GTR 52414189

Tenders Are Invited For Carrying Out Landscaping And Reconstruction Works On The Territory Of Sumgayit State University

ICB — International Competitive Bid Closed Western Asia
Tender Information
GTR Reference
52414189
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Carrying Out Landscaping And Reconstruction Works On The Territory Of Sumgayit State University
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Commonwealth of Independent States CIS
Last Date of Bid Submission
22-06-2022 Closed
Work Detail
Tenders Are Invited For Carrying Out Landscaping And Reconstruction Works On The Territory Of Sumgayit State University Payment Of Landscaping Service Fee (Carrying Out Landscaping And Reconstruction Works In The Territory Of Sumgayit State University) 1 Excavation Of The Trench With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 By Loading The Soil On Dump Trucks, Soil Group: 4 1000 M3 Of Soil 461 M(3) 2 Transportation Of Goods By Dump Trucks With A Carrying Capacity Of 10 Tons (Code 400052) Operating Outside The Quarry. Transportation Distance - 10 Km. 1St Class Load T 899 Ton 3 Execution Of Works At The Landfill, Soil Group: 1 1000 M3 Of Soil 461 M(3) 4 Installation Of Steel Cantilever, Mesh Partitions 100 M2 720 M(2) 5 Glue Rail Coverings: Kn-2 100 M2 For Them 820 M(2) 6 Excavation Of The Trench With Excavators Of "Reverse Trench" Or "Dragline" Type With A Capacity Of 0.5 (0.5-0.63) M3, Soil Group: 2 1000 M3 Of Soil 450 M(3) 7 Manual Excavation Of Soil In Trenches Up To 2 M Wide, Up To 3 M Deep, Using Fasteners, Soil Group: 2 100 M3 Of Soil 24 M(3) 8 Bulldozer Filling Of Pits And Ditches With Relocation Of Soil To A Distance Of Up To 5 M, Bulldozer Capacity: 59 (80) Kw (Ag), 1St Group Soil 1000 M3 Of Soil 230 M(3) 9 Manual Filling Of Ditches, Pits And Holes, Soil Group: 1 100 M3 Of Soil 25 M(3) 10 Soil Compaction With Pneumatic Threshers, Soil Group: 1, 2 100 M3 Of Compacted Soil 226 M(3) 11 Excavation Of The Trench With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 By Loading The Soil On Dump Trucks, Soil Group: 2 1000 M3 Of Soil 220 M(3) 12 Transportation Of Goods By Dump Trucks With A Carrying Capacity Of 10 Tons (Code 400052) Operating Outside The Quarry. Transportation Distance - 10 Km. 1St Class Load T 396 Ton 13 Construction Of Six Foundations: Gravel 1 M3 Base 16.3 M(3) 14 Preparation Of Concrete Preparation Layer 100 M3 Of Concrete At Work 16.3 M(3) 15 Construction Of Strip Foundations: Reinforced Concrete, When The Width Of The Upper Side Is Up To 1000 Mm 100 M3 Of Concrete, Butobeton And Reinforced Concrete In The Work 46.56 M(3) 16 390X190x188 Mm Sawn Limestone Masonry Interior Walls Of Residential, Public And Industrial Buildings: 39 Cm Thick For Masonry 10 M2 Excluding Gaps 76 M(2) 17 Plastering Of Concrete And Stone Surfaces With Cement-Lime Or Cement Mortar: Walls, Simple 100 M2 Plastered Surface 262 M(2) 18 Construction Of Belts: In The Mold 100 M3 Of Reinforced Concrete At Work 18.62 M(3) 19 Improved Plastering On Stone With Cement-Lime Mortar: Walls 100 M2 Plastered Surface 1260 M(2) 20 Painting Of Facades From Wooden Planks With Surface Preparation: Polyvinyl Acetate 100 M2 Painted Surface 1260 M(2) 21 Excavation Of The Trench With Excavators With A Capacity Of 0.25 M3 By "Reverse Trowel" Or "Dragline" Type Excavators, Soil Group: 2 1000 M3 Of Soil 343 M(3) 22 Manual Excavation Of Soil In Trenches Up To 2 M Wide, Up To 2 M Deep, Using Fasteners, Soil Group: 2 100 M3 Of Soil 11 M(3) 23 Bulldozer Excavation Of Soil