GTR 60129608

Tenders Are Invited For Complete Overhauling Of Booster Pump For Hatta Ph1 Pumping Station

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
60129608
Tendering Authority
Subscribe to view
Tender No
2332300325
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Complete Overhauling Of Booster Pump For Hatta Ph1 Pumping Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
07-02-2023 Closed
Work Detail
Quotation Are Invited For Complete Overhauling Of Booster Pump For Hatta Ph1 Pumping Station. Complete Overhauling Of Booster Pump For Hatta Ph1 Pumping Station. Pump Details: Make- Torishima, Model-Cdm350x300, Equipment No.-M 37104, Head-140M, Flow-263L/S, Rpm-1475, 630Kw. Please Contact Mr. Noor Uddin (04-3229439) For Further Clarification. 1.0#Scope Of Work The Scope Of Work (Mandatory & Optional) For The Overhaul Of Booster Pumps And Their Accessories Of Booster Pumping Station. # A)#The Contractor Has To Take The Pump Assembly From Dewa Site To Their Workshop & Vice Versa. Dewa Shall Not Provide Any Transpor T To Shift The Same. For Loading & Unloading Contractor Can Use Dewa Overhead Crane Available At Pumping Stations In Coordination W Ith The Dewa Representatives. B)#Mechanical Seal Replacement, Coupling Bush Renewal & Gland Packing Renewal, Bearing Replacement As Required. C)#Overhauling Of Pump (See Annexure I-Mandatory & Ii-Optional) D)#Painting Of Pump Externally E)#Rectification Of The Pum P For Any Complaint Rose After Installation. F)#If Any Part Is Found Defective, The Contractor Has To Repair/Replace The Same. Avail Able Spare Shall Be Supplied By Dewa. If Any Spare Is Not Available With Dewa The Contractor Has To Arrange The Same. Additional Cos T Of Spare To Be Submitted To Dewa For Approval Before Placing The Order. 2.0#Prior To Submission Of Quotation, The Following Sha Ll Be Determined Carefully: A)#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Acces S Facilities, Complexities, Etc., Before Submitting The Quotation. B)#Dewa Will Not Accept Any Claim For Extras Beyond The Order Ra Tes / Prices During And After The Execution Of Work Ordered. C)#The Contractor Will Be Provided With The Equipment Shutdown Program In Coordination With Operation & Maintenance Department Of Water Division. D)# The Contractor Should Submit The Time Schedule /Bar Chart Indicating Each Activity. E)#On Completion Of The Work, The Inspection Checklist Of Quality Procedures, Wherever Applicable Should Be Filled In And Submitted. F)#Site Supervision, Co-Ordination Of Field Activities, Supply Of Required Technicians, Tools, E Quipments, Tackles Etc. Required For Execution Of The Contract Works Shall Be Suitably Considered. 4.0#Take Over On Completion Of All Work Within The Scope Of The Contract, For Acceptance Of The Maintenance Work, Contractor Shall Notify Dewa In Writing. A Ce Rtificate Of Completion Will Be Issued By Dewa On Final Inspection Only When The Contract Work Is Deemed To Have Been Taken Over By Dewa After Necessary Condition Monitoring Checks Wherever & Whenever Required. 5.0#Warranty A)#All The Work Carried Out Shall Ca Rry A Warranty For 8000 Hours Of Operation Or 1 Year Whichever Is Earlier. B)#The Guarantee Will Take Effect From The Date Of Takeo Ver By Dewa Of The Job Carried Out By The Contractor. C)#When A Defect Is Noticed During The Period Of Warranty, The Contractor Mus T Rectify The Defect Within A Reasonable Amount Of Time Fixed By Dewa With No Claim Or Compensation. 6.0#Documents: # On Satisfact Ory Completion Of The Work & Handing Over, The Contractor Should Submit The Following To Dewa. ## A)#Inspe Ction Report. B)#Overhaul Report. C)#Job Completion Report For Jobs Other Than Routine Inspection & Overhauls D)##As-Fitted# Bill Of Materials For Consumption Of Spares E)#Requisition For Planning Of Spares By Dewa Based On Current Condition Of The Equipment Fo R Which Maintenance Work Was Taken Up. Annexure # I Detail Scope Of Work (Mandatory) For Overhaul The Booster Pump Of Pumping Station Sl.No#Activity#Remarks# 01#Dismantling Of The Pump#Dismantling Of The Pump As Per Dewa Engineer#S Instruction# ##Pump Sh All Be Removed As Per Sequence With Skilled Workmanship & Care Qty: 1 Complete Overhauling Of Booster Pump For Hatta Ph1 Pumping Station. Pump Details: Make- Torishima, Model-Cdm350x300, Equipment No.-M37104, Head-140M, Flow-263L/S, Rpm-1475, 630Kw. Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332300325
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6eaf16c0-5665-4e5e-87b8-a6f110f8df50.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders