GTR 61547807
Tenders Are Invited For Bo - L3/06/Ix - We Focus On Professionalism - Renovation And Retrofitting Of The Workshop For Practical Vocational Training In The School Complex No. 1
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
61547807
Tendering Authority
Subscribe to view
Tender No
ZP/52/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Bo - L3/06/Ix - We Focus On Professionalism - Renovation And Retrofitting Of The Workshop For Practical Vocational Training In The School Complex No. 1
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
20-03-2023
Closed
Work Detail
1. The Subject Of The Contract Is Construction Works Consisting In The Renovation Of A Hairdressing Studio, Which Includes: Construction Works: - Replacement Of Floors: (Demolition Of Old Floor Layers: Floor Panels On The Acoustic Layer And 1X Chipboard 12 Mm Thick) And Existing Ceramic Wall Linings; - Repair Of Some Plasters Of Walls And Ceilings With Gypsum Finishing Coats, Repainting Walls And Ceilings, Tiling Parts Of Walls (At Hairdressing Washers), - Demolition Of An Unnecessary Partition Wall And Inserting Existing Electrical Wires Into Plaster (Previously Existing In Surface-Mounted Cable Trays). Electrical Works:- Robots Disassembly, - Forging Grooves, - Power Supply To Tb 3.1, - Supplementing The Equipment In Tb 3, - Installation Of A New, Fully Equipped Tb 3.1, - Installation Of Plug Sockets And Lighting, - Installation Of Lighting Fixtures And Electrical Equipment (Switch Boxes, 230 V Sockets Etc.), - Plastering Furrows Cat Iii, - Protective Measurements Of Electrical Installation, Works And Installation: - Cold And Hot Water Installation: The Internal Cold Water And Hot Water Installations As Well As The Replacement Of The Boiler Are Subject To Replacement. Ball Valves Should Be Installed On The Supply Lines. Water Pipes Must Be Insulated In Accordance With Applicable Regulations. Protective Sleeves Should Be Used When The Installation Passes Through Horizontal And Vertical Partitions. Protective Sleeves Should Have An Internal Diameter Greater Than The External Diameter Of The Cable. It Should Be Remembered That The Protective Sleeves Should Be Permanently Embedded In The Building Partition. In The Rooms, The Distribution Pipes And Approaches For Individual Utensils Should Be Led In Wall And Floor Furrows. All Pipes And Fittings For Water Installations Must Have Pzh Certificates And Sanitary Certificates. Hot Water Will Be Supplied From A New Electric Water Heater (100 Liter Boiler). Connect The Newly Made Installation With The Remaining Installation, I.E. The Installation To The Sink And The Installation Supplying Water To The Room-Class. All Vertical And Horizontal Installations Running Under The Ceiling, After Installation, Should Be Covered With Moisture-Resistant Plasterboard. Outflow Approaches From The Devices To The Riser Should Be Led With A Slope Of Min = 2.5%. Passages Through Ceilings And In The Floor Should Be Made In Protective Sleeves. There Must Be No Pipe Connections In The Sleeves. Utensils And Devices Connected To The Sewage System Should Be Equipped With Individual Water Closures (Siphons - Each Hairdressers Bowl). The New Sewage System For Hairdressing Bowls Should Be Installed With The Existing Sewage System. In Connection With The Works Carried Out From The Funds Of The Civic Budget Of The City Of Katowice, The Contractor Will Execute And Install An Information Board In The Place Indicated By The Director Of Zs1 That The Renovation Works Were Financed From The Funds Of The Civic Budget. The Contractor Will Perform All Construction Works, Deliveries And Other Activities In Accordance With The Purpose Of The Investment, The Description Of The Subject Of The Order Contained In The Swz, As Well As The Documentation Of The Procedure And Other Decisions To The Extent Necessary For The Full Implementation And Acceptance Of The Investment. The Subject Of The Contract Should Meet The Requirements Of The Currently Applicable Regulations, In Particular The Construction Law And The Executive Acts To This Law.2. The Description Of The Subject Of The Contract Is Included In The Design Documentation Including The Detailed Description Of The Subject Of The Contract, Bills Of Quantities And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Are An Integral Part Of The Tor. The Employer Informs That The Bill Of Quantities Is Only An Auxiliary Element For The Contractor And Does Not Exempt The Calculation Of The Lump Sum Offer Price On The Basis Of The Remaining Design Documentation And A Possible Site Visit.3. The Investment Area Is The Area Of The School Complex No. 1 For Them. Gen. J. Ziętka In Katowice, Available To Contractors. If The Contractor Conducts A Site Inspection On Its Own, All Information It Obtains About Local Conditions, Other Than Those Described In The Tor, Should Be Reported To The Employer. The Employer Will Decide Whether This Information Should Be Included In The Tenders.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6c70b8be-a0c3-42de-b8f9-4f433f93ab9d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)