GTR 60062794
Tenders are invited for Adaptation Of The Rooms Of The Former House Of Saint Faustina In Gołdap For The Needs Of The Complex Of Educational And Educational Institutions In Gołdap.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
60062794
Tendering Authority
Subscribe to view
Tender No
ZPEW.272.1.2023
Financer Name
Self-Funded
Work Title
Tenders are invited for Adaptation Of The Rooms Of The Former House Of Saint Faustina In Gołdap For The Needs Of The Complex Of Educational And Educational Institutions In Gołdap.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-02-2023
Closed
Work Detail
1. The Subject Of The Contract Is Adaptation Of The Rooms Of The Former House Of Saint Faustina In Gołdap For The Needs Of The Complex Of Educational And Upbringing Institutions In Gołdap. The Task Is Implemented From The Funds Of The Covid-19 Prevention Fund For Local Government Units.2. Location: City: Gołdap, Obt. Registration Office Gołdap, Ul. Wojska Polskiego, Registration Plots Marked With Registration Numbers: 1042/3 And 1042/4, Gołdap District, Province Warmia And Mazury.3. The Scope Of The Contract Includes: Reconstruction And Change Of Use Of The Kitchen Into Rooms For Didactic Purposes, Along With Back-Up Rooms And A Sanitary Facility. Changing The Use Of The Former Kitchen And Accompanying Rooms Of The Extension Located On The Ground Floor On The North Side Into Three Teaching Rooms With Back-Up Facilities And A Sanitary Facility (Womens And Mens Toilets And Toilets For The Disabled). The Rooms Will Be Created By Demolishing The Existing Partition Walls And Making New Partitions For Two Rooms For 20 People And One For 45 People, As Well As Enlarging Two Windows, Replacing Single-Leaf External Doors With A Clear Opening Of At Least 90 Cm Wide, And Rebuilding External Stairs. In Order To Ensure Ventilation In The Sanitary Facility, The Addition Of A Chimney On The Flat Roof With The Outlet Of The Pipes Above The Adjacent Roof. The Teaching Rooms Should Be Ventilated Based On The Existing Fireplaces On Which Hybrid Turbovents Should Be Installed, Ensuring The Exchange Of 0.5-2 Per Hour (Chimney Cowls Supporting The Chimney Draft). And Designed. For Safety Reasons, When Replacing Windows, Railings With A Height Of 110 Cm And Openwork Not Larger Than 12 Cm And Wooden Radiator Covers Made In Accordance With The Provisions Of The Regulation Of The Minister Of Infrastructure Of 12 April 2002 On The Technical Conditions To Be Met By Buildings And Their Location /I.E. Journal U. 2019, Item 1065/. Balustrades Of External Stairs And Windows Made To The Investors Request In An External Company Supplying The Above. Partitions In Bathrooms As Light Partitions Made Of Hpl System Boards Made To The Investors Request In An External Company Supplying The Above. In The Bathroom For The Disabled, A Set Of Holders With Certificates Should Be Installed. Dilate The Wall From The Ceiling With Polyurethane Foam. B) Lintels Type N And L19. C) Plasters - Smooth, Cement-Lime Plasters, Category Iii; White Color Ral 9010. D) Floors - In Rooms Where The Degree Of Damage To The Floors As A Result Of Reconstruction (Demolition Of Walls Partitions) Is Small, The Top Layer Should Be Made Of Non-Slip Stoneware Tiles Laid On Glue; - In Rooms Where The Degree Of Floor Damage As A Result Of Reconstruction (Demolition Of Partition Walls) Is Significant, The Top Layer Should Be Made Of Anti-Slip Stoneware Tiles Laid On Glue On A 4 Cm Layer Of Screed (Possible Differences In The Height Of The Floor Should Be Filled With Polystyrene Floor-Roof). The Screed And Polystyrene Should Be Covered With Polyethylene Foil, Thickness 0.2 Mm.E) Sanitary Rooms: In Bathrooms Tiles Up To A Height Of 2 M; Floor Drains, Water Tap, Toilet Cubicle Partitions - System Partitions Made Of Hpl Board, Minimum Height 2 M, Maximum Floor Clearance 15 Cm, A 150/150 Wheelchair Maneuvering Area Is Provided, Toilet And Wash Basin Equipped With Auxiliary Handles. Supplement The Façade With Thin-Layer Structural Plaster In The Color Of The Existing Façade. G) Pvc Windows In White Color According To The Woodwork List. H) Dark Brown Aluminum Doors. Doors To Bathrooms Undercut Or With Air Supply Grilles 0.022 M2. Door In The Corridor With Hinges Enabling The Leaf To Be Placed On The Wall.I) White External Window Sills Made Of Coated Sheet Metal.J) External Stairs Should Be Finished With Non-Slip Stoneware, Including Space For A Doormat. Provide External Lighting Above The Entrance. External Balustrade Mounted From The Front To The Stairway, Prefabricated. K) Three-Channel Ventilation Chimney Made Of Konekt System Fittings, Insulated Over The Last Ceiling With Mineral Wool, Thickness 6 Cm, Finished With Thin-Layer Structural Plaster On A Mesh; Turbovents (Chimney Cowls Supporting The Chimney Draft). Horizontal Ventilation Ducts Made Of Non-Combustible Spiro Fi 150 Pipes, Covered With A Pgk Board On A Frame (Waterproof Board). A Detailed Description Of The Subject Of The Contract Is Included In Particular In: A) Design Documentation, B) Technical Specification For The Execution And Acceptance Of Construction Works, C) Bill Of Quantities, 5. The Subject Of The Contract Must Be Performed In Accordance With Applicable Law, In Particular The Act Of July 7, 1994 Construction Law (Consolidated Text, Journal Of Laws Of 2021, Item 2351, As Amended) Along With Executive Regulations, Standards And Manufacturers Instructions Equipment And Materials Used, Principles Of Technical Knowledge And Construction Art, Under The Supervision Of Representatives Of The Employer - Investor Supervision Inspector And The Employer Himself.6. The Subject Of The Contract Should Be Performed With The Participation Of People With Appropriate Qualifications And Experience (Sectoral Works Managers).7. The Materials Supplied And Used By The Contractor Should Meet The Quality Requirements Of Products Approved For Use In The Construction Industry, As Specified In Art. 10 Of The Act Of 7 July 1994 Construction Law (Consolidated Text, Journal Of Laws Of 2021, Item 2351, As Amended8. The Performance Of The Subject Of The Contract And Commissioning Must Also Comply With All Legal Acts Applicable To The Subject Of The Contract, With Technical And Construction Regulations, Applicable Standards And Guidelines.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cf31be7d-8cb0-4d21-bbc2-f3c82ef022c4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.