GTR 57735707
Tenders Are Invited For Fabrication & Installation Of Pipeline And Providing Isolation Valves
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
57735707
Tendering Authority
Subscribe to view
Tender No
2332202588
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fabrication & Installation Of Pipeline And Providing Isolation Valves
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
28-11-2022
Closed
Work Detail
Quotation Are Invited For Fabrication & Installation Of Pipeline And Providing Isolation Valves Fabrication & Installation Of 1032204012Rfx Description Fabrication & Installation Of Pipeline And Providing Isolation Valves Along With Provision For Chemical Dosing Connection On Ph-Iii, Preservation Tank At E Station. Dewa Contact Person: Jassem Alali, [email protected], 0504225863. Or Gopal Tewari, [email protected], 0508806977. 1 Item-00001 Fabrication & Installation Of Pipeline And Providing Isolation Valves Along With Provision For Chemical Dosing Connection On Ph-Iii, Preservation Tank At E Station. Pipeline Including Valves, Elbows, Tees, Supports With Clamps Installation On Ph-Iii, Preservati On Tank At E Stn. To Improve & Enhance Further System Reliability For Operation. Fabrication To Be Done As Per Instructed Pipe Siz Es & Lengths Including Valve And All Mountings And Attachments. Details Are As Follows- 1. Pipe Ø1inch,Cs A106b,Length 20Meters.(App Roximate) 2. Pipe Ø2inch,Cs A106b,Length 24Meters.(Approximate) 3. Pipe Reducer Ø4x2inch,Bw,Cs, Qty. 02Nos. Approx. 4. Pipe Tees Ø2i Nch,Bw,Cs, Qty. 04Nos. Approx. 5. Elbow Ø1inch,Sw Or Bw,Cs, Qty.08Nos. 6. Elbow Ø2inch,Sw Or Bw,Cs, Qty.08Nos. 7. Pipe Clamps For Pi Pe Ø1 Or 2Inch, Qty.10Nos. 8. Valve Ø1inch,Sw Or Bw,Qty.04Nos. 9. Valve Ø2inch,Sw,Cs, Qty.04Nos. Supplier Scope:- # Transportation Will Be Arranged By Contractor For Manpower Mobilization. # Removal Of Old Existing Pipeline From The Location And Edge Preparat Ion As Per Joint Requirement. # Installation & Fitting Of New Pipeline & Valves At The Location. # Welding & Fixing At Position With Appropriate Welding Electrode. # Required Tools And Tackles (Argon Welding Set, Welding Machines, Beveling & Grinding Machines). # All Consumable#S Like Cutting, Grinding Disc, Cleaning Oil, Waste Cloth. Gas Cutting Set Welding Electrodes. # Carry Out Job At Dewa Jebel Ali Site. # No Welding Shall Be Carried Out Without The Approval Of Dewa Engineers Of The Fit-Up. # Misalignment Shall Be Checked Using A Scale Or Straightedge, Mis-Alignment Shall Be Less Than T/6 Where T Is The Thickness Of Pipe Wall. # Root G Ap/ Root Face Shall Be As Per Instructions. # Only Qualified Welders Shall Be So The All The Welding Including Tack Welding. # Wel Ding Shall Be Done In Accordance With The Qualified Welding Procedure. # Hot Work Permit Is Valid For One Day Only. Application For The Hot Work Should Be Submitted Daily Basis One Day Before The Work. # All The Workmen Should Wear The Uniform, Safety Shoes And Helmet While On Work. The Technicians Shall Bring With Them Their Personal Toolboxes. # The Contractor Shall At No Time Keep Inflammable Substances In The Plant/Areas. # The Warning Sign Boards Should Be Provided By The Contractor As #Work In Progress# #No Entry# Etc. At The Entry And Wherever Required. # The Contractor Should Barricade The Area Of Work Where Ever Required And Possible. # 06 Days Advance Notice Will Be Given Prior To Start The Job. # The Work Carried Out By Contractor Under This Contract Shall Carry A Warranty Of 1Year Against For Faulty/Poor Fabrication, Erection And Workmanship. # To Provide Documents For Staff Gate Pass. # Provide Welder#S Welding Qualification Certificate. # Provide Machine & Tools Test/Calibration Documents. # Provide Wel Der#S Welding Qualification Certificate. # The Scrap, Old Material And Wastes Shall Be Disposed From Site Under Direction Of Dewa Engineer. All Hazardous Waste Shall Be Moved With Written Approval To Dewa Special Storage Area. Dewa Scope:- # Staff Gate Pass Es # Line Clearance # Hot Work Permit # All Material Such As Pipes & Valve Assembly. # Fork Lift With Operator. # Scaffolding Erecti On & Removal Where Ever Required. # N.D.T. Dewa Contact Person Jassem Alali:0504225863 Or Gopal Tewari:0508806977 1 Job Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202588
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a71f8000-ab9b-4abe-b256-a5915cea917b.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.