GTR 54648987
Tenders Are Invited For Presentation Secondary School Thurles Sports Hall Boiler Upgrade Emergency Works
ICB — International Competitive Bid
Closed
Northern Europe
Tender Information
GTR Reference
54648987
Tendering Authority
Subscribe to view
Tender No
2240 Presentation Thurles Boiler
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Presentation Secondary School Thurles Sports Hall Boiler Upgrade Emergency Works
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern Europe
Political Region
European Union
Last Date of Bid Submission
09-09-2022
Closed
Work Detail
The Sports Hall Boiler upgrade scope of the works includes the following:- a) De-commission, isolate, drain down, remove and dispose of the redundant oil fired boiler and associated services including the oil storage tank and any remaining heating oil to a licenced waste recycling facility. b) Isolate, drain down, remove and dispose of the defective direct oil fired water heater and associated services c) Isolate, drain down, remove and dispose of the redundant water softener system. d) Convert the heating system fuel supply to LPG as the fuel source, construction of a new bulk LPG gas tank storage compound and connection of the new gas service to the boiler room. e) Supply and installation of new gas fired condensing boilers in cascade arrangement, flue system and gas safety systems. f) Connect the new gas fired condensing boilers to the existing low loss headers and distribution system via new combi air dirt separators. g) Supply and installation of the new indirect hot water cylinder with an integral high recovery multi coil heat exchanger and connect a new constant temperature pump circuit to the spare tap offs available on the existing flow and return headers. h) Flush the heating distribution system and fill with a mixture of water and corrosion inhibitor to prevent future corrosion in the system. i) Complete upgrade alterations to the existing control panel to replace the obsolete Cylon controllers and as required to control and serve the new gas fired boilers and constant temperature DHW Calorifier unit and primary pumps. j) All associated electrical works including isolations, disconnections and strip out and new power and controls cabling run in galvanised steel containment systems to serve the new boiler and DHW Calorifier heating system k) All associated builders work including removal of the boiler and clean out of the boiler room and repainting, removal of the oil tank and demolition of the oil tank support walls and bund walls and reinstate the gras
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
532a16f9-d1dd-4669-ab2b-86c93ebce078.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.