GTR 53492454

Tenders are invited for Establishment Of Mayors Office Customer Service

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
53492454
Tendering Authority
Subscribe to view
Tender No
EKR000782452022
Financer Name
Self-Funded
Work Title
Tenders are invited for Establishment Of Mayors Office Customer Service
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
01-08-2022 Closed
Work Detail
Establishment Of Mayors Office Customer Service The Purpose Of This Public Procurement Procedure Is To Establish The Customer Service Of The Jvö Mayors Office Within The Framework Of A Business Contract. The Customer Office To Be Created For The Józsefváros Customer Service And Family Support Office Will Be Renovated With Interior Design, Architectural, Fire Protection, Mechanical And Electrical Works On A Total Floor Area Of ​​525 M2, At The Site Of The Existing Customer Service. Furniture Is Subject To Separate Purchase. Customer Service Must Be Made Accessible. The Floor Level Of The Ground Floor Room Does Not Currently Form A Level, So It Is Necessary To Create Several Small Ramps With Handrails. A Barrier-Free Toilet With Handrails And An Emergency Alarm Must Also Be Built. No Static Task Was Planned During The Primarily Interior Architectural Transformation. The New Plasterboard Walls Must Be Made With Ua Rib Reinforcement Around The Doors And Windows According To The System. A Hidden Steel Frame Must Be Built For The Glass Wall, And Additional Ua Ribs Are Also Required Behind The Fixing Of The Furniture And Sanitary Ware. Electric Boilers Must Be Installed To Supply Hot Water To Water Blocks And Kitchens. The Water Pipe System Must Be Constructed In Such A Way That Certain Sections Can Be Disconnected And The System Can Be Emptied. The Recommended Slope Of Water Pipes Is 0.2%. The Cold Water Pipes Must Be Provided With A Non-Drip Burning Insulating Layer That Protects Against Condensation. Domestic Hot Water Pipes Must Also Be Provided With Thermal Insulation That Burns Without Dripping. A Pressure Test Must Be Performed On The Equipment With The Pressure And Time Specified By The Standard. A Water Sample Must Be Taken From The Completed Network And It Must Be Inspected By The Competent Authority. The Record Of The Successful Water Sample Must Be Handed Over To The Bidder Together With The Record Of The Successful Pressure Test. The Buildings Sewer System Must Be Connected At The Existing Points. A Tightness Test Must Be Held On The Completed Pipe Network. The Existing Rainwater Networks Are Not Affected By This Investment. The Existing Gas Boiler-Operated Radiator Heating System Of The Rooms Has Not Been Redesigned, It Must Be Kept And Protected During Construction. Additional Cooling And Heating Air Conditioners Must Be Installed In Two Rooms, And Two Split Air Conditioners In The Server Room. For The Comfort Spaces, An Air-Conditioning System In The Amount Of 2,000 M3/H Must Be Installed According To The Attached Plans. It Follows From The Equipment Of The Building That We Took The Dimensioning Power Of 29.19Kva (3X40a) As A Basis. The Distribution Cabinet Of The Electrical Consumers Of The Ground Floor And Mechanical Equipment Must Be Fed From The Main Distribution Cabinet. The Lighting System Must Be Designed In Accordance With The Interior Designer. Luminaires To Be Installed In Rooms With A Larger Floor Area Must Be Able To Be Switched In Several Steps. Customer Service Must Be Provided With Security Lighting, As Well As Security Lighting For Exit Routes. In Addition To Individual Needs, 1 Socket Outlet Must Be Built For Electricity Consumers In Each Locality. The Power Transmission Network Must Be Designed Taking Building Engineering Requirements Into Account. The Ventilation Of Rooms Without Windows, Bathrooms And Toilets Must Be Installed In The Central Ventilation Machine. The Wires And Protective Pipes Must Be Installed Hidden And Recessed Everywhere. For Recessed Installation, Mü-Iii. Mü-I, Installed In A Sleeve For Mounting A Thin-Walled Plastic Protective Pipe With The Mark Mü-I. Thick-Walled Plastic Pipe Marked Depending On The Design Of The Ceiling In The Building, The Backbone Cables Must Be Routed In A Protective Tube Above The False Ceiling Or In A Wall Groove In Partitions. The Telecommunications Center Of The Building Must Be Set Up In The Rack Cabinet In The P21 Storage Room. The Amount And Type Of Patch Panel Corresponding To The Structured Network Endpoints Must Be Installed In The Rack Cabinets, Which Receive The Wall Cables Coming From The Corresponding Endpoint. In The Part Of The Building, An Electronic Intrusion Protection System Must Be Installed To Protect Valuables, Equipment And Tools During Construction. In Order To Protect The Customer Service, A Camera Surveillance System Must Be Installed. According To The Relevant Regulations, Accessible Toilets In Public Buildings Must Be Equipped With An Emergency Call Device. A Customer Call System Must Be Installed In The Building. Reserve Amount: 5% Of The Net Contractor Fee. Detailed Requirements And Quantities Related To Performance Are Contained In The Technical Documentation And The Draft Contract. 45000000-7
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1ef7bf8f-5818-45fe-9a6d-9df9b4e7a965.htm
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders