Non-Editable Version (In Jpg Or Png Format), - Descriptions, Set Cost Estimates, Specifications - Editable Version (In Doc Or Docx Or Odt Format), Non-Editable Version (In Pdf Format).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1dcad5e4-2b8e-4cba-8a64-4f7b7b114f6e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.