GTR 61487518
Tenders Are Invited For Acting As An Investors Supervision Inspector Over The Implementation Of The Task Entitled: Improvement Of Energy Efficiency In Residential Municipal Buildings In Rydułtowy - Stage Vi
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
61487518
Tendering Authority
Subscribe to view
Tender No
BP.271.000005.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Acting As An Investors Supervision Inspector Over The Implementation Of The Task Entitled: Improvement Of Energy Efficiency In Residential Municipal Buildings In Rydułtowy - Stage Vi
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-03-2023
Closed
Work Detail
Description Of The Subject Of The Contract: In The Building At Ul. Gen. Józefa Bema 6/6A, Thermal Modernization Works Are Planned, Including: 1) Demolition And Disassembly Of Coal Stoves In The Form Of Room Tile Stoves, Kitchen Tile Stoves And Coal Stoves Of The Goat Type. 2) Renovation Of Basement Rooms: A) Execution Of Internal Waterproofing Of Walls; B) Dismantling The Door Woodwork; C) Demolition And Laying Of Partition Walls In The Basement; D) Replacement Of The Floor On The Ground; E) Removing The Existing Plasters; F) Performing The Injection Procedure; G) Execution Of Renovation Plasters On The Walls; H) Assembly Of Door Joinery; 3) Adaptation Of The Attic Into A Gas Boiler Room: A) Disassembly Of The Existing Boarding Partition Walls Separating The Attic From The Staircase; B) Disassembly Of The Chimney Located In Room 2.11, C) Making A Temporary Mounting Hole In The Outer Wall, Enabling The Insertion Of Steel Beams To Reinforce The Ceiling; D) Execution Of Reinforcement Of The Ceiling For The Designed Water Tanks; E) Replacement Of Floor Layers And Construction Of A Technical Platform; F) Construction Of An Appropriate Plasterboard Partition Wall Separating The Room; G) Covering Part Of The Walls With G-K System (Fire Protection); H) Plastering The Remaining Walls Not Finished With Plasterboards; I) Construction Of Internal Installations In Accordance With Industry Guidelines, J) Impregnation Of Roof Truss Elements, K) Execution Of Appropriate Roof Truss Construction (G-K System), L) Assembly Of Door Joinery, M) Accompanying Works. Waterproofing Of External Basement Walls; B) Insulation Of External Walls Of The Basement In Etics Technology; C) Roof Insulation With Polystyrene Paper; D) Replacement Of External Door Woodwork (Residential And Utility Rooms); E) Replacement Of Window Joinery; F) Installation Of Internal And External Window Sills; G) Reconstruction Of Architectural Details; H) Execution Of New Flashings; I) Execution Of The Plaster Coat; J) Painting The Facade; K) Anti-Graffiti Coating; L) Reconstruction Of The Attic; M) Reconstruction Of Door Openings To Utility Rooms; N) Reconstruction Of The Window Opening; O) Making A Roof Hatch; P) Renovation Of Existing Chimneys; Q) Gutter Replacement; R) Replacement Of Protective Window And Flower Railings; S) Installation Of A Roof Over The Entrance To The Residential Part; T) Assembly Of The Address Marking.5) Execution Of The Gas Network Connection To The Boiler Room Together With The External And Internal Installation - According To The Installation Part Of The Study,6) Retrofitting The Building With A Hot Water System, I.E. Installation Of Pipelines For Hot Water And Circulation Pipes, Cut-Off And Control Valves Along With Accompanying Works (Installation Of Dry-Running Single-Jet Water Meters With A Radio Module In Agreement With The Employer), Insulation Of Wires. Connection Of Hot Water Pipes To The Existing Or Newly Designed Ones - According To The Installation Part Of The Study, 7) Retrofitting The Building With A New, Complete Central Heating Installation With The Installation Of Heat Allocators In Agreement With The Employer, 8) Modernization Of The Internal Electrical System - According To The Installation Part Of The Study, 9) Replacement Of The Lightning Protection System - According To The Installation Part Of The Study, 10) Execution Of The Azart Installation - According To The Installation Part Of The Study, 11) Ventilation: A) Installation Of Ventilation Ducts, B) Installation Of Exhaust Grilles And Chimney Caps, C) Installation Of Thermal Insulation, D) Installation Of Housings, 12) Connection Rainwater Drainage System With Drainage: A) Drainage Of Rainwater And Meltwater To The Existing Rainwater Drainage System, B) Execution Of Band Drainage,13) Power Supply For Electric Cookers And Rainwater Drainage Pump: A) Power Supply For Designed Cookers, B) Reinforcement Of The Rainwater Pumping Station, C) Purchase And Installation Of Two-Burner Electric Stoves. Gen. Józefa Bema 28, Thermal Modernization Works Are