GTR 57682310
Tenders are invited for Vacuum System Spare Butterfly Valves And Lp Steam Butterfly Valve Overhauling Work
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
57682310
Tendering Authority
Subscribe to view
Tender No
2332202577
Financer Name
Self-Funded
Work Title
Tenders are invited for Vacuum System Spare Butterfly Valves And Lp Steam Butterfly Valve Overhauling Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
24-11-2022
Closed
Work Detail
Quotation Are Invited For Vacuum System Spare Butterfly Valves And Lp Steam Butterfly Valve Overhauling Work. Overhauling Of Vacuum System Dn 250 Spare Vanessa Butterfly Spare Valves At K Station. Quantity: 3 Valves Scope Of Work Under This Pr Is To Overhaul The Valve With Replacement Of Damaged Parts Including Fasteners, Gaskets, Transportation If Any, Material Handlin G, Assembly Of Valve, Testing And Installation. Complete Works Associated With The Job Is In Contractors Scope. Job Completion Shal L Be Only After Successful Testing Of Valve. Supply Of Spares Including Seal Ring Will Be Under Vendor Scope. Dismantling: (1) Dis Mantling The Complete Valve And Gearbox. (2)Blasting And Chemically Clean The Complete Unit And Prepare Of Inspection (3) Inspection Of Valve Individual Parts After The Removal Of Disc/ Bearing/ Shaft / Gears. Weld Repair Of Body Seat Bore And Disc: 1. Pre- Mach Ine The Body Seat Bore And Disc 2. On Successful Pre- Machining Carry Out The Ndt Check And Make Sure Surface Is Free From Cracks And Other Defects 3. Submit The Wps And Pqr With Welder Qualification For Dewa Approval 4. Weld The Body And Wedge As Per Astm A315 Cn 7 M (Aisi 904L) Material Requirements 5. Carry Out The Final Machining On The Body And Disc As Per The Din Standard And Manufact Ure Recommendation 6. On Successful Completion Of Final Machining Carry Out The Ndt Check And Make Sure Surface Is Free From Any Def Ects Final Assembly And Testing: 1. Assembly The Unit As Per The Assembly Procedure 2. Carry Out The Testing Of The Valve # As Per Api 598 3. On Successful Completion Of Testing Prepare The Valve For Painting. Warranty - 1 Year Dewa Scope: Seal Ring Only. Comp Letion Time: 30 Days For More Details: James Kumar 0529126512 / 0508816578 [email protected] Contractor#S General Liabiliti Es For Job / Services At Dewa Japs 1.#Contractor#S General Responsibilities And Liabilities A.#Contractor Shall Provide Superviso Ry, Skilled, Semi-Skilled, Unskilled Work Force, All Required Equipment, Tools, Consumables Etc. Required To Carry Out To Complete T He Work Successfully. B.#Contractor Shall Provide All Personal Protective Equipment And First Aid Kit Available At All Times At Site During The Course Of Works. C.#Contractor Shall Provide The Most Appropriate Method Statement, Work Schedule And Risk Assessment An D Get Approval From Concerned Dewa Engineer/Deputy Manager Prior To Commencement Of Work. D.#The Contractor Shall Possess A Valid Third-Party Insurance And Workmen#S Compensation For All Works And Personnel Involved Until The Works Are Taken Over By The Company In Writing. Copies Of The Same To Be Submitted Along With Quotation. E.#The Contractor Shall Submit A Master Program Covering The Full Scope This Contract Prior To Commencement Of His Work. 2.#Site Pre-Requisites A.#The Contractor Shall Mandatorily Assign A Site Supervisor To Be Available During The Entire Period Of Work, To Coordinate With Dewa Engineer / Foreman For Daily Work Permits And Submission Of Daily Tool Box Talks. He Shall Ensure Completion Of Work As Per Standards And Requirement With Compliance To Dewa Safety And Security Procedures, Safety Of Plant And Personnel. B.#Contractor#S Supervisor Shall Mandatorily Report To Dewa Engineer / Fore Man Daily Before Starting The Job To Confirm Their Presence With The List Of Employees Deployed On The Day. In Case Of Multiple Jobs Being Performed At The Same Time, Supervisor Shall Confirm The Deployment Of Manpower On Each Job With Status Of The Same Daily Pri Or To Start Of Work. C.#Contractor#S Supervisor Shall Inform Dewa Engineer / Foreman, Prior To Leaving Site After Work On Daily Basi S. D.#The Presence Of Contractor#S Manpower Shall Be Restricted To The Working Areas Only. Qty: 3 Vacuum System Spare Butterfly Valves And Lp Steam Butterfly Valve Overhauling Work; K Stn Phase 1 Desal. Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202577
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2a739b7f-63ad-4945-ae50-7c380ff2c1c3.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.