Up To 10 M, Bulldozer Capacity: 59 (80) Kw (Ag), 2Nd Group Soil (Pushed To A Distance Of 10 M) 1000 M3 Of Soil 354 M(3) 24 Bulldozer Excavation Of Soil Up To 10 M, Bulldozer Capacity: 59 (80) Kw (Ag), Group 1 Soil (Pushing Back Soil For Backfilling) 1000 M3 Of Soil 354 M(3) 25 Bulldozer Filling Of Pits And Ditches With Relocation Of Soil To A Distance Of Up To 5 M, Bulldozer Capacity: 59 (80) Kw (Ag), 1St Group Soil 1000 M3 Of Soil 273 M(3) 26 Manual Filling Of Ditches, Pits And Holes, Soil Group: 1 100 M3 Of Soil 48 M(3) 27 Soil Compaction With Pneumatic Threshers, Soil Group: 1, 2 100 M3 Of Compacted Soil 273 M(3) 28 Construction Of Pipelines From Polyethylene Pipes With More Than 2 Holes (D = 100 Mm Viniplast Pipes In The Trench) 1 Channel-Kilometer Pipeline 1.303 Km 29 Installation Of Bases When There Is A Cable In The Trench 100 M Cable 1265 M 30 Pipes On Prefabricated Structures, Fastened To Walls And Columns With Dams, Up To 25 Mm In Diameter (Viniplast Pipes For Fencing, Diameter: 25 Mm) 100 M 78 M 31 Laying Of Fiber-Optic Cable In The Sewer With The Empty Channel Of The Pipeline 100 M Cable 1660 M 32 Cables With A Weight Of 1 M Up To 1 Kg Along The Brick Wall (Laying Of Fiber-Optic Cables) 100 M Cable 40 M 33 Cable In Underground Sewer, 1 M Cable Weight: Up To 1 Kg (Laying Of Sftp Cables In Underground Sewer) Km 19.815 Km 34 Cable, 1 M Cable Weight: Up To 1 Kg (Laying Of Sftp Cables In Pipes On A Metal Fence) 100 M Cable 78 M 35 Cables Up To 1 Kg Per 1 M Of Brick Wall (Laying Of Sftp Cables) 100 M Cable 155 M 36 Cable, 1 M Cable Weight: Up To 1 Kg (Laying Of Power Cables In Pipes) 100 M Cable 1265 M 37 Cable, 1 M Cable Weight: Up To 1 Kg (Laying Of Food Cables In Metal Fences In Pipes) 100 M Cable 78 M 38 2-4 Core Cable, Core Cross-Section Up To 16 Mm2 (Laying Power Cables Under The Hook) 100 M 104 M 39 Digital Recording Device (Digital Video Recording Device) Device 1 Pieces 40 Video Surveillance Device (Monitor) Pieces 1 Pieces 41 Video Surveillance Cameras: On Brackets Pieces 31 Pieces 42 Design And Connection Of Disconnecting, Radio-Frequency Coaxial Pulse Cable With A Shield Diameter Up To 6 Mm (Bnc For Connection Of Coaxial Cables) 1 1 Pieces 43 Separately Installed Switch Or Power Supply Unit (Adapter) Pieces 31 Pieces 44 Service Communication Switch (Expansion Block Switch - 8 Ports) Pieces 8 Pieces 45 Service Communication Switch (Expansion Block Switch - 48 Ports) Pieces 1 Pieces 46 Desktop Device, Weight: Up To 0.015 Units (Optical Lan Converter-Media Converter) Pieces 8 Pieces 47 Wall-Mounted Control Unit In Cabinet Or Distribution Point (Cabinet), Height And Width: Up To 1200 X 1000 Mm (Installation Of A Metal Box Measuring 600X800 Mm On The Fence) Pieces 8 Pieces 48 Plastic Coated Cable Wall Distribution Box (Finishing Box) Box 9 Box 49 Connector (Connections Bnc) Pieces 62 Pieces 50 Telephone, Lan, Coaxial Cable Sf/Utp Cat 6-Pvc 4X2x0.57 (Sftp Cable Cat.6) M 20650 M 51 0.66 Kv Power Cable 2X2,5 M 1490 M 52 Pvc Pipes, Internal Nominal Diameter 25 Mm M 80 M 53 Manual Excavation Of Soil In Trenches Up To 2 M Wide And Up To 2 M Deep With The Use Of Reinforcements, Soil Group: 1 100 M3 Of Soil 1 M(3) 54 Manual Filling Of Ditches, Pits And Holes, Soil Group: 1 100 M3 Of Soil 2 M(3) 55 Construction Of General-Purpose Reinforced Concrete Foundations, Volume: Up To 5 M3 100 M3 Of Concrete And Reinforced Concrete In The Work 4.1 M(3) 56 A-3 Class Armature T 0.076 Ton 57 Preparation Of Concrete Preparation Layer 100 M3 Of Concrete At Work 0.56 M(3) 58 Side Waterproofing: 2 Layers Of Bituminous Paste On The Leveled Surface Of Brick, Concrete And Masonry 100 M2 Insulated Surface 5 M(2) 59 Outdoor Installation Of Equipment, Equipment Weight: 1.5 T (Diesel Generator Installation, Weight 1308 Kg) 1 1 Pieces 60 Horizontal Ground Connector: Strip-Shaped Steel, Cross-Section 160 Mm2 (40X4 Mm2 Trenching) 100 M 10 M 61 Manual Excavation Of Soil In Trenches Up To 2 M Wide, Up To 2 M Deep, Using Fasteners, Soil Group: 2 100 M3 Of Soil 2.8 M(3) 62 Manual Filling Of Ditches, Pits And Holes, Soil Group: 1 100 M3 Of Soil 2.8 M(3) 63 Excavation Of The Trench With Excavators Of "Reverse Trench" Or "Dragline" Type With A Capacity Of 0.5 (0.5-0.63) M3, Soil Group: 2 1000 M3 Of Soil 100 M(3) 64 Manual Excavation Of Soil In Trenches Up To 2 M Wide, Up To 3 M Deep, Using Fasteners, Soil Group: 2 100 M3 Of Soil 5 M(3) 65 Bulldozer Filling Of Pits And Ditches With Relocation Of Soil To A Distance Of Up To 5 M, Bulldozer Capacity: 59 (80) Kw (Ag), 1St Group Soil 1000 M3 Of Soil 60 M(3) 66 Manual Filling Of Ditches, Pits And Holes, Soil Group: 1 100 M3 Of Soil 7 M(3) 67 Soil Compaction With Pneumatic Threshers, Soil Group: 1, 2 100 M3 Of Compacted Soil 60 M(3) 68 Excavation Of The Trench With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 By Loading The Soil On Dump Trucks, Soil Group: 2 1000 M3 Of Soil 60 M(3) 69 Transportation Of Goods By Dump Trucks With A Carrying Capacity Of 10 Tons (Code 400052) Operating Outside The Quarry. Transportation Distance - 10 Km. 1St Class Load T 100.53 Ton 70 Construction Of Six Foundations: Gravel 1 M3 Base 13 M(3) 71 Preparation Of Concrete Preparation Layer 100 M3 Of Concrete At Work 5.05 M(3) 72 Construction Of Strip Foundations: Concrete 100 M3 Of Concrete, Butobeton And Reinforced Concrete In The Work 14.4 M(3) 73 Construction Of Reinforced Concrete Columns In Wooden Formwork, Height: Up To 4 M, Perimeter Up To 2 M 100 M3 Of Concrete And Reinforced Concrete In The Work 3.6 M(3) 74 Construction Of Belts: In The Mold 100 M3 Of Reinforced Concrete At Work 5.24 M(3) 75 390X190x188 Mm Sawn Limestone Masonry Of All Walls Of Buildings And Structures: 39 Cm Thick For Masonry 10 M2 Excluding Gaps 74 M(2) 76 Masonry Of Sawn Limestone Columns In The Size Of 390X190x188 Mm: 39X39 Cm Thick For 10 M Masonry 78 M 77 Reinforcement Of Masonry And Other Structures 1 T Of Metal Products 0.06 Ton 78 Wall Cladding With 40Mm Thick Sawn Limestone Pans Along With Masonry, Anchored: For 4 M2 Facing Pans For 10 M2 Of The Coated Surface 142 M(2) 79 Installation Of Small Structures (Windowsills, Drains, Parapets, Etc.) Weighing Up To 0.5 Tons 100 Prefabricated Structures 31 Pieces 80 White Limestone M3 1.92 M(3) 81 Improved Plastering On Stone With Cement-Lime Mortar: Walls 100 M2 Plastered Surface 16 M(2) 82 Painting Of Facades From Wooden Planks With Surface Preparation: Polyvinyl Acetate 100 M2 Painted Surface 16 M(2) 83 Installation Of Gap Metal Networks 1 T Of Metal Products 1.34 Ton 84 Installation Of Steel-Framed, Partitioned Or Opening Unheated Layered And Small Door Gates Layer And Space Of 100 M2 7 M(2) 85 Installation Of Metal Door Blocks In Prefabricated Spaces M2 1.8 M(2) 86 Oil Painting Of Metal Surfaces: Large Surfaces (Except Roofing), Number Of Paints 2 Times 100 M2 Painted Surface 628.4 M(2) 87 Manual Excavation Of Soil In Trenches Up To 2 M Wide, Up To 2 M Deep Tender Link :
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f235892b-73ed-4396-ab95-cd2f02760027.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you