Planned, Including: 1) Demolition Of The Existing Floor On The Ground And Laying New Layers, 2) Thermal Insulation Of The Outer Walls Of The Basement, 3) Waterproofing Of The Outer Walls Of The Basement, 4) Horizontal Insulation Of The Outer Walls Of The Basement By Injection Method, 5) Execution Of Renovation Plasters At The Basement Level, 6) Disassembly Of The Insulation Of The Eastern External Wall Of Segment No. 2 (In Consultation With The Owners Of The Neighboring Plot), 7) Execution Of Thermal Insulation (Light Wet Etics Method) Of External Walls Of The Above-Ground Storeys, 8) Demolition Of The Existing Coal Stoves, 9) Supplementing The Missing Finishing Elements In Places After Dismantled Stoves, 10) Disassembly Of The Existing Ceiling Layers Above The Usable Attic, 11) Insulation Of The Ceiling Above The Usable Attic, 12) Insulation Of The Slopes Of The Pitched Roof, 13) Disassembly Of The Existing Building Equipment Which Is In Collision And With The Works Performed And The Reassembly Of The Above-Mentioned 14) Replacement Of The Roof Hatch, 15) Insulation Of The Flat Roof Over The Connector, 16) Insulation Of The Flat Roof Over The Residential Part, 17) Building Fire Walls On Flat Roofs, 18) New Flashing, Extending The Flat Roof By Adding Additional Rafters, 19 ) Assembly Of New Gutters And Downpipes, 20) Disassembly Of The Existing Pitched Roof Covering, 21) Execution Of A New Pitched Roof Covering, 22) Execution Of A Band Around The Building, 23) Demolition Of The Existing Shafts And Installation Of System Basement Light Wells, 24) Demolition And Laying Of Partition Walls In Basement, 25) Replacement Of Window Joinery Together With The Installation Of New External And Internal Window Sills And Protective Railings, 26) Replacement Of External Door Woodwork, 27) Renovation Of External Stairs Including Disassembly Of Old And Installation Of New Balustrades, 28) Execution Of A Roofing System Over The Entrances To The Building, 29) Adjustment Room For The Gas Boiler Room, 30) Construction Of The Boiler Room Casing, 31) Reinforcement Of The Ceiling Under The Boiler Room, 32) Construction Of A Roof Hatch Between The Ceiling Beams 60X100 Cm, 33) Construction Of Roof Communication, 34) Replacement Of Wooden Elements In Order To Make A Door Opening Of Appropriate Dimensions, 35) Execution Of The Gas Network Connection To The Boiler Room Along With External And Internal Installation - According To The Installation Part Of The Study, 36) Retrofitting The Building With A Hot Water Installation, I.E. Installation Of Pipelines For Hot Water And Circulation Lines, Shut-Off And Control Valves, Along With Accompanying Works (Installation Of Single-Stream Water Meters Dry Running With A Radio Module In Agreement With The Employer), Insulation Of Wires. Connection Of Hot Water Pipes To The Existing Or Newly Designed Ones - According To The Installation Part Of The Study, 37) Retrofitting The Building With A New Complete Central Heating Installation With The Installation Of Heat Allocators In Agreement With The Employer, 38) Modernization Of The Internal Electrical System - According To The Installation Part Of The Study, 39) Construction Of The Internal Installation 40) Reconstruction And Extension Of Ventilation Ducts: A) Installation In Existing Chimneys Of Gravitational Ventilation Ducts Made Of Pipes With A Diameter Of 160 Mm, Made Of Stainless Steel, B) Installation On Chimneys Of Stainless Steel Caps - Canopies, C) Installation In New Apartments Inlet Grilles 20 X 20 Cm, D) Installation In Apartments Of Additional Gravitational Ventilation Ducts With A Diameter Of 160 Mm, Made Of Stainless Steel, Covered With Plasterboards, E) Execution Of Fastenings In The Attic For Additional, Thermally Pre-Insulated Gravitational Ventilation Ducts, F) Installation On The Roof Of System Culverts And Roof Bases For Pre-Insulated Ventilation Chimneys, G) Connection Of The Designed Chimneys To The Lightning Protection System, H) Development On The Top Floor Of The Staircase Of The Ventilation Duct 20X20 Cm With External And Internal Grilles, 41) Construction Of The Partition Wall On The 1St Floor - Apartment No. 11, 42) Demolition Partition Wall In Apartment No. 10, 43) Purchase And Installation Of Two-Burner Gas Cookers, 44) Replacement Of The Lightning Protection System - According To The Installation Part Of The Study, 45) Implementation Of Recommendations In Accordance With The Ornithological And Chiropterological Expertise, 46) Execution Of The Azart Installation - According To The Installation Part Of The Study,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8611764c-9cde-443b-a39f-ad028e24b630.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.