Tenders are invited for Construction Of A Water Treatment Plant With An Underground Water Intake And All Necessary Technology And Technical Infrastructure In The Czastary Commune

Tender Detail

59860542
ITOS.271.2.2023
Self-Funded
Tenders are invited for Construction Of A Water Treatment Plant With An Underground Water Intake And All Necessary Technology And Technical Infrastructure In The Czastary Commune
ICB
Central Europe
European Union
09-02-2023

Work Detail

1. The Subject Of These Proceedings Is The Preparation Of Design Documentation And Obtaining The Necessary Decisions, Opinions And Permits, Including A Final Decision On The Building Permit Or Notification Of The Intention To Perform Construction Works (To Which No Objections Have Been Raised) And The Performance Of Construction Works For The Task Entitled: Construction Of A Water Treatment Plant With An Underground Water Intake And All Necessary Technology And Technical Infrastructure In The Czastary Commune. In The Design Build Formula. 2. The Planned Investment Project Is Located In K ty Walichnowskie, The Czastary Commune, On The Plot With Registration Number 107. The Subject Of The Contract Is The Design And Construction Of A New Underground Water Intake, A New Water Treatment Plant And The Accompanying Underground Technical Infrastructure And Above-Ground On The Plot Marked With The Registration Number 107 In The Town Of K ty Walichnowskie, Czastary Commune. .4.Description Of The Subject Of The Contract According To The Application For Co-Financing: Description Of The Task The Investment Will Consist In: - Performing Design Works And Construction Works In The Design And Build System, I.E. Design And Execution Of A Drinking Water Intake (1 Or More), Along With The Design And Construction Of A Water Treatment Plant Together With With All The Necessary Internal And External Technology And Technical Infrastructure In The Czastary Commune, - Obtaining The Legally Required Approvals, Permits, Decisions As Well As All Construction And Assembly Works Related To The Works Described In The Functional-Utility Program (Fup) And Those Not Listed But Necessary For Proper Implementation Of The Task 1. Development Of Complete Design Documentation Based On The Fup And Data Contained In The Documents Made Available, Necessary To Perform Construction Works Under The Task In Question And Including In Particular The Development Of: - Construction Design With Obtaining A Valid Building Permit Decision, - Obtaining A Decision On The Location Of The Investment For The Public Purpose, - Obtaining An Environmental Decision For The Planned Project (If Required By Separate Regulations), - Designs And Studies Resulting From The Obtained Agreements And Decisions, - Other Necessary Decisions, Arrangements Necessary To Achieve The Investment Objective 2. Construction And Assembly Works For The Construction Of 1 Or More Drinking Water Intakes, Together With The Construction Of A Water Treatment Plant And Technical Infrastructure In The Scope Of: - Drilling A New Well (1 Or More, Depending On The Need) - Constructing A Water Well Casing (1 Or More, Depending On The Necessity) - Delivery And Installation Of Well Pumping Equipment (1 Or More) - Connection Of The Well To The Water Treatment Plant (1 Or More), - Construction Of A Water Treatment Plant Using Water Treatment Technology (If Such Treatment Is Necessary) - Construction Of A Clean Water Tank (1 Or More), - Construction Of A Pumping Station (1 Or More) - Execution Of Internal Installations - Water Treatment Plant - Assembly Of The Rg Switchgear - Execution Of A Signal Line For Level Sensors In The Treated Water Tank - Execution Of An External Cable Line, - Construction Of A Signal Line For Level Sensors In Deep Wells - Delivery And Installation Of A Power Generator, - Construction Of A Building Water Treatment Plant, - Construction Of A Backwash Water Settling Tank With Infiltration Drainage (1 Or More), - Construction Of A Road And An Internal Square, - Construction Of A Wtp Fence, - And Other Construction And Assembly Works That Are Not Recommended, But Necessary And Justified, Resulting From The Preparation Of The Project.5. As Part Of The Order, The Contractor Is Obliged To: 1) Develop A Technical Concept Of The Proposed Solutions Based On The Fup, Including: A) A General Balance Of Water Demand, B) Determining The Hydraulic Conditions For Supplying The Water Supply Network, C) The Proposed Water Treatment Technology, D) A Proposal For The Construction Of A Water Storage System Treated In The Area Covered By The Investment Project, Taking Into Account The Construction Of Two Retention Tanks For Treated Water With A Capacity Of Each Tank V=100 M3 And A Total Tank Capacity Of 200 M3, E) Defining The Technology For Cleaning And Draining Backwash Water, F) Defining The Proposed Architectural And Construction Solutions Station Building Water Treatment. The Building Should Be Made In The Traditional Brick Technology. The Concept Should Also Present The Proposed Solutions For Supplying The Receiving Network With Treated Water By Building A New Second-Stage Pumping Station - A Pumping And Hydrophore Set, Supplying The Receiving Water Supply Network. The Technical Concept And The Solutions Presented In It, Including Proposals For The Use Of Devices And Materials Require The Employers Approval Before Starting The Preparatory Phase For Design Works. The Concept Should Be Accompanied By Material Applications For Basic Equipment And Fittings. 