GTR 61895176
Tenders Are Invited For Improving Safety On Public Roads In The City Of Sierpc - Energy-Saving Solutions And Smartcities
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
61895176
Tendering Authority
Subscribe to view
Tender No
WIR.271.6.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improving Safety On Public Roads In The City Of Sierpc - Energy-Saving Solutions And Smartcities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-03-2023
Closed
Work Detail
1. The Subject Of The Agreement Is The Implementation Of The Investment Task Entitled Improving Safety On Public Roads In The City Of Sierpc - Energy-Saving Solutions And Smartcities In The Design And Build System And Works Related To The Construction Works Performed, In Accordance With The Accepted Offer And Swz.2. The Subject Of The Agreement Referred To In Sec. 1 Includes In Particular: 1) Stage I: Development And Submission Of Project Documentation Along With Obtaining All Opinions, Arrangements, Permits And Decisions Necessary For The Implementation Of The Investment Task, Including In Particular A Final Decision On The Building Permit, Notification Of Works, Development Of A Permanent Organization Traffic And For The Duration Of The Works With Approval, Based On The Functional And Utility Programs Constituting Attachments To The Swz. 2) Stage Ii: Execution Of Construction Works In The Scope Specified In The Developed Design Documentation And In The Functional And Utility Programs Constituting Attachments To The Swz Mean The Full Scope Of Construction Works, Demolition Works, Assembly Works, Construction Services And Supplies Of Machinery And Equipment, Which The Contractor Undertakes To Perform And Hand Over To The Employer, In Accordance With The Design Documentation, This Agreement, In Accordance With The Requirements Of The Construction Law And In Accordance With Other Applicable Regulations And Standards, As Well As Not With The Rules Of Technical Knowledge.3. In Accordance With The Application For Co-Financing From The Polish Government Fund: Strategic Investments Program Submitted In February 2022, The Employer, As Part Of The Implementation Of Stages I And Ii Of The Subject Of The Contract, Expects: 1) Reconstruction Of The Existing Intersections And Road Lanes In Order To Improve The Safety Of Road Users; 2) The Use Of Innovative And Modern Communication Solutions By Introducing New Elements Of Traffic Control Infrastructure (Including Traffic Lights, Timers, Illumination Of Pedestrian Crossings, Intelligent Road Signs And Devices To Improve Road Safety);3) Reconstruction And Extension Of Technical Infrastructure In Road Lanes And Spaces (Green Areas) Along With The Reconstruction Of The Road Surface; 4) Planting, Cutting And Correcting Greenery Within The Existing Areas In The Right-Of-Way; 5) If Necessary, Wiring The Existing Overhead Technical Infrastructure Elements And Placing Them In Existing Road Lanes, Removal Of Collisions, Road Drainage - Rainwater Drainage System, Street Lighting, Bicycle Paths, Pedestrian And Pedestrian And Bicycle Routes, Location And Installation Of Small Architecture Elements In The Road Lanes.4. The Implementation Of Stage I And Ii Of The Subject Of The Contract Will Concern The Streets Listed Below: 1) Jaśminowa Street (From Powstańców Street To Akacjowa Street): Thickness 8 Cm On The Foundation Of Kłsm Th. 20 Cm And A Cut-Off Layer Of Sand, Thickness 15 Cm - 1300 M2; • Concrete Retaining Wall 12X25 Cm - 370 M; • Rainwater Drainage System Made Of Pvc Pipes Dn 315 - 161 M; Rainwater Dn500 - 4 Pcs. • Demolition Of The Sidewalk Made Of Concrete Cubes. – 270 M2; • Demolition Of The Concrete Curb. – 130 M; • Demolition Of The Bituminous Surface – 730 M2; 2) Spacerowa Street (From Ul. Spokojna To Ul. Kalinowa): • Roadway - Wearing Course Made Of Ac 11S, Thickness 5 Cm. – 1425 M2; • Widening Of The Road Structure (Subbase Made Of Kłsm 20 Cm Thick, Cut-Off Layer Made Of Sand 15 Cm Thick, Excavation Of The Channel Depth 40 Cm - 265 Mx1.0 M+100 M2=360 M2; • Leveling The Subbase Of Kłsm Thick 8 Cm - 1155 M2; • Concrete Retaining Wall 12X25 Cm - 530 M; • Ground Shoulder With Kłsm, Thickness 10 Cm - 2X265 Mx0.75 M = 397.5 M2;3) Spacerowa Street (From Kalinowa Street To Ziemiańska Street Road Surface - Wearing Course Made Of Ac 11S, Thickness 5 Cm. - 590 M2; =236 M2; • Leveling Of The Kłsm Foundation, 8 Cm Thick - 424 M2; • Concrete Retaining Wall 12X25 Cm - 247 M; • Ground Shoulder With Kłsm, 10 Cm Thick - 2X118 Mx0.75 M = 177 M2;4) Ziemiańska Street (From Wiklinowa St. To Batalionów Chłopskich St.): • Roadway - Wearing Course Made Of Ac 11S, Thickness 5 Cm - 1340 M2; 40 Cm - 254 Mx1 M=254 M2; • Leveling The Kłsm Subbase, Thickness. 