Design Of The New Frydenlund Primary School . Narvik Municipality Will Build A New 2-Parallel Primary School On The Narvik Peninsula. The New Primary School Has Been Decided To Be Built On The Current School Site Of Frydenlund Primary School. The Existing School Must Be In Operation During The Construction. This Contract Includes An Assessment Of Building The Primary School As A Plus House, Complete Preparation Of A Preliminary Project And Overall Contract Description With All Necessary Drawings, Requirements Specification And Competition Rules Which Form The Basis For A Tender For The Construction Of A New Primary School With Associated Outdoor Areas. A Cost Estimate Must Also Be Prepared That Gives A Realistic And Quality Circle Picture Of The Projects Total Cost Including Lcc (Life Cycle Costs) As Well As Lca (Life Cycle Assessment) Or Life Cycle Assessment Is A Systematic Mapping And Assessment Of Environmental And Resource Impacts Throughout The Entire Life Cycle Of A Product. See Tender Documents For A Detailed Description Of The Procurement.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.