GTR 56168459
Tenders are invited for E, Gt04, Ng-Ii Skid-7.1 & 7.2 Filter Vessel Door Replacement Work
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
56168459
Tendering Authority
Subscribe to view
Tender No
2332202175
Financer Name
Self-Funded
Work Title
Tenders are invited for E, Gt04, Ng-Ii Skid-7.1 & 7.2 Filter Vessel Door Replacement Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
13-10-2022
Closed
Work Detail
Quotation Are Invited For E, Gt04, Ng-Ii Skid-7.1 & 7.2 Filter Vessel Door Replacement Work. Scope Of Work For 24" Door Closure Replacement Work At E- Station In Jebel Ali Power Station Fabrication & Replacement Of 24 Inch Do Or Closure At E Stn. Gt#4, Ng-Ii Skid-7.1 & 7.2 Filter Vessel In E Station Due To Corrosion And Deep Pitting Causing Frequent Le Aks From The Door. This Is One To One Replacement Of Existing Ng Filter Vessel. Details Are As Follows- Vessel Door Size Ø24inch, S Chedule 40,Cs, Bw, Qty.02Nos. Contractor Scope: 1.# Site Survey & Spot Measurements (Upon Request) Of Pipes & All Attachments Is To Be Done By Suppliers. 2.# Mobilization Of Manpower As Per Job Schedule Provided By The Dewa Engineer. 3. Cutting & Removal O F Old Existing Door Placing On Designated Area. 4. Edge Preparation & Cleaning To Make Ready For Installation. 5. Fit-Up Of Do Or Assembly In Correct Position And Direction Prior To Welding. 6. Misalignment Between The New & Existing Door Shall Be Ch Ecked Thoroughly. 7. No Welding Shall Be Carried Out Without The Approval Of Dewa Engineers Of The Fit-Up. 8. Only Qualified/C Ertified Welders Shall Be Engaged For All The Welding Including Tack Welding. 9. Welding Shall Be Done In Accordance With The A Pproved Specified Welding Procedure. 10. All Machines (Cutting, Grinding & Welding Etc) To Be Arranged By Contractor With Va Lid Testing & Calibration Certificates From 3Rd Party Licensed Certifying Agencies. 11. Consumable Like Electrodes, Grinding And Cutting Discs Required For Cutting And Installation. 12. In General All Items Of Tools, Accessories, Consumable, Hoses, Cab Les, Distribution Board Etc. Other Than Facilities Provided By Dewa Shall Be Arranged By The Contractor. 13. All Rigging Tools ( Belts, Shillings And D-Shackles) To Be Tested & Arranged By Contractor. 14. Inspection To Be Done By Dewa Engineer At All The S Tages Any Time. 15. The Contractor Should Apply For Work To Permit In The Prescribed Format In Advance Before Commencing The Work. 16. Entry Pass For The Workmen Should Be Applied With Valid Work Visa, Passport And Emirates Id Card Copies For Each In Advance. 17. The Contractor Should Provide All The Safety Equipment & Ppe For Their Technicians. 18. Toolbox Talks Should Be Given By The Contractor Before The Start Of Every Day Work By Supervisor And The Copy Should Be Submitted To Dewa Staff. 19. Risk Assessment Will Be Prepared And Submitted To Dewa Engineer. 20. The Contractor Should Work As Per Schedule Provided By The Dewa Engineer And Complete The Job As Per Schedule. Dewa Is Not Responsible For Any Sudden Change In Shut Down Schedule Due To Urgent Requirement Of Equipment. 21. Job Completion Certificate To Be Submitted To Dewa Engineer. 22. De-Mobilization Of Man Power And Equipment After Completion Of Job. 23. Contractor Must Have Provide Previous Experience For The Similar Job, List To Be Provided Along With The Bid. 24. Job Need To Initiate 03 Times Mobilization One By One As Per Unit Shutdown Schedule. 25. Contractor Need To Comply With All Dewa Policy Rules & Regulations. 26. No Office Space Will Be Provided By Dewa. On Application With Relevant Particulars Will Provide Suitable Place To Keep Tool Boxes. 27. Supplier Has To Bring Their Own Arrangement. 28. The Work Carried Out By Contractor Under This Contract Shall Carry A Warranty Of 2Years Against Defective Coating Materi Als & Painting, And Two Years For Faulty/Poor Fabrication, Erection And Workmanship. Housekeeping: 1. At All Times During Execu Tion Of This Contract, The Area Of Work Shall Be Kept Neat, Clean And Tidy. On Completion Of The Job, The Place Of Work Shall Be Cl Eaned To The Satisfaction Of Dewa. 2. The Scrap, Old Material And Wastes Shall Be Disposed From Site Under Direction Of Dewa Enginee R. All Hazardous Waste Shall Be Moved With Written Approval To Dewa Special Storage Area. Dewa Scope: 1.# There Will Be One Dewa En Gineer For Contractor Liaison And Will Support For Technical And Non-Technical Security, A Registration & Management Issues. 2.# Dew A Engineers Shall Be Contacted At Any Time In Office Hours (07:30 ~ 15:30) For Any Queries And Doubts Incase Of Urgent Any Time Beyo Nd Office Hours Even During Holidays And Off-Days. 3.# Required New Valves Shall Be Provided By Dewa For Fabrication And Installatio N. 4. Coordination With Other Department And Seeking Line Clearance. 5. Scaffoldings As Per Requirement. 6. Water, Electr Icity And Compressed Air. 7. Crane/Forklift With Operator Shall Be Provided By Dewa As Required For The Work. These Requireme Nts Shall Be Properly Planned And Requested For One Day In Advance In Writing. However, Any Delay In Providing These Facil Ities Due To Failure To Apply In Time Or Due To Short Period (Few Hours) Shall Not Be Reasons For Delay In Execution. 8. All The Butt Weld Joints Ndt (Radiography, Dp Or Stress Reliving) Will Be Carried Out (Dewa Will Arrange). 9. Dewa Contact P Erson Gopal Tewari:0508806977, Email [email protected] Qty: 1 E, Gt04, Ng-Ii Skid-7.1 <(>&<)> 7.2 Filter Vessel Door Replacement Work. Dewa Contact Person Gopal Tewari:0508806977, E-Mail:Gopa [email protected] Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202175
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8bfae56c-4e72-4e06-be4a-1f178c8379de.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.