8 Cm - 1086 M2; • Concrete Retaining Wall 12X25 Cm - 520 M; • Ground Shoulder With Kłsm Thickness. 10 Cm - (254+28) Mx0.75 M=211.5 M2; 5) Ziemiańska Street (From Batalionów Chłopskich Street To Powstańców Street): • Roadway - Wearing Course Made Of Ac 11S Gr. 5 Cm - 230 M2; • Leveling The Foundation Kłsm, Thickness. 8 Cm - 230 M2; • Concrete Retaining Wall 12X25 Cm - 210 M; • Ground Shoulder With Kłsm Thickness. 10 Cm - 230 Mx0.75 M=172.5 M2;6) Ul. Tułodzieckich Brothers From Ul. Świętokrzyska (District Road) To Ul. Płocka (Dw 560): • Demolition With Disposal Of 1 Set (Concrete Materials From Demolition - To Be Handed Over To The Investor); • Roadway - 3730 M2; • Exits, Bays - 650 M2; • Sidewalk - 2830 M2; • Pavement Made Of Concrete Cubes (Intersection ) - 450.0 M2; • Curb - 1400 Running Meters; • Edge - 550 Running Meters; • Heating Network - 1 Set; • Rainwater Drainage System - 1 Set; 7) Ul. Gen. S. Grota Roweckiego - The Contracting Authority Has Documentation And Has Submitted A Notification Of Works: • Demolition Of The Existing Roadway Structure Made Of Asphalt Concrete On An Aggregate Foundation; • Demolition Of The Existing Parking Bay And Pavement Made Of Concrete Cubes Located In The Area Of Ul. Piastowska; • Trenching Under The Structural Layers Of The New Road Surface Structure; • Execution Of A Gutter Near The Curb From 3 Rows Of Concrete Cubes; • Execution Of Layers Of The Surface Structure Along The Entire Width Of The Roadway Between The Curbs: - Wearing Layer Of Asphalt Concrete With Ac11s 50/70 Gr. 4 Cm;- Asphalt Concrete Binding Layer With Ac16w 50/70 Gr. 5 Cm; - The Main Foundation Made Of A Mixture Of Natural Crushed Aggregates 0/31.5 Gr. 20 Cm; - Frost Protection Layer Made Of Cement-Bound Mix C1.5/2.0 ≤ 4.0 Mpa Thickness. 22 Cm;- G3 Subsoil; • Execution Of Framing And Construction Of Pavement Surface And Parking Bay In The Area Located In The Area Of Ul. Piastowska: Sidewalk: Pavement Made Of Concrete Cubes. Gr. 6Cm; Cement-Sand Bedding 1:4 Gr. 3Cm; Cut-Off Layer Made Of Sand, Thickness 10 Cm; Parking Bay: Pavement Made Of Concrete Cubes. Gr. 8Cm; Cement-Sand Bedding. 1:4 Gr. 3Cm; The Main Foundation Made Of A Mixture Of Natural Crushed Aggregates 0/31.5 Gr. 15Cm; Cut-Off Layer Made Of Sand, Thickness 10Cm; Subsoil G3; • Regulation Of Sanitary Sewerage Wells And Water Supply Valves Located In The Roadway; 8) Ul. Serene: • Execution Of A Rainwater Drainage System With Reconstruction Of The Macadam Surface - Length 46 Running Meters + Side Drains.5. The Subject Of The Contract And The Scope Of Works Are Described In Detail In The Following Documents: 1) Functional And Utility Program - Reconstruction Of Municipal Roads Behind Ul. Kościuszko In Sierpc”, Constituting Appendix No. 2 To This Agreement; 2) Functional And Utility Program – “Reconstruction Of Ul. Brothers Tułodzieckich And Spring Of Nations In Sierpc, Constituting Appendix No. 3 To This Agreement;3) Technical Design - Reconstruction Of Gen. S. Grota Roweckiego Street In Sierpc, Constituting Appendix No. 4 To This Agreement;4) Contractors Offer Constituting Appendix No. 1 To This Agreement.6. In Order To Estimate And Evaluate The Scope Of Works, It Is Recommended To Additionally Manage: 1) The Results Of Detailed Field Inspections And Own Inventories; 2) The Results Of Own Tests And Measurements; 3) The Results Of Own Studies.7. Spring Of Nations In Sierpc, Constituting Appendix No. 3 To This Agreement;3) Technical Design - Reconstruction Of Gen. S. Grota Roweckiego Street In Sierpc, Constituting Appendix No. 4 To This Agreement;4) Contractors Offer Constituting Appendix No. 1 To This Agreement Contracts.6. In Order To Estimate And Evaluate The Scope Of Works, It Is Recommended To Additionally Manage: 1) The Results Of Detailed Field Inspections And Own Inventories; 2) The Results Of Own Tests And Measurements; 3) The Results Of Own Studies.7. The Contractor Grants The Employer, In Accordance With § 8 Of The Agreement, A Quality Guarantee For The Performed Works And Installed Devices. [Detailed Description Of The Subject Of The Contract Is Specified In Chapter Vii Swz - Due To The Limited Number Of Characters Entered In The Contract Notice]
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
92d6b8c0-102f-4713-be0a-26c72aaf99cc.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.