GTR 60239089
Tenders are invited for Framework Agreement For The Supply Of Bitumen Emulsion C60b4-Rep 2023
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
60239089
Tendering Authority
Subscribe to view
Tender No
CXPWYRD9TTL
Financer Name
Self-Funded
Work Title
Tenders are invited for Framework Agreement For The Supply Of Bitumen Emulsion C60b4-Rep 2023
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
27-02-2023
Closed
Work Detail
The City Of Ibbenbüren Intends To Award The Delivery Of Bitumen Emulsion C60b4-Rep As A Framework Agreement. The Following Items Are Specifically Involved: 1.1 50.00 T Of Bitumen Emulsion C60b4-Rep For The Spraying And Spreading Process In Accordance With The Technical Delivery Conditions For Bitumen Emulsion Tl Be-Stb 15. Delivery Is In Individual Batches, Quantities Of 5-18T And More Simultaneously Provision Of A Storage Tank With A Maximum Capacity Of 18T And, If Required, Equipped With A Transfer Device (Pump), Which Is To Be Parked At The Ibbenbüren Construction And Service Depot, Alternatively It May Be Necessary At The Beginning Or At The End Of The Season Instead Of The Storage Tank On A 4-5T Service Tanks On Tandem Axle With Complete Heating And Spraying Device, Since The Processed Daily Amount Is Lower During This Period Calculate Unit Price. The First Delivery And The Necessary Subsequent Deliveries Are Made On Call And Must Be Made Within 2 Calendar Days. 1.2 Six-Month Provision Of An Additional Service Tank For Processing The Bitumen Emulsion. Size: 3 Tons Capacity, Tank Insulated Against Heat Loss- Bitumen Emulsion Pump Driven By Diesel Engine Or Compressed Air- Incl. All Connection Hoses And Connections, As Well As Hand-Held Spray Lance- Towing Hitch- Central Axle Trailer Tandem- Width Max. 2.20 M- Approved For Road Traffic- 24 Volts Lighting Device - Compressed Air Brake System - 40 Mm Drawbar Device - Heating Device Via Propane Gas Burner - Temperature Display The Service Tank Is Kept As A Working Machine And Carried And Used Within The Construction Sites Over The Summer Months. Billing Takes Place After Monthly Provision And Can Be Billed Separately Or When Billing The Individual Deliveries. The Specified Unit Price Refers To A Period Of One Month. The Advertised Dimensions Are Based On Experience. These Can Be Reduced, Increased Or Even Omitted If Necessary. The Emulsion Is Called Up As Required And By Telephone. Delivery Should Be Within 2 Business Days. If The Order Sum Is Exceeded By More Than 25%, The Contract Ends Automatically. By Submitting The Offer, The Contractor (Manufacturer Or Supplier) Of The Bitumen Emulsion Undertakes To Deliver Material That Must Meet The Following Properties: - Workability: The Material Must Be Seasonal, Can Be Processed/Used At Temperatures Of Up To 8°C Over A Large Area And At Points (Removal Of Potholes) Up To At Least 5°C (Air And Soil Temperature) - Immediate Setting Process: (Breaking Behavior) In Max. 15-20 Minutes For Single-Layer And Multi-Layer Construction With Grain-Graded Diabase -Precious Chippings- Flowability: Good Flow Behavior In Connection With A Short Outflow Time For A Prompt Setting Process.- Shelf Life: The Material Must Be Sufficiently Storable (4-6 Weeks). Separation Of The Stable Emulsion Must Be Within A Small Tolerance Range. Daily Pumping And Heating Of The Emulsion In The Storage Tank Is Uneconomical And Reduces The Quality. If The Required Conditions Are Not Met, Then Short-Term On-Site Appointments Must Be Made Between The Client And The Contractor To Carry Out Work Tests, Present The Problems, Determine The Causes, And Take Appropriate Corrective Measures To Eliminate Them To Achieve The Shortcomings; Defective Bitumen Emulsion Is To Be Taken Back At The Contractors Expense. And If Corrections To The Emulsion Do Not Improve The Defects Found, The Contractor Is Obliged To Submit The Documentation Of The In-House Quality Management Plan (Wpk). It May Be Necessary To Commission A Neutral, Suitable Third-Party Laboratory, The Costs For This Are Included Proven Quality Defects To Be Borne By The Contractor. The Ibbenbürener Construction And Service Company Currently Does Not Have A Sufficiently Large Spraying Machine For The Processing Of Large-Area Surface Treatments. This Requires The Provision Of An Additional Service Tank With A Maximum Volume Of 3 T For Use As A Construction Site Vehicle. Billing Takes Place After Monthly Provision (See Item 1.2).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
689c8fce-3059-4de4-8163-2d973cccc7a2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.