GTR 59860400

Tenders are invited for Execution Of Construction Works As Part Of The Investment Task Titled: Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów And Ul. Szkolna And Ul. 11-Listopada (From Ul. T. Kościuszki To The Intersection With Ul. Szkolna)

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
59860400
Tendering Authority
Subscribe to view
Tender No
ZI-1.271.4.2023
Financer Name
Self-Funded
Work Title
Tenders are invited for Execution Of Construction Works As Part Of The Investment Task Titled: Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów And Ul. Szkolna And Ul. 11-Listopada (From Ul. T. Kościuszki To The Intersection With Ul. Szkolna)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-02-2023 Closed
Work Detail
1.1. The Subject Of The Order Is The Execution Of Construction Works Related To The Implementation Of The Investment Task Entitled: Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów And Ul. Szkolna And Ul. 11-Listopada (From Ul. T. Kościuszki To The Intersection With Ul. Szkolna)”. The Investment Will Be Co-Financed From The Polish Ład Government Fund: Strategic Investment Program No. Edycja2/2021/1590/Polish Ład. 2. The Scope Of The Subject Of The Contract Referred To In Point 1.1 Concerns: 1) Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów Based On The Design Documentation Held By The Employer, For Which The Building Permit Decision No. 30/2021 Of 08.01 Was Issued .2021.2) Redevelopment Of Ul. Szkolna And Ul. 11-Listopada (From Ul. T. Kościuszki To The Intersection With Ul. Szkolna) Based On The Design Documentation Held By The Employer, For Which A Certificate Of No Grounds For Raising An Objection Was Issued, No. Ba.6743.1.144.2017 Of November 7, 2017.3 . The Detailed Scope Of The Subject Of The Contract Was Defined In: 1) For The Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów: A) Construction Design For The Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów. Design Unit: Construction Company Inżbud Tomasz Zieliński, Ul. Radkowska 61A, 57-402 Nowa Ruda; B) Detailed Design For The Reconstruction Of Access Roads To Primary School No. 3 In Dzierżoniów. Design Unit: Construction Company Inżbud Tomasz Zieliński, Ul. Radkowska 61A, 57-402 Nowa Ruda; C) A Project Of Permanent Traffic Organization In Connection With The Implementation Of Works, Reconstruction Of Access Roads To School No. 3; D) A Project Of Temporary Traffic Organization In Connection With The Implementation Of Works, Reconstruction Of Access Roads To School No. 3; Design Unit: Construction Company Inżbud Tomasz Zieliński, Ul. Radkowska 61A, 57-402 Nowa Ruda; E) Technical Specification For The Execution And Acceptance Of Works - December 2020; F) Bill Of Quantities As Auxiliary Material. Construction Design: Renovation Of Ul. Pocztowa In Dzierżoniów Along With The Reconstruction Of The Street Lighting Network. 2) For The Reconstruction Of Ul. Szkolna And Ul. 11-Listopada (From Ul. T. Kościuszki To The Intersection With Ul. Szkolna): A) Construction Design For The Investment Under The Name: Reconstruction Of Ul. Szkolna And November 11 From Ul. Kosciuszko To Ul. Szkolna”: Communication System-Rainwater Drainage-Lighting. Design Unit: Design And Supervision Department Dro-Instal Mgr Inż. Kazimierz Strzelczyk, Ul. Świdnicka 24, 58-200 Dzierżoniów; B) Detailed Design For The Investment Under The Name: Reconstruction Of Ul. Szkolna And 11 November (From Ul. Kościuszki To Ul. Szkolna): Communication System. Design Unit: Design And Supervision Department Dro-Instal Mgr Inż. Kazimierz Strzelczyk, Ul. Świdnicka 24, 58-200 Dzierżoniów; C) Construction And Executive Design For The Investment Under The Name: Reconstruction Of Ul. Szkolna And November 11 (From Ul. Kościuszki To Ul. Szkolna): Street Lighting. Design Unit: Design And Supervision Department Dro-Instal Mgr Inż. Kazimierz Strzelczyk, Ul. Świdnicka 24, 58-200 Dzierżoniów; D) Detailed Design For The Investment Under The Name: Reconstruction Of Ul. Szkolna And 11 November (From Ul. Kościuszki To Ul. Szkolna): Rain Water Drainage System. Design Unit: Design And Supervision Department Dro-Instal Mgr Inż. Kazimierz Strzelczyk, Ul. Świdnicka 24, 58-200 Dzierżoniów; E) The Project Of The Target Traffic Organization In The Scope Of The Municipal Internal Road For The Investment Under The Name: Reconstruction Of Ul. Szkolna And 11 November (From Ul. Kościuszki To Ul. Szkolna). Design Unit: Pracownia Projektowania I Nadzoru Dro-Instal Kazimierz Strzelczyk, 24 Świdnicka Street, 58-200 Dzierżoniów; Szkolna And November 11 (From Ul. Kościuszki To Ul. Szkolna). Design Unit: Design And Supervision Department Dro-Instal Mgr Inż. Kazimierz Strzelczyk, Ul. Świdnicka 24, 58-200 Dzierżoniów; G) Project Of Replacement Plantings For The Investment Under The Name: Reconstruction Of Ul. Szkolna And 11 November (From Kościuszki Street To Szkolna Street). Szkolna And November 11 From Ul. Kosciuszko To Ul. Szkolna Was Made By - Mgr Inż. Kazimierz Strzelczyk;I) Bill Of Quantities Constituting Auxiliary Material For Estimating The Offer Price Of The Contractor. Scope Of Works For Reconstruction Of Ul. Szkolna, Does Not Include The Construction Of 22 Parking Spaces And The Felling Of 4 Trees - In Accordance With Appendix No. 24.4. The Contractor Is Obliged To Perform The Scope Of Works Indicated In The Design Documentation, Including The Construction And