GTR 53775817
Tenders Are Invited For Fabrication & Installation Of Service Air Pipeline & Valves
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
53775817
Tendering Authority
Subscribe to view
Tender No
2332201559
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fabrication & Installation Of Service Air Pipeline & Valves
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
03-08-2022
Closed
Work Detail
Quotation Are Invited For Fabrication & Installation Of Service Air Pipeline & Valves For E Stn. Fabrication & In 1032202526 For #E# Stn. Fabrication & Installation Of Service Air Pipeline & Valves. To Provide Sufficient Air Supply From Pre-Existing Air Supply Line To Provide A Supply Point For Chemical Blending Process Ph-I Deaerator. Dewa Contact Person Jassem Alali:0504225863, E-Mail [email protected] 1 Item-00001 Scope Of Work For Fabrication & Installation Of Service Air Pipeline & Valves. To Provide Sufficient Air Supply From Pre-Existing Su Pply Line To Nearest Air Supply Point For Diaphragm Pump To Transfer Chemical In Blending Process In E Station Ph-I Deaerator. Detai Ls Are As Follows- A. Pipe Ø1inch, Schedule 80, Cs, Qty.30 Meter. B. Elbow 90Deg. Ø1inch, Sw, Cs, Qty.08Nos. C. Socket, Ø1inch, Sw, Cs, Qty.04Nos. D. Ball Valve, Ø1inch, Sw, A105, Qty.03Nos. E. Equal Tee Sw, Qty.03Nos. F. Angle 50Mm X 50Mm, Qty.06Points. G. U-Clam P Size 1Inch, Qty.06Points. Contractor Scope: 1. Site Survey & Spot Measurements (Upon Request) Of Valve & All Attachments Is To Be Done By Suppliers. 2. Mobilization Of Manpower As Per Job Schedule Provided By The Dewa Engineer. 3. Removal & Re-Fixing On T He Valve Portion As Required For Fabrication & Installation. 4. Cutting & Removal Of Old Existing Valves And Placing On Desig Nated Area. 5. Edge Preparation & Cleaning To Make Ready For Installation. 6. Fit-Up Of Pipeline Including Valve In Correct Positi On And Direction Prior To Welding. 7. Misalignment Between The New Valve & Existing Pipe Shall Be Checked Thoroughly. 8. N O Welding Shall Be Carried Out Without The Approval Of Dewa Engineers Of The Fit-Up. 9. Only Qualified/Certified Welders Shall Be Engaged For All The Welding Including Tack Welding. 10. Welding Shall Be Done In Accordance With The Approved Specified W Elding Procedure. 11. All Machines (Cutting, Grinding & Welding Etc.) To Be Arranged By Contractor With Valid Testing & Calibrat Ion Certificates From 3Rd Party Licensed Certifying Agencies. 12. Consumable Like Electrodes, Grinding And Cutting Discsreq Uired For Cutting And Installation. 13. In General All Items Of Tools, Accessories, Consumable, Hoses, Cables, Distribution Boar D Etc. Other Than Facilities Provided By Dewa Shall Be Arranged By The Contractor. 14. All Rigging Tools (Belts, Shillings And D-Shackles) To Be Tested & Certified Arranged By Contractor. 15. Inspection To Be Done By Dewa Engineer At All The Stages Any Time. 16. The Contractor Should Apply For Permit To Work In The Prescribed Format In Advance Before Commencing The Work. 17. E Ntry Pass For The Workmen Should Be Applied With Valid Work Visa, Passport And Eid Card Copies For Each In Advance. 18. The Cont Ractor Should Provide All The Safety Equipment & Ppe For Their Technicians. 19 Toolbox Talks Should Be Given By The Contractor Before The Start Of Every Day Work By Supervisor And The Copy Should Be Submitted To Dewa Staff. 20. Risk Assessment Will Be Prepared And Submitted To Dewa Engineer. 21. The Contractor Should Work As Per Schedule Provided By The Dewa Engineer And C Omplete The Job As Per Schedule. 22. Job Completion Certificate To Be Submitted To Dewa Engineer. 23. De-Mobilization Of Manpower An D Equipment After Completion Of Job. 24. Contractor Must Have Provide Previous Experience For The Similar Job, List To Be Pr Ovided Along With The Bid. 25. Job Need To Initiate Within 02 Working Days As Per Shutdown Schedule. 26. Contractor Need To Comp Ly With All Dewa Safety Policy Rules & Regulations. 27. No Office Space Will Be Provided By Dewa. On Application With Releva Nt Particulars Will Provide Suitable Place To Keep Tool Boxes. 28. Supplier Has To Bring Their Own Arrangement. Safety: 1.#All Dewa Safety & Environment Policy, Rules And Regulations Shall Be Followed At Work Site During The Contract Period. The Contractor#S Work Will Fall Within The Preview Of Safety Surveys Conducted Regularly By The Dewa Safety Section. All Their Safety Requirements Sh All Be Promptly Met. 2. All The Persons Should Wear The Uniform, Ppe While At Work, Indicating The Organizations Logo And Company Na Me. Warranty Period: 1. The Work Carried Out By Contractor Under This Contract Shall Carry A Warranty Of 06Months Against Defective Coating Materials & Painting, And Two Years For Faulty/Poor Fabrication, Erection And Workmanship. 2. In Case Of Any Damage/Deterio Ration Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necess Ary Repair Work. Housekeeping: 1. At All Times During Execution Of This Contract, The Area Of Work Shall Be Kept Neat, Clean And Ti Dy. On Completion Of The Job, The Place Of Work Shall Be Cleaned To The Satisfaction Of Dewa. 2. The Scrap, Old Material And Wastes Shall Be Disposed From Site Under Direction Of Dewa Engineer. All Hazardous Waste Shall Be Moved With Written Approval To Dewa Spec Ial Storage Area. Dewa Scope: Staff Gate Passes 1.#Line Clearance 2.#Hot Work Permit 3.#All Material. 4.#Scaffolding Erection, Rem Oval Where Ever Required. 5.#N.D.T. Dewa Contact Person Jassem Alali: 0504225863 Email: [email protected] Or Gopal Tewari:05 08806977, Email: [email protected] Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332201559
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5475c59a-090f-4d7d-8b73-2b4880b009a8.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.