GTR 61053897
Tenders Are Invited For Acting As A Supervisory Inspector In The Implementation Of The Investment Entitled Construction Of The Nursing And Housing Center In The Commune Of Strawczyn
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
61053897
Tendering Authority
Subscribe to view
Tender No
RIRP.ZP.271.1.3.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Acting As A Supervisory Inspector In The Implementation Of The Investment Entitled Construction Of The Nursing And Housing Center In The Commune Of Strawczyn
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-02-2023
Closed
Work Detail
Acting As A Supervisory Inspector In The Implementation Of The Investment Entitled Construction Of The Care And Housing Center In The Commune Of Strawczyn, In The Scope Of Works Specified In The Technical Documentation Posted On The Website: Https://Strawczyn.Ezawiajacy.Pl/Pn/Strawczyn/Demand/Notice/Public/80666/Detailstj. Procedure Reference Number: Rirp.Zp.271.1.42.2022 Construction Of The Care And Housing Center In The Commune Of Strawczyn List Of Responsibilities And Scope Of Investment Supervision Activities - Verification And Opinion Of The Design Documentation At The Execution Stage And Familiarization With The Designed Solutions - Thorough Knowledge Of The Design Documentation And The Content Of The Contract Concluded By The Employer With The Contractor Of Construction Works, As Well As The Content Of The Contract Between The Contractor And The Subcontractor Or Further Subcontractors, - Familiarization With The Construction Site, - Performing All Activities Provided For The Supervision Inspector Under The Provisions Of Art. 25 Of The Construction Law, - Controlling The Progress Of Works (Their Quantity And Timeliness) And The Quality Of The Materials, Devices And Equipment Used By The Contractor, - Ongoing Control Of The Compliance Of Construction Works By The Contractor And Subcontractors With The Material And Financial Schedule, - Current Control Of Works In The Scope Of Compliance Of Their Execution With The Design And Technical Documentation, Technical Specifications For The Execution And Acceptance Of Works, Construction Standards And Construction Law Regulations As Well As The Principles Of Technical Knowledge, - Controlling The Settlement Of Works And Making Substantive Confirmation Of The Execution Of Works, - Controlling The Correctness Of Keeping A Construction Log By The Contractor Of Construction Works And In It, Entries Regarding All Circumstances Relevant To The Conduct Of The Proper Construction Process, - Coordination Of Works, - Issuing Instructions To The Contractor Of Construction Works, Confirmed By An Entry In The Construction Log Regarding: Removal Of Irregularities Or Threats, Approval Of Construction Materials, Tests And Tests, Including Those Requiring The Discovery Of Works Or Concealed Elements, And The Presentation Of Expert Opinions On Construction Works, Evidence Of Admission To Trading And Use In Construction Of Construction Products And Technical Devices (If Applicable), - Promptly Informing The Employer About Any Circumstances That May Affect The Timeliness And Correctness Of The Performed Construction Works And About The Occurrence Of Circumstances Unforeseen In The Design Documentation, - Requesting The Contractor To Remove, Make Corrections Or Redo The Defectively Performed Works, As Well As Suspend Further Works In The Event That Their Continuation Could Cause A Threat, Be Incompatible With Occupational Health And Safety Regulations, Or Cause Unacceptable Non-Compliance With The Project, - Checking The Materials And Devices Used For Compliance With Technical Specifications, - Controlling The Quality Of Used Construction Products Within The Meaning Of Art. 10 Of The Construction Law, Requesting Additional Quality Tests Of Construction Products In Situations Provided For By Law, And Mandatory Checking Of Certificates And Declarations Of Material Conformity Presented By The Contractor Before Their Incorporation, In Accordance With The Act On Construction Products, - Providing Explanations To Possible Proposals For Changes To The Design Documentation, - Acceptance Of Disappearing And Concealed Works On Dates Agreed With The Employer And The Contractor (If Applicable), - Participation In Partial And Final Acceptance Activities, And As Part Of These Activities, Confirming Readiness For Acceptance, Providing The Employer With Acceptance Protocols And As-Built Documentation, Confirming Actually Performed Works And The Fact Of Removing Any Defects, - Confirmation Of The Performed Works As The Basis For Drawing Up An Invoice By The Contractor In Order To Pay Remuneration, - Performing The Entrusted Activities Diligently And Professionally, - Czw On Behalf Of The Employer, Over The Correct And Timely Execution Of Works And Protection Of The Employers Interests In All Aspects Of Supervision, - Compliance With Current Instructions And Guidelines Of The Employer, - Notifying The Employer Of Noticed Shortcomings In The Implementation Of Construction Works Immediately After Their Detection, - Providing Explanations On Matters Related To Documentation Design And Technical Specifications For The Execution And Acceptance Of Works, Excluding Matters Affecting The Increase In Construction Costs, The Supervision Inspector May Not Independently (Without The Consent Of The Employer) Make Decisions That Have Financial Consequences For The Employer, - Arriving At Each Justified Call Of The Employer Or The Contractor Immediately, No Later Than 2 Days From The Summons, - Providing Information On The Status Of The Works And Their Progress At The Request Of The Ordering Party, - Participation In The Preparation Of Responses To Correspondence And Any Inquiries Regarding The Construction, - Participation In Meetings Regarding Construction, As Well As Preparing And Providing The Employer With Minutes And Notes From These Meetings Within The Agreed Deadlines, - Cooperation With The Designer (E.G. Obtaining Explanations Regarding The Project And The Solutions Contained Therein) And Informing It Of Errors Or Ambiguities Found, - Providing The Employer With Written Recommendations Regarding The Valuation Of Replacement And Additional Construction Works Together With Justification, Checking The Necessity Reports, Etc. - Determining With The Employer The Type And Scope Of Necessary Works To Perform Corrective Works, - Checking Cost Estimates For Any Additional Or Repetitive Works, - Controlling The Protection Of The Construction Site By The Contractor In The Event Of Withdrawal From The Contract By Either Party, - Controlling The Contractors Compliance With Occupational Health And Safety Regulations And Environmental Protection Regulations, - Certification The Date Of Completion Of Works, - Organizing Works Related To Supervision In A Way That Does Not Cause An Unjustified Interruption In The Execution Of Works By The Contractor Or Subcontractor, - Preparation And Settlement Of All Formal And Legal Matters Related To Conducting And Completing Works And Solving Any Other Problems Arising During The Implementation Of The Investment, - Permanent Presence On The Construction Site, Ensuring Supervision Over The Investment - Constant Supervision Is Understood As The Presence Of A Supervision Inspector In The Construction And Construction Industry At Every Stage Of The Technological Process Guaranteeing Proper Implementation Investment On The Construction Site At Least Once A Week And During The Development Of The Design Documentation By Participating In The Verification And Review Of The Design Documentation At The Execution Stage And Getting Acquainted With The Designed Solutions And The Construction Site, - Presence At The Construction Site Ensuring Supervision Over The Investment - Supervision Is Understood As The Presence Of A Supervision Inspector In The Sanitary And Electrical Industry At The Construction Site At Least Once A Week During The Execution Of Works In A Given Industry And During The Development Of Design Documentation By Participating In The Verification And Evaluation Of Design Documentation On Et Implementation And Getting Acquainted With The Designed Solutions And The Construction Site. • The Indicated Time Dimension Should Be Treated As A Minimum, Which Means That Any Activities Requiring The Supervision Inspectors Presence Beyond The Indicated Limit Do Not Exempt Him From Being Present During These Activities. All Stays On The Construction Site Must Be Documented With Entries In The Construction Log.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d3e0b003-dfdd-4b7a-bcd9-22b8b7704120.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.