GTR 59860873

Tenders are invited for Reinforcement Of The Surface Of Świetlińska Street In Kajkowo

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
59860873
Tendering Authority
Subscribe to view
Tender No
ZP.2610.3.2023.MT
Financer Name
Self-Funded
Work Title
Tenders are invited for Reinforcement Of The Surface Of Świetlińska Street In Kajkowo
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-02-2023 Closed
Work Detail
1) The Subject Of The Contract Is The Reinforcement Of The Surface Of Świetlińska Street In Kajkowo. The Street Has A Bituminous Surface In Poor Technical Condition (Numerous Cracks And Cavities). The Width Of The Surface Is Approx. 6 M. On The Left Side Of The Street There Is A Pedestrian Path Made Of Prefabricated Paving Stones. Renovation Of The Pavement - Laying A Reinforcing Layer, Thickness 4 Cm - Roadsides Made Of Reclaimed Asphalt. Note: Resistors And Curbs Are Provided By The Employer. Materials To Be Collected By Transport Contractors From Pphu Spręcowo Krzysztof Mańkowski (Żabi Róg). The Costs Of Loading, Transport And Unloading Shall Be Borne By The Contractor. The Collection Of Materials Should Be Agreed With The Manager Or Foreman Of The Road District No. 2 In Morąg In Order To Write Down A Report On The Quantity And Condition Of The Received Pallets. The Pallets On Which The Material Is Collected Should Be Returned To Polbruk Florczaki 28 A, 14-105 Łukta. The Contractor Is Responsible For Returning The Pallets Or Paying Their Value (In The Event Of Damage Or Not Handing Over To The Above-Mentioned Company) In The Amount Of Pln 50 Per Item (Net). The Scope Of Works Carried Out Includes The Execution Of Preparatory Works Enabling The Implementation Of The Ecological Bitumen Project, The Purpose Of Which Is To Create A Road Surface That Will Reduce Air Pollution In The Area Of ​​The Right-Of-Way. In Connection With The Above, The Contractor, After Performing Demolition And Surface Works, Repairing The Pavement And Adjusting The Equipment By June 15, Will Make The Construction Site Available For The Execution Of Works Related To The Execution Of The Wearing Course As Part Of The Project. 2 Weeks Before Commencing Works Related To The Execution Of The Wearing Course, The Employer Will Call The Contractor To Adjust The Equipment. After Completing The Wearing Course As Part Of The Project In Question, The Contractor Will Proceed With The Construction Of Roadsides From Reclaimed Bitumen Pavement. The Costs Of Loading And Transporting Reclaimed Material From The Storage Yard At 62A Grunwaldzka Street Are Charged To The Contractor. The Employer Allows For A Change In The Scope Of Construction Works By Limiting Them To Reclaim Transferred From The Milling Of The Existing Bituminous Surface, Together With The Costs Of Loading And Transporting Reclaimed Material From The Storage Yard At 62A Grunwaldzka Street, In A Situation Where The Scope Of Works Related To The Implementation Of The Ecological Bitumen Project Is Not Completed. In Addition, The Subject Of The Order Includes The Performance Of All Auxiliary And Accompanying Works Necessary For The Proper Implementation Of The Subject Of The Contract, Including: A) Preparation Of A Temporary Traffic Organization For The Duration Of The Works; B) Securing The Area Where The Works Will Be Carried Out (Construction Site); D) Maintaining Law And Order During The Works On The Construction Site And Adjacent Properties Contaminated As A Result Of The Works; E) After Completion Of The Works, Clearing And Tidying Up The Neighboring Properties Contaminated As A Result Of The Works And The Area Where The Works Were Carried Out; F) The Contractor Will Protect The Geodetic Control Points Located On The Construction Site Against Damage, And In The Event Of Damage, He Will Restore Them At His Own Expense.2) Reasons For Not Dividing The Contract Into Lots: The Subject Of The Contract Is The Reinforcement Of The Surface Of Świetlińska Street In Kajkowo. The Contracting Authority Does Not Plan To Divide The Contract Into Lots, As Its Size Does Not Constitute A Barrier To Access To The Contract For Smes. At The Same Time, Dividing The Contract Into Parts Would Threaten: A) Proper Performance Of The Contract Due To Difficulties In Coordinating The Activities Of Various Independent Contractors; B) Timely Performance Of The Contract And Determination Of The Entity Responsible For The Delays; C) Difficulties In Enforcing Warranty Rights After The Completion Of The Subject Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7b55e729-0b7b-4a46-9e80-08ca3e78bd90.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders