Supply, Installation, Test and Commissioning, Electrical Installation & Dewa DP Complex

Tender Detail

54053149
2332201618
Self-Funded
Supply, Installation, Test and Commissioning, Electrical Installation & Dewa DP Complex
ICB
Western Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
11-08-2022

Work Detail

Quotation are invited for Supply, Installation, Test and Commissioning, Electrical Installation & Dewa DP Complex Supply Installation 1032202618rfx Description Supply Installation 1 ITEM-00001 SUPPLY, INSTALLATION, TEST AND COMMISSIONING, ELECTRICAL INSTALLATION & DEWA DP COMPLEX #THE PARTIES SHOULD VISIT THE SITES, CHECK THE REQUIREMENT, AND QUOTE ACCORDINGLY. #THE SUPPLIER#S QUOTE SHALL INCLUDE THE SUPPLY OF MATERIAL, INSTALLATION, COMMISSIONING APP ROVAL FROM DEWA (CSD), LABOUR COST, CONSUMABLES ETC. #SUPPLY, INSTALL TEST AND COMMISSION THE COMPLETE INSTALLATION OF NEW SMDB (70 KW), AND CABLING WORK. #STRICTLY BY THE SPECIFICATION AND AS PER DEWA REGULATION. ALL DRAWING /WIRING TO THE APPROVAL OF DEWA-CSD. #ALL INSTALLATIONS ARE TO BE CHECKED AND CERTIFIED BY DEWA. #ALLOW FOR ALL ASSOCIATED WORKS MDB MODIFICATION WITH OBTAINING APPRO VAL FROM DEWA CSD. ALL REQUIRED APPROVALS (APPLICATION, ONLINE FORM, REGISTERED CONTRACTOR, APPROVED ELECTRICAL CONTRACTOR) ETC. #T HE SCOPE OF WORK INCLUDES PREPARATION OF DRAWINGS, OBTAINING OF DEWA-CSD APPROVAL, SUPPLY, INSTALLATION, TESTI NG OF MCCB, MODIFICATION OF BUS BAR IN THE MDB, ETC# INCLUDING LABOUR, AND CONSUMABLES. #THE VENDOR IS TO TAKE THE ACTUAL MEASUREME NT OF THE CABLES AT THE SITE FROM THE MDB TO DESIRED SMDB. #MATERIAL SUBMITTAL, METHOD STATEMENT, RISK ASSESSMENT, AND SHOP DRAWING S APPROVAL TO BE OBTAINED FROM DEWA ENGINEER # ALL THE INSTALLATIONS SHALL COMPLY WITH DEWA REGULATIONS. # PANEL BUILDER FOR MODIF ICATION WORKS SHALL BE ONE OF THE AUTHORIZED COMPANIES BY THE MANUFACTURER. # MCCBS SHALL BE SIMILAR TO THE EXISTING ONES. #THE PO SITION OF THE NEW SMDB SHALL BE DETERMINED ON-SITE WITH THE APPROVAL OF THE DEWA ENGINEER. #THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRENCHING EXCAVATIONS AND REQUIRED CABLE TRAY MODIFICATION AND INSTALLATION (CIVIL WORKS INCLUDED). #CONTRACTOR WHO UNDERTAKES ELECTRICAL INSTALLATIONS IS REQUIRED TO HAVE AT LEAST ONE ELECTRICAL ENGINEER/ELECTRICIAN WHO HOLDS A VALID COMPETENCY LICENSE ISSU ED BY DEWA AND IS RESPONSIBLE FOR CORRECT INSTALLATION AND SHALL SUPERVISE AND TEST THE ENTIRE ELECTRICAL WORKS. THE COMPETENCY LICE NSE WILL BE ISSUED BY DEWA ONLY TO THOSE INDIVIDUALS, WHO FULFIL THE REQUIREMENTS SET FORTH BY DEWA AND CAN UNDERSTAND AND APPLY DEW A'S REGULATIONS. #ALL ELECTRICAL INSTALLATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE REGULATIONS. RELEVANT DEWA'S TECHNICAL SPE CIFICATIONS, THE LATEST EDITION OF THE IEE WIRING REGULATIONS, AND ANY OTHER REGULATIONS ISSUED BY DEWA FROM TIME TO TIME. #THE SUP PLY SHALL INCLUDE ALL THE EQUIPMENT, ACCESSORIES AND OTHER MATERIALS NOT ENUMERATED IN THESE SPECIFICATIONS BUT FOUND NECESSARY FOR THE COMPLETION AND PERFECT FUNCTIONING OF THE INSTALLATIONS #INSTALLATION OF THE EARTHING SYSTEM AS PER DEWA REGULATION AND CSD APP ROVAL. #SUBMIT DRAWING FOR APPROVAL. #SUBMIT MATERIALS FOR APPROVAL. ONLY MATERIALS OF THE HIGHEST QUALITY SHALL BE USED AND ALL M ATERIALS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. (ABB, DUB, SIEMENS EUROPE, JAPAN, USA BRANDS ONLY) #ALL THE MATERIAL, IN GENERAL, WILL CONFIRM AS PER THE LATEST STANDARDS AND SHALL BE SUBMITTED TO DEWA FOR ENGINEERS# APPROVAL GUARANTEES #CONTRACTOR SH ALL PROVIDE A WRITTEN UNDERTAKING TO WARRANTY THE PERFORMANCE OF THE MATERIALS AS FOLLOWS: #A WRITTEN WARRANTY FOR ONE YEAR#S SITE REPLACEMENT MATERIAL, WORKMANSHIP AND FINISH. ON-SITE, REPLACEMENT INCLUDES REMOVAL AND TRANSPORTATION TO THE SITE OF NEW MATERIALS AND INSTALLATION. DELIVERY TIME 2 WEEKS GENERAL CONDITIONS #THE CONTRACTOR AT DEWA WORK PREMISES SHALL FOLLOW DEWA SAFETY & ENVIRONMENT POLICY, RULES AND REGULATIONS DURING THE CONTRACT PERIOD. #THE CONTRACTOR SHALL CARRY OUT A RISK ASSESSMENT FOR ALL HIS WORKS. THIS RISK ASSESSMENT SHALL BE FROM SAFETY AS WELL AS OCCUPATIONAL HEALTH CONSIDERATIONS. (DEWA FORMAT TO BE USED). #TOOL BOX TALKS SHOULD BE GIVEN TO THE WORKERS BY THEIR SUPERVISOR, A COPY OF WHICH SHALL BE GIVEN TO DEWA. #NO WELDING, FLAME HEATING OR CUTTING, GRINDING, PNEUMATIC CHIPPING, ETC. SHALL BE CARRIED OUT WITHOUT SPECIFIC CLEARANCE FROM DEWA THROUGH HOT WORK PERMITS. THE HOT WORK PERMIT IF REQUIRED SHALL BE OBTAINED ON DAILY BASIS. #THE CONTRACTOR SHALL AT NO TIME KEEP INFLAMMABLE SUBSTANCES IN T HE PLANT/WORK AREAS. #ALL HAZARDOUS WASTES SHALL BE MOVED UNDER DIRECTION FROM AND WITH WRITTEN APPROVAL TO DEWA SPECIAL STORAGE AR EA. #THE CONTRACTOR#S WORK WILL FALL WITHIN THE PURVIEW OF SAFETY SURVEYS CONDUCTED REGULARLY BY THE DEWA SAFETY SECTION. ALL THE W ORKMEN SHOULD WEAR NECESSARY PPES LIKE UNIFORMS, SAFETY SHOES AND HELMETS WHILE AT WORK. #ALL CONTRACTOR CRANES, VEHICLES, AND SPE CIAL TOOLS SHALL BE INSPECTED AND TESTED BY CAPABLE AUTHORITIES. THE CONTRACTOR SHALL PROVIDE DEWA WITH A COPY OF CERTIFICATES OF TH EIR FITNESS BEFORE THEIR USE AT THE SITE. #THE CONTRACTOR SHALL PRODUCE ALL EQUIPMENT LIKE RIGGING TOOLS, GRINDING MACHINES, DRILLI NG MACHINES, HAND TOOLS, AND PRECISION TOOLS WITH ALL VALID TEST CERTIFICATES FROM 3RD PARTY LICENSED CERTIFYING AGENCIES. #ERECTIO N & USE OF SCAFFOLDING, AND USE OF LIFTING TROLLEYS SHALL BE CERTIFIED BY DEWA AUTHORIZED PERSONNEL AND SHALL BE SUPERVISED BY THE C ONTRACT SUPERVISOR BEFORE EXECUTING THE JOB ON SITE. #ON A WRITTEN APPLICATION WITH RELEVANT PARTICULARS OF THE STAFF AND VEHICLES OF THE CONTRACTOR, DEWA WILL ISSUE TEMPORARY ENTRY PASSES FOR THEM VALID UP TO THE PERIOD OF CONTRACT WORK. THE CONTRACTOR SHALL APP LY FOR THE ENTRY PASSES FOR THE ENTIRE DURATION OF THE CONTRACT 3 DAYS IN ADVANCE WITH A XEROX COPY OF THE PASSPORT WITH A VALID VIS A, 2 PASSPORT SIZE PHOTOGRAPHS AND AN IDENTIFICATION CARD ISSUED BY THE COMPANY FOR EACH STAFF, ADDITIONALLY WITH A COPY OF THE DRIV ING LICENSE FOR THE DRIVERS AND A COPY OF VALID REGISTRATION CERTIFICATE FOR THE VEHICLES. #NO STAFF OR VEHICLES OF THE CONTRACTOR WILL BE PERMITTED TO STAY ON DEWA PREMISES AFTER THE CLOSING OF WORK OF THE DAY. PAYMENT 100 % ON SATISFACTORY COMPLETION OF WORKS. CONTACT PERSON FOR SITE VISITS FOR FURTHER CLARIFICATIONS PLEASE CO-ORDINATE ON THE BELOW-GIVEN NUMBERS FROM SUNDAY TO THURSDAY 7:30 AM TO 2:30 PM. 1.#MR ARIF 0551961349 2.#MRMR. THOMAS 0503014789 2 ITEM-00001 SUPPLY AND INSTALLATION TESTING OF SMDB DEWA APPROVED # 1 JOB 3 ITEM-00001 SUPPLY, AND INSTALLATION TESTING DEWA 1 JOB APPROVED CABLE CU/XLPE/SWA/LSF + ECC, CU/LSF CABLE FROM MDB TO SMDB INCLUDING CABLE TERMINAT ION # 1 JOB STANDARD TERMS & CONDITIONS 1) Prices should be 'DDP' delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is '30 days credit' from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Tender Link : https://www.dewa.gov.ae/api/RfxDownload/2332201618

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail