GTR 61161051

Tenders Are Invited For Construction And Modernization Of Cultural Infrastructure Along With Thermal Modernization Of A Public Utility Building

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
61161051
Tendering Authority
Subscribe to view
Tender No
IZP.271.4.2023.EK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction And Modernization Of Cultural Infrastructure Along With Thermal Modernization Of A Public Utility Building
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-03-2023 Closed
Work Detail
4.1. The Subject Of The Contract Is Construction Works As Part Of The Investment Entitled: Construction And Modernization Of Cultural Infrastructure, Including Thermal Modernization Of A Public Utility Building. Thermal Modernization And Renovation Of The Building Of The Municipal Cultural Center In Konstantynów. The Tasks Include In Particular: 1) Removal Of The Existing Roofing And Making A New Roof Truss Together With The Cover. Flashings And Gutters. 2) Disassembly Of The Old And Insertion Of New Windows And Doors, 3) Disassembly And Installation Of New Ceiling Layers In The Attic, 4) Demolition And Construction Of Partition Walls, 5) Internal Finishing Works: Plastering, Painting, 6) Construction Of Designed Floors And Linings 7) Insulation Of The Foundations And Facade - With Polystyrene Boards And Mineral Wool, And Finishing The Facade With Plaster8) Reconstruction Of The Boiler Room (Replacement Of The Coal Boiler With A Gas One)9) Renovation Of The Central Heating And Water And Sewage Systems10) Implementation Of The Internal Gas Installation,11) Implementation Of Air Conditioning In The Auditorium12) Reconstruction Of The Internal Electrical System,13) Computer And Telephone Installation14) Construction Of A Photovoltaic Installation With A Capacity Of Approx. 13 Kwp On The Roof Of The Building Which Will Be Located: Vestibules, Pom. Egg Disinfection, Pom. Social And Cloakroom Rooms, And Wc, Corridors, Art Warehouse. Food, Pom. Pre-Treatment Of Meat And Poultry, Pom. Pre-Treatment Of Vegetables + Warehouse, Pom. Cleaning, Washing Room, Kitchen, Cold Store For Finished Products2) Disassembly Of The Old And Insertion Of New Windows And Doors In The Existing Part Of The Building3) Removal Of The Existing Roofing And Construction Of A New Roof Truss With The Cover4) Internal Finishing Works: Plastering, Painting, Floors, Cladding ,5) Insulation Of The Foundations And Facades - With Polystyrene Boards And Mineral Wool, And Finishing The Facade With Thin-Layer Plasters In Tech. Bso6) Reconstruction And Expansion Of The Water And Sewage System7) Implementation Of Air Conditioning8) Reconstruction Of The Water Supply And Sewage Connections9) Installation Of Electric Heaters In The Added Part Of The Common Room10) Reconstruction And Implementation Of The Internal Electrical Installation 11) Implementation Of A Photovoltaic Installation With A Capacity Of Approx. 4.4 Kwp On The Roof Of The Building12 ) Delivery Of Kitchen Equipment13) Construction Of A Recreation Shelter With External Dimensions Of 8.20 M X 4.20 M With Paved Area Around 3. Construction Of A Village Hall And A Recreation Shelter In Antolin With The Necessary Technical Infrastructure 9.99 M And The Construction Of A Rectangular Recreation Shelter With Dimensions Of 6.00 M X 4.00 M. The Tasks Include In Particular: 1) Construction Of Benches Made Of Concrete C16/20, Foundation Walls Made Of Concrete Blocks 24 Cm Thick, Vertical Insulation Anti-Humidity And Thermal Insulation Made Of Styrodur, 10 Cm Thick, Finished With Mosaic Plaster2) Not External Walls Made Of Aerated Concrete, Thickness 24 Cm, And Internal Walls Made Of Aerated Concrete, Thickness 12 Cm. Permeation Coefficient In Accordance With Applicable Regulations6) Execution Of Finishing Works - Plastering, Wall Painting, Wall And Floor Cladding, Flashings7) Execution Of A Ground-Source Heat Pump With Underfloor Central Heating Installation8) Execution Of A Water Supply Connection And Internal Cold And Hot Water Installation9) Execution Of A Sanitary Sewage System With Discharge Of Sewage To The Household Sewage Treatment Plant,10) Air Conditioning Installation11) Equipping The Common Room With Tables, Chairs, Wardrobes, Furniture And Basic Household Appliances For The Kitchen,12) Implementation Of The Power Connection And Internal Electrical Installation13) Implementation Of A Photovoltaic Installation With A Capacity Of About 10 Kwp4. Thermal Modernization Of The Building Of The Commune Office In Konstantynówthe Scope Includes In Particular 1) Replacement Of Window Frames With Window Sills Made Of Coated Sheet Metal And Processing Of Window Reveals. 2) Insulation Of The Building Walls Made Of Polystyrene Boards With A Facade Made Of Thin-Layer Plaster. 3) Insulation Of The Building Walls With Mineral Wool Along With A System Facade Ventilated In A Panel System. 4) Implementation Of The Missing Lightning Protection System. 5) Disassembly And Reassembly Of Devices Located On The Walls Of The Building, Including Commissioning. 4.4. A Detailed Description Of The Subject Of The Contract Can Be Found In Appendix No. 1 To The Tor
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ef8e823b-b9b9-4e72-96b7-5b139025405b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders