GTR 59137084
Tenders Are Invited For Hrsg 12/21 Hpsh 1 & 3 And Hrsg 72 Ev-Hp2 Tubes And Headersborescope Inspection
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
59137084
Tendering Authority
Subscribe to view
Tender No
2332300057
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Hrsg 12/21 Hpsh 1 & 3 And Hrsg 72 Ev-Hp2 Tubes And Headersborescope Inspection
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
13-01-2023
Closed
Work Detail
Quotation Are Invited For Hrsg 12/21 Hpsh 1 & 3 And Hrsg 72 Ev-Hp2 Tubes And Headersborescope Inspection. Technical And General Specification Of Borescope Inspection Work At M &M Extension Stn, Jebel Ali Power Station.1. Title: Hrsg 12/2 1 Hpsh 1 & 3 And Hrsg 72 Ev-Hp2 Tubes And Headersborescope Inspection.2. Quantity: One Inspection Cap Will Be Cut On Each Top & Bot Tomheaders By Dewa For Access. Maximum Number Of Accessible Tubes Andheaders Section Shall Be Inspected. Refer Below Location Detail S [Note:Quantity May Vary Based On Actual Requirement]S.No Location Header No. Cap Qty1 Hrsg 12/21 Sh-Hp1 Upper Header Hu 01 - 2 (Cap Qty)2Hrsg 12/21 Sh-Hp2 Upper Header Hu 03 - 2 (Cap Qty)3 Hrsg 72 Ev-Hp2 Upper & Lower Header Hu 11 - 2 (Cap Qty)3. Durati On: 01 Day Per Boiler & 3 Visits/Mobilization Required4. Scope Of Work:4.1. Mobilize Team/Equipment Within 02 Days Of Advance Noti Ce.4.2. Submit Following Documents To Obtain Ptw,4.2.1.Method Statement4.2.2. Risk Assessment Of The Work4.2.3. Toolbox Talk Re Port.4.3. Obtain Ptw (Permit To Work), Lc (Line Clearance) & Confine Spaceentry Permit From Dewa.4.4.Conduct Site Survey And Safe Ty Inspection, To Assess The Workingenvironment.4.5. Ensure Site Area Is Correctly Secured And Safe To Work On In Allrespects.4.6., ,If The Working Environment Is Safe, Proceed With The Borescopeinspection.4.7. Assess The Internal Conditions Of Tubes & Headers. A Rticulatingborescope Shall Be Used To Identify Any Scabbing, Pitting, Scale Buildup, Corrosion, Layer Formation, Overheating And Any Other Significantfindings. Maximum Number Of Accessible Tubes To Be Inspected On Eachheader.4.8. In Case Of Any Significant Inspec Tion Finding, Same Shall Bebrought To The Notice Of Dewa.4.9. Upon Work Completion, Detailed Inspection Report Shall Submit.Report Shall Include Header/Tube Identification Details, Photos, Videos,Findings, Recommendations And All Supporting Documents.4.10. Digit Al Copies Of The Photos, Videos, Inspection Findings Andreport Shall Submit Through Cloud/Cd4.11. Dewa Scope Is Only Scaffolding If Required5. Borescope Equipment Details:5.1. The Borescope Should Be Equipped With Articulation And High-Endindustrial Video Syste Ms With Proper Monitors. The Borescope Should Havethe Facility / Systems To Get Excellent Quality Image, Detailedinformation About A Non-Conformity Like Indications, Discolorations,Pitting, Scabbing, Scale Build Up And Oxygen Corrosion Etc. The Probeshould Be Wate R Proof, Flexible Which Should Turn Up To 360°, Suitableto Access To Headers & Tubes, Length Of Cable Should Be 30 M, Resultsrecorda Ble, Dual Or Extra Monitor, And High Quality Of Recording.6. General Terms & Conditions:6.1. The Contractor Shall Visit The Site A Nd Be Fully Familiar With Thework Scope, Plant Access, Material Requirement, Facilities,Complexities, Safety Measures Etc., Before S Ubmitting The Bid.6.2. The Contractor Shall Have The Previous Experience For Hrsg Tubes &Headers Borescope Inspection In Dewa Or Wi Th Well-Known Company In Uae.6.3. The Contractor Shall Submit The Schedule Of Work And The Periodfor Work So That The Work Shall Co Me Well Within The Allotted Outageperiod. The Schedule Shall Be Approved By Dewa Before Commencement Ofwork6.4. The Contractor Shal L Ensure Housekeeping On A Daily Basis And Thecontractor Shall Be Responsible For All Waste Material Disposals Todesignated Places A S Per Dewa Environmental Policy Of Hazardous Wastedisposal.6.5. All Dewa Safety & Environment Policy, Rules And Regulation Shallbe Followed At Work Site During The Execution Of The Work. Thecontractor#S Engineer Should Be Familiar With Safety Regulations Whilewor King In A Hazardous Area.6.6. The Work Shall Be Executed Under Dewa Supervision And As Perquality / Schedule Requirement. Contracto R#S Supervisor Shall Beavailable At Site Throughout The Period Of Work.6.7. The Contractor Should Apply For The Permit To Work Well In Advanceand This Request Shall Be Followed With Method Statement, Riskassessment As Attachments6.8. Entry Permits For The Staff/ Workers Should Be Applied Withpassport Copies Having Valid Visa. Persons, Whose Names Are Notavailable In The List, Will Not Be Allo Wed To Enter The Powerhouse6.9. The Contractor Upon Receiving The Work Permit Shall First Ensure Asafe Working Condition.6.10. Ent Ry Permits For The Vehicle Should Be Applied With Copies Ofvehicle Registration.6.11. All The Persons Should Wear The Uniform, Safe Ty Shoes And Helmetwhile At Work.6.12. All Material And Tools Brought In Shall Be Declared At Powerstation Security Gate And The Li St Of These Items Shall Be Signed Bydewa Security. The Copies Of These Documents Shall Be Lodged Withdewa Engineer In-Charge On Dail Y Basis. This Document Will Be The Basisfor The Clearance (Gate Pass) To Take Them Out On Completion Of The Job.6.13. Toolbox Talks And Risk Assessments Should Be Given To The Workmenby Their Supervisor Before Start Of Work.6.14. Dewa Engineer-In-Charge Shall Be Updated The Work Progress On Aregular Basis.6.15. Contractor Shall Comply The Sa 8000 Standard As Per Dewa Termsand Conditions.6.1 6. Safety Officer By The Contractor Is Required At Site.6.17. Eating, Resting And Sleeping Is Not Allowed In The Plant Site.7. Gu Ideline For Dewa Contractors Towards Covid 19 Pandemic7.1. Access To Japs For Contractors, Suppliers, Consultants Andvisitors Are A Llowed Only If,7.1.1. They Are Vaccinated And Vaccination Records Are Attached Alongwith Gate Pass Request.7.1.2. All Company Staf F Holding Dewa Gd Security Gate Pass Shall Bechecked At Accommodation And They On Board In Bus/Vehicle Is Free Fromcough, Sneezing & High Body Temperature Below 38.1.7.1.3. Contractor Shall Submit Undertaking Letter & Travel Declarationof All Staff As Per Prescri Bed Form.Anton Jacob &<)> M Extension Stn, Jebel Ali Powerst Ation. Anton Jacob
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
872fb60e-f698-46e2-8c79-28a3efb9311d.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.