2) Prepare An Application Together With The Project Information Sheet In Order To Obtain A Decision On Environmental Conditions For The Implementation Of The Project, 3) Prepare An Application For A Decision On Determining The Conditions For The Location Of A Public Purpose Investment For The Investment Project, 4) Develop Hydrogeological Documentation Of The Water Intake In Category B Along With Obtaining An Approving Decision Of The Marshal Of The d Voivodeship Or The Staroste Of Wierusz w, Depending On The Actual Volume Of The Intake Resources Obtained And Applied For, 5) Develop A Water-Legal Survey For The Provision Of Water Services In The Field Of Water Intake Groundwater, Groundwater Treatment, Water Storage And Distribution, And Drainage Of Backwash Water To The Receiver,6) Perform Hydrotechnical (Geological) Tests Of The Soil And Hydrogeological Documentation For The Purposes Of Developing Design Documentation For The Construction Of Foundations Of The Re Reservoir Of Treated Water, Backwash Water Settling Tank, Suw Building, 7) Prepare Design Documentation In Accordance With The Principles Set Out In 1A Of The Agreement For Conceptual Solutions Approved By The Employer, Covering The Following Industries: A) Technological (In The Field Of Water Treatment) B) Water And Sewage In The Field Of Internal Installations And External, C) Electrical, D) Automation And Control, E) Structural, F) Architectural, G) Road, H) Land Development. An Objection Was Raised), 9) Draw Up A Technical Specification For The Execution And Acceptance Of Works (Hereinafter Referred To As Hereinafter Referred To As Stwior), 10) Perform Construction And Assembly Works In The Scope Specified In The Fup And The Design Documentation Prepared On Its Basis, 11) Perform Authors Supervision, 12) The Contractor Will Develop A Start-Up Program And A Training Program, Along With A Schedule That Must Be Agreed And Obtained Acceptance Of The Ordering Party. 13) Obtain A Decision On The Use Permit.6. The Developed Design Documentation Will Include At Least: A) Construction Design Containing A Plot Or Area Development Plan, An Architectural And Construction Design And A Technical Design - Developed In Accordance With The Fup, With The Requirements Of The Construction Law Of 7 July 1994 In Force In Poland (Journal Of Laws Of 2021, Item 2351, As Amended) Together With The Preparation Of An Application For A Building Permit/Notification Of Construction Works (Where Applicable) And Obtaining All Necessary Approvals, Arrangements, Guidelines, Opinions - 4 Copies B) Executive Documentation For Purposes Of The Investment Implementation 4 Copies C) Stwiorb-3 Copies D) Bills Of Quantities - 4 Copies E) Investors Cost Estimates - 4 Copies F) Bioz Plan - 4 Copies G) Works Organization Plan And Temporary Traffic Organization Plan - 4 Copies .H) Other Documents Listed In The Fup - 4 Copies And Documents After The Task, Including: I) As-Built Documentation - 3 Copies J) As-Built Survey Report - 3 Copies) Inspection And Test Reports - 3 Copies) As-Built Cost Estimates - 3 Copies) D Decision On Permission To Use - 1 Copy) Folder With The Originals Of All Obtained Arrangements - 1 Copy10. Construction And Assembly Works Include The Construction Of A Water Treatment Plant With An Underground Water Intake And All The Necessary Technology And Technical Infrastructure In The Czastary Commune, At Least In The Scope Of: A) One Deep Well - Underground Water Intake (The Geological Works Design For The Well Of The Employer And Is Not Included In The Scope Of The Task. The Scope Of The Task Includes The Execution Of The Underground Water Intake In Accordance With The Content Of The Documentation - The Design Of Geological Works Together With Accompanying Works, Including The As-Built Geological Documentation. All Conditions For The Implementation Of Works, Which Were Specified In The Decision Of The Wierusz w Starost No. As.65301.1.2022), B) A Water Treatment Plant, Including A Building Made In The Traditional Brick Technology Or, Alternatively, With A Frame Structure, C) Two Treated Water Retention Tanks With A Capacity Of 100 M3, Each Of The Tanks, D) A Backwater Sedimentation Tank, E ) Accompanying Infra Above-Ground And Underground Water, Sewage And Electricity Structures, F) Power Generator, G) Land Development. Along With: H) Geodetic Services; A Detailed Description And The Method Of Order Execution Include: Functional - Utility Program With Attachments - Annex. No. 7 To Swz And Swz (Due To The Limited Number Of Characters In The Announcement).

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail