GTR 54632834
Request for Proposal for AUG22 CENTRAL TURBINE MAJOR-GENERATOR MAINTENANCE UCDH
ICB — International Competitive Bid
Closed
Northern America
Tender Information
GTR Reference
54632834
Tendering Authority
Subscribe to view
Tender No
RFP # 002907
Financer Name
Self-Funded
Work Title
Request for Proposal for AUG22 CENTRAL TURBINE MAJOR-GENERATOR MAINTENANCE UCDH
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia Pacific Economic Cooperation APEC,APAC Asia Pacific
Last Date of Bid Submission
07-09-2022
Closed
Work Detail
AUG22 CENTRAL TURBINE MAJOR-GENERATOR MAINTENANCE UCDH Steam Turbine: - OEM: Murray - Serial Number: 5383 - Rated Steam Pressure/Temperature at Throttle: 400 PSI / 600 Deg F - Rated Back Pressure at Exhaust: 14 PSI - KW: 4,000 - Rated Turbine Operating Speed: 5987 RPM Steam Turbine Generator: - OEM: Ideal - Frame: 21120-36 - Serial Number: 951041-01 - KW: 4,100 - KVA: 5125 - Volts: 12.47 KVA - RPM: 1800 - Amps: 237 - PF: 0.80 - Exciter Frame: BF-13-4 - Exciter Volts: 125 - Exciter Amps: 168 Gas Turbine Generator: - OEM: BRUSH - Frame: BDAX 7-167ESS - Serial Number: 62174A-1G - Output: 32,941 KVA - RPM: 3600 - Volts: 13.8 KV (Operated at 12.47 KV) - Amps: 1378 - PF: 0.85 - Exc Volts: 165 - Exc Amps: 434 Specifications within this scope are intended to be a supplement to the standard practices of the vendor and provide clarity without omission for bidding purposes. The selected vendor or vendors will be provided access to the Operation & Maintenance Manuals replated to the equipment specified above. III STATEMENT OF WORK AND REQUIREMENTS Section A – Steam Turbine Major Inspection (ST Major) Pre-outage • Verify Running Condition • Record full set of vibration readings • Record full set of temperature and pressure readings • Inventory spare parts and special tooling • Provide updated schedule. • Attend a pre-outage meeting to review scope, schedule, manpower, and parts Steam Turbine • Remove insulation and coupling guards. • Instrumentation to be removed by UCDMC. • Record as found laser alignment: Turbine to Gearbox, Gearbox to Generator • Remove couplings. • Record coupling spacing on all couplings • Record thrust readings • Remove upper turbine case • Record run outs • Record rotor position, axial, and radial readings on interstage • Remove governor • Disassemble bearings • Disassemble packing cases • Rig and remove rotor • Rig and remove diaphragms • Remove interstage seals • Sand blast Rotor and Diaphragms with Aluminum oxide 220 (Offsite) • Perform Non-Destructive Testing (NDT) on rotor, diaphragms, and UT bearings • Check rotor run outs and record • Check rotor balance • Disassemble and check three pocket valves and actuators (Automatic Hand Valves) • Clean and inspect all removed and exposed parts • Clean and inspect horizontal joint and diaphragm fits • Clean and inspect bearing housings, bearings, and seal fits • Check and record bearing dimensions • Clean and inspect oil seals • Clean and inspect Gland Seal Housings and Seals, High Pressure and Low Pressure
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
18b708d3-658a-4523-aba9-9b0f2d5b5404.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.