Executive Design, Which Is Specified In The Form Of A Technical Description Or In The Drawings, Or Both In The Description And In The Drawings. Both The Technical Description And Drawings (Graphic Part) Of The Designs Are Equivalent And Describe The Subject Of The Order.5. The Contractor Is Obliged To Perform Construction Works In Accordance With The Construction Art And In Accordance With The Recommendations Of The Investors Supervision, The Documentation Listed In § 1 Section 3 Of The Draft Contract (Appendix No. 7 To Swz), Taking Into Account The Elimination Of Architectural Barriers For The Disabled. In Addition, The Contractor Is Obliged To Perform Accompanying Works Related To The Reconstruction Of The Above-Mentioned Streets And Their Connection With The Existing Neighboring Streets, Pavements, Buildings, Accesses To Buildings Stairs, Platforms, Etc. The Contractor Should Adapt And, If Necessary, Reconstruct All Access Roads, Access Roads, Stairs, Platforms, Etc. To The New Gradeline Of The Completed Road Surface, Sidewalks, Bicycle Path, Etc. With Proper Drainage Of Rainwater. In The Case Of Interference With Adjacent Objects Or Their Damage, Their Repair, Supplementation, Height Adjustment, Etc. Should Be Taken Into Account6. In Addition To The Above-Mentioned Obligations Under § 1 Of The Draft Contract (Appendix No. 10 To The Swz), The Contractor Undertakes To: 1) Take Over The Construction Site With A Protocol, Secure It And Properly Mark It, And Apply To Network Administrators For A Protocol Handover Of Equipment For The Duration Of The Works, And After Completion Of The Works, Handing Them Over To Their Owners By Protocol, As Well As Making The Construction Site Available To Network Administrators For Them To Carry Out Renovation Works On Their Resources, If Necessary, 2) Ensure Access And Access To Properties Located Within The Investment Area, Including Rescue Services, 3) Organization Of Construction Site Facilities And Social And Sanitary Rooms For Employees And Storage Of Materials, 4) Ensuring The Supply Of Utilities Necessary For The Execution Of Works And Payment For Their Delivery. The Contractor, On His Own, Provides The Necessary Media Necessary For The Proper Execution Of The Works, 5) Incurring All Costs Related To The Implementation, Supervision And Fulfillment Of All Obligations Arising From The Decision On The Building Permit / Lack Of Objection And Obligations Arising From The Obtained Agreements And Opinions And Those That The Contractor Is Obliged To Obtain During The Execution Of Construction Works,6) Carrying Out Tests, Tests And Measurements During The Performance Of Construction Works And Acceptance Tests In Accordance With The Technical Specification,7) Providing The Employer On The Day Of Signing The Contract With Statements On The Assumption Of Duties By The Site Manager And Works Managers,8 ) Cleaning The Surface Of The Adjacent Area And Streets On An Ongoing Basis In The Case Of Fertilizing Mud From The Construction Site On The Wheels Of Machines, Cars And Other Technical Devices, 9) Tidying Up The Construction Site And Restoring The Adjacent Area To Its Original State After Completion Of The Works, 10) Removing Demolition Material And Debris , Mass M Ineral-Bituminous Materials And Redundant Materials And Unnecessary Equipment For The Landfill And Incurring The Costs Of Their Storage And Disposal,11) Geodetic Services During The Implementation Of Construction Works, As Well As To Perform The As-Built Geodetic Measurement With The Title Page And Legend, And In Electronic Form On A Cd 12) Protection Of Geodetic Control Points, And In The Event Of Their Destruction Or Damage, Or The Need To Transfer The Order To An Authorized Geodetic Execution Unit To Restore Them Or Establish New Ones, 13) Submit Documents To The Employer Prior To Signing The Contract Resulting From The Tor, 14) Implement The Safety And Health Protection Plan, 15) Participation Of The Construction Manager And Industry Works Managers In Construction Councils Held At Least Once A Week, 16) Preparation Of Construction Settlements, Invoices On An Ongoing Basis, According To The Employers Recommendations, 17) Other Necessary Activities Required By Law And Related To The Implementation Of Subject Of The Order,18) Performing Coordination Functions In Relation To The Works Carried Out By Subcontractors,19) Fulfilling The Obligations Also On The Part Of The Investor (Commune) Resulting From The Arrangements, Permits And Decisions Contained In The Construction Design, As Well As Those That Will Be Issued In The Course Execution Of Works, 20) Providing, At The Request Of The Employer, Post-Demolition Materials Suitable For Re-Incorporation, E.G. A Stone Curb, Concrete Cubes, Stone From Demolition, Which The Contractor Should Clean, Stack On Pallets And Foil And Transport To A Place Indicated By The Employer At A Distance Of Up To 10 Km From The Construction Site. Similarly, Other Post-Demolition Elements, E.G. Lighting Fixtures, Etc. In The Event Of The Employers Resignation From Demolition Materials, The Contractor Will Take Them To A Landfill And Bear The Costs Of Their Storage And Disposal. A Detailed Description Of The Subject Of The Contract Is Included In The Tor.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8f3f04bc-c3cb-45fa-98d3-259a8094c9b0.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders