GTR 60236188

Tenders are invited for Construction Of A Passive Building At Ul. Piłsudskiego In Szczerców For The Needs Of Public Utility

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
60236188
Tendering Authority
Subscribe to view
Tender No
RI.3.7013.2.1.2023
Financer Name
Self-Funded
Work Title
Tenders are invited for Construction Of A Passive Building At Ul. Piłsudskiego In Szczerców For The Needs Of Public Utility
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
20-02-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Execution Of Construction Works Consisting In The Construction Of A Public Utility Building In The Passive System, An Outbuilding And A Garage Building Along With Technical Infrastructure, Demolition Of Existing Buildings. Building Area Of ​​The Public Building - 183.85 M2 Garage Buildings - 47.73 M2 Area Of ​​Access Roads - 166.50 M2 Area Of ​​Existing Buildings (To Be Demolished) - 248.15 M2 The Building Is Designed As A Three-Storey Building - Ground Floor + First Floor + Attic (Attic), Without A Basement. The Building Will Be Made In A Traditional Brick Construction. The Roof Of The Building Is Gabled, Covered With A Seam Sheet.2. The Subject Of The Contract Was Specified In Detail In The Design Documentation. The Submitted Bill Of Quantities Is Treated As An Information Document, Facilitating The Contractors Valuation. The Contractor May Use It, But Is Under No Obligation To Do So. The Contractor Is Solely Responsible For Determining The Number Of Works And For The Method Of Calculating The Lump Sum Remuneration On This Basis. The Contractor Is Obliged To, Among Others: - As-Built Geodetic Inventory, - Technical Acceptance Reports, Attestations, Guarantees And Certificates Of Origin Of The Built-In Materials Confirmed By The Manufacturer/Supplier, - As-Built Documentation Of The Facility With Changes Made During Construction, Confirmed By The Site Manager , Supervision Inspector And Designer, - Statement Of The Construction Manager On The Compliance Of The Construction Of The Facility With The Design, Applicable Regulations And Polish Standards, - Applying On Behalf Of The Employer For The Resumption And Obtaining Connection Conditions For The Facility, - Obtaining A Valid Permit For The Use Of The Facility, 5. In The Event Of Destruction Or Damage To The Works Or Equipment (E.G. Existing Utilities) In The Course Of The Works, The Contractor Is Obliged To Repair Them (Restore Them To Their Previous Condition) At His Own Expense,6. The Ordering Party Has Made Every Effort To Ensure That The Description Of The Subject Of The Order Does Not Include The Trade Name Of The Company, Goods Or Product. If In The Documents That Make Up The Description Of The Subject Of The Order, The Trade Name Of The Company, Goods Or Product Is Indicated, It Is For Information Purposes Only. The Ordering Party - In Relation To The Parameters Or Data (Technical Or Any Other) Directly Or Indirectly Identified In The Order Documentation, Which Directly Or Indirectly Identifies The Goods Or Product - Allows Equivalent Solutions, Meaning Solutions With Parameters Not Worse Than Those Required And Contained In The Documentation. If The Ordering Party Allows Solutions Equivalent To Those Described In The Documentation, But Does Not Provide The Minimum Parameters That Would Confirm This Equivalence - The Contractor Is Obliged To Offer A Product With Similar Properties, Functionally Suitable For The Required Application. If The Contractor Refers To Equivalent Solutions Described By The Ordering Party, He Is Obliged To Prove In The Offer That The Proposed Solutions Meet The Requirements Specified In The Description Of The Subject Of The Contract To An Equivalent Extent. A Proper Name Is The Name Under Which The Item It Denotes Occurs (Or Would Occur) Both In Poland And In Other Countries.7. The Employer Requires The Contractor To Make A Site Visit Before Submitting The Offer. In Order To Document The Inspection, The Contractor Should Sign The Inspection Report On The Report Drawn Up By The Employer At The Employers Headquarters, Room 15. Personal Appearance Is Required. This Is A Necessary Condition. An Offer That Will Be Submitted Without The Inspection (I.E. Lack Of Confirmation In The Employers Protocol) Will Be Rejected Pursuant To Art. 226 Sec. 1 Point 18) Of The Public Procurement Law.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
abdce951-fc2b-4a64-9369-5b851f44334a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders