GTR 59860683
Tenders are invited for Reconstruction, Expansion And Superstructure Of The Peoples House In Lubatowa With A Change In The Use Of The Attic.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
59860683
Tendering Authority
Subscribe to view
Tender No
IR.271.2.2023.IZ
Financer Name
Self-Funded
Work Title
Tenders are invited for Reconstruction, Expansion And Superstructure Of The Peoples House In Lubatowa With A Change In The Use Of The Attic.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-02-2023
Closed
Work Detail
The Subject Of The Proceedings Is The Implementation Of The Contract Entitled: Reconstruction, Extension And Superstructure Of The Peoples House In Lubatowa With A Change In The Use Of The Attic. On: • Extension Of The Existing Building Of The Peoples House By A Three-Storey Part On The North-West Side Together With Internal Installations, • Reconstruction Of The Ground Floor (Excluding The Pharmacy) In Order To Construct A Multifunctional Hall, Room Back Of The Auditorium, Cloakroom, Sanitary Facilities - Public Toilet With A Toilet For The Disabled, Kitchen Facilities, Staircase, Lift For The Disabled (The Scope Includes The Construction Of New Partition Walls, Floors, Wall Linings, Replacement Of Woodwork And Internal Installations), • Reconstruction Storey 1 Floor In Order To Make Pom. Cloakroom Facilities For The Actors Of The Auditorium, Sanitary Facilities - A Public Toilet With A Toilet For The Disabled, A Multimedia Common Room, A Library, A Staircase, A Lift For The Disabled (The Scope Includes The Construction Of New Partition Walls, Floors, Wall Linings, Replacement Of Woodwork And Internal Installations) , • Reconstruction Of The Attic Storey In Order To Make Additional Rooms. Senior Club, Pom. Office Building For The Sołtys, Service Premises - A Beauty Salon, Staircase, Lift For The Disabled (The Scope Includes The Construction Of New Partition Walls, Floors, Wall Linings, Replacement Of Woodwork And Internal Installations), • Construction Of A New Gable And Flat Roof Structure Over The North-Eastern Part (A Wooden Rafter Roof Structure Based On A Single-Bay Steel Frame), Changing The Roof Geometry, Raising The Ridge In Relation To The Existing One, Rebuilding The External Walls (Knee Walls And Gable Walls) And Internal Walls At The Attic Level, And Installing Internal Installations For The Purpose Of The Obtained Storey For Service Purposes. Works Include, Among Others: - Demolition Works - Earthworks For The Foundations Of The New Part - Strengthening The Foundations Of The Existing Building - Renovation And Adaptation Of Existing Rooms - New Walls And Partitions - Replacement Of Window And Door Woodwork - New Floors - R Painting Work - Delivery Of Equipment - External Works - Photovoltaic Installation - Central Heating, Hot Water - Internal Gas Installation - Rainwater Drainage System - Hydrant Installation - Internal Water And Sewage Installation - Mechanical And Gravitational Ventilation - Air Conditioning - Thermal Insulation Of The Facility - Drilled Well With Water Supply Connection - Sanitary Sewage System Connections - Internal Rainwater Drainage System - Shortening Of The Telecommunications Connection - Reconstruction Of The Cable Supplying The Telecommunications Cabinet - Land Development In Connection With The Above, The Contractor Will Leave The Existing Water Supply And Power Connections Until The Scope Of Execution Of The Drilled Well With Connections And Distribution Of The Network To The Kindergarten Building Is Completed. After The Works Are Completed, The Contractor Will Move The Existing Water Treatment Plant To The Technical Room In The Peoples House In Order To Ensure A Continuous Supply Of Water To The Kindergarten And Pharmacy Buildings - The Works Should Be Included In The Valuation Of The Works. And Putting It Into Use. The Final Location Of The Drilled Well Should Be Confirmed By Additional Geological Survey - The Works Should Be Included In The Valuation Of The Works. Note! The Contractor Will Ensure Continuous Water Supplies To The Pharmacy And Kindergarten Through The Water Treatment Installation Located In The Facility Under Reconstruction. If It Is Necessary To Turn Off Water Supplies, The Contractor Shall Be Obliged To Notify The Employer And Facility Managers Of The Date Of Suspension Of Supplies At Least 10 Working Days Before The Suspension Of Water Supplies. Suspension Of Water Supplies May Not Last Longer Than A Justified Need Confirmed By The Supervision Inspector And The Site Manager. In The Event Of A Water Supply Interruption, The Contractor Shall, At His Own Expense, Ensure The Supply Of Potable Water To The Kindergarten And Pharmacy In The Amount Necessary For Their Proper Functioning. Note! The Contractor Provides Full Geodetic Services At His Own Cost. The Detailed Scope Of Works Covering The Subject Of The Contract Is Specified In Annex No. 9 - Technical Documentation Part 1 And Part 2 (The Entire Order) - An Attachment To Be Downloaded From The Website Of The Conducted Procedure. Note!! If Standards, Technical Approvals, Proper Names, Tools, Materials, Etc. Are Used In The Tender Documentation (Swz With Attachments), They Should Be Treated As Exemplary For The Purpose Of Specifying The Subject Of The Contract And Specifying The Technical And Quality Standard - The Contracting Authority Allows Equivalence. Tools And Materials To Perform The Contract Should Be Accepted In The Quality Category Not Lower (Equivalent) Than That Indicated In The Tor And Its Attachments. The Products Used Should Comply With The Applicable Law. The Contractor Who Refers To The Equivalent Solution Described By The Employer In The Tender Documentation Is Obliged To Demonstrate That The Equivalent Product Offered By Him Meets The Requirements Specified By The Employer. A List Of Equivalent Products Together With Evidence Confirming The Fulfillment Of The Equivalence Features Of The Offered Products Shall Be Submitted By The Contractor Together With The Offer. If The Contractor Does Not Submit A Statement On The Use Of Equivalent Products In The Offer (By Submitting A List Of Equivalent Products And Supporting Evidence), It Is Understood That The Products Proposed In The Tender Documentation Were Included In The Performance Of The Subject Of The Contract. The Guarantee Period Provided By The Contractor Must Be At Least 60 Months . The Warranty Period Is Equal To The Period Of The Quality Guarantee Granted.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b84aace7-7a83-4de8-92f5-bdc3ed1a48cf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.