GTR 53231890

Tenders Are Invited For Replacement And Refurbishment Of Diverter Damper Hydraulic Cylinder

ICB — International Competitive Bid Closed Western Asia
Tender Information
GTR Reference
53231890
Tendering Authority
Subscribe to view
Tender No
2332201407
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Replacement And Refurbishment Of Diverter Damper Hydraulic Cylinder
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
19-07-2022 Closed
Work Detail
Quotation Are Invited For Replacement And Refurbishment Of Diverter Damper Hydraulic Cylinder Replacement And Refurbishment 1032202270Rfx Description Replacement And Refurbishment Of Diverter Damper Hydraulic Cylinder, 1 Item-00001 Technical And General Specification Of Outsourcing Work L-2 Station, Jebel Ali Power Station Title: ·# Refurbishment Of Diverter D Amper Hydraulic Cylinder, Piston Dia 200Mm X Rod Dia 140Mm, Stroke Length 1620 Mm., Qty 1 Nos. Scope Of Work: ·#Hrsg 82 - 1 No P Eriod Of Work: ·#Replacement :1 Days / Unit ·#Refurbished : 4 Days / Cylinder Scope Of Work For Diverter Damper Cylinder Refurbis Hment: ·#Collection And Transportation Of The Cylinders From Dewa L-2 Station To Contractor Workshop. Note: Hydraulic Hoses Connect Ed To Cylinders To Be Covered Properly During Transportation Of The Cylinder After Removal Of Cylinders. ·#Dismantling, Cleaning, In Spection Of Hydraulic Cylinder Components. ·#Inform Dewa For Any Damage Noticed. ·#Polishing/Honing Of Cylinder Piston. ·#Chroming Of Piston Rod/Tube. ( If Required) ·#Seals Replacement. (Consumable Supplied By Dewa) ·#Assembling Of Cylinder Using Seal Kit Supplie D By Dewa ·#Testing Of Cylinder In Presence Of Dewa Representative. ·#Test Procedure To Be Provided, At 250 Bar. The Acceptance Crit Eria For The Pressure Drop Should Be Less Than 2 Bar Within 10 Minutes. Digital Graph Recorder To Be Used During The Test ·#Punching The Unique Number On The Cylinder And Mention The Same Unique Number In The Report. ·#Providing Test Certificate With One-Year Warr Anty. ·#Delivery Back To Dewa L-2 Store Within 2 Days Dewa Scope: ·#Scaffolding ·#Fork Lift ·#Crane Warranty : ·#The Warranty P Eriod For The Works/Repair Shall Be One Year From The Date Of Completion Of Works Certified By Dewa. In Case Of Any Damage/Defect Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repai R Work And Make Good The Defect With 2 Item-00001 Title: ·# Rchromming Of Diverter Damper Hydraulic Cylinder Piston Dia 200Mm X Rod Dia 140Mm, Stroke Length 1620 Mm., Qty 1 Nos. S Cope Of Work: ·#Hrsg 82 - 1 No #Chroming Of Piston Rod/Tube As Per Standard To Avoid Leakage During Operation. ( If Required) 1 Ea 3 Item-00001 Technical And General Specification Of Outsourcing Work L-2 Station, Jebel Ali Power Station Title: ·#Replacement Of Diverter Damp Er Hydraulic Cylinder, Piston Dia 200Mm X Rod Dia 140Mm, Stroke Length 1620 Mm., Qty 1 Nos. Scope Of Work: ·#Hrsg 82 - 1 No Peri Od Of Work: ·#Replacement :1 Days / Unit ·#Refurbished : 4 Days / Cylinder Scope Of Work For Diverter Damper Cylinder Replacement : ·#Submit Detailed Schedule And Risk Assessment / Method Statement Of The Work In Advance To Dewa. ·#Obtain Gate Pass For The Staf Fs And Permit To Work (For This Contractor Has To Submit The Necessary Gate Entry Pass Documents, To Dewa Engineer Well In Advance) ·#Site Mobilization / Work Preparation One Day In Advance ·#Tbt To Be Sign Daily ·#Dewa Safety Rules To Be Follow Strictly ·#All Too Ls / Lifting Equipment (Chain Block , Belt ,...) Shall Be Under Contract Scope And Test Certificate To Be Provide In Advance ·#Work Will Carry Out With Specialized Technicians With Close Supervision , Site Engineer. ·#Disconnect The Cylinder Connection (Oil Hoses ) ·#Removal Of Old Cylinder And Replacement With New Cylinder After Getting Clearance From Dewa Engineer ·#Housekeeping To Be Carry Out After Cylinder Replacement Dewa Scope: ·#Scaffolding ·#Fork Lift ·#Crane Warranty : ·#·#The Warranty Period For The Works/Rep Air Shall Be One Year From The Date Of Completion Of Works Certified By Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Work And Make Good The Defect Within Short Period Without Affecting The Production Of Electricity And Water. Contact Person- Ankan Kumar Patro, 0556 361082 1 Ea 1 Ea Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332201407
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a34dbd3d-25d2-42d6-a031-fb8994dbd005.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders