GTR 52262114

Tenders are invited for Supply And Installation Of 2 Tr Split Air Conditioning Units

ICB — International Competitive Bid Closed Western Asia
Tender Information
GTR Reference
52262114
Tendering Authority
Subscribe to view
Tender No
2492200317
Financer Name
Self-Funded
Work Title
Tenders are invited for Supply And Installation Of 2 Tr Split Air Conditioning Units
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
20-06-2022 Closed
Work Detail
Quotation Are Invited For Supply And Installation Of 2 Tr Split Air Conditioning Units 15 Nos At Lushaili Substation. Technical Speciation For Supply And Installation Of 2 Tr Split Air Conditioning Units 15 Nos At Lushaili Substation. (Refrigerant-R407c, R-410). A. Scope Of Work: - # The Contractor Quote Shall Include Supply, Installation, Test And Commissioning Of Ac Split Un Its Including Power Wiring From Db, Refrigerant Piping (Mueller Pipes) Consumables, Metal Framework, And Labors. # Air Conditioners Shall Be Self-Resetting Type (Auto Reset Timer) I.E. In Case Of Power Failure Ac Shall Automatically, On Power Resumption As Per Dew A Regulations. # Outdoor Unit Shall Have Reciprocating Compressor With Protections And Shall Be Suitable Mounted Using 2 Galvanized Angle Iron (Hdgi) Stands Of 3 Feet Height/Rcc Foundation# # Outdoor Unit Shall Have Copper Condenser Coil With 5 Or 4-Star Energy Ef Ficiency Ratings Only Will Be Accepted. (Aluminum Condenser Coil Will Not Accept) And The Unit Approximately Capacity Of 24,000 Btu. # Stands Are To Be Approved After Hot Dipped Galvanizing And Before Fixing Indoor And Outdoor Units/Rcc Foundation To Be Made# # Th E Drain Shall Have Bought And Discharged Outside The Office And Connected To The Suitable Existing Drainage System, Through Trunking . # Contactor To Make Sure That Unit Selected Has Power Factor Of 0.9 Lag Minimum And Submit Details Along With The Quotation As Per Dewa Regulations. # The Contractor Scope Includes Supply, Install, Test, And Commissioning Of The Split Units. The Complete Unit Sh All Have A Warranty Of One Year And The Compressor For Five Years # Contractor Need To Supply And Install The Electrical Isolator (A Bb Brand Aluminum Alloy Enclosure) And Mcb, Elcb, Uvr- Including Wiring. # However Single Phase Uv Relay (Broyce Make Only) And Wiri Ng Is To Be Provided By The Contractor In Pvc Coated Galvanized Flexible Conduit. All Materials Shall Be Of Approved Quality. # The Suction Pipe Shall Be Adequately Thermal Insulated With Canvass Foster And All The Pipes, Wiring Etc. Shall Be Installed In Proper M Anner And Taken Through Trunking /Tray For Outdoor Gi Trunking Shall Be Used. All Holes Made For Crossing The Pipes Through Porta Ca Bin Wall/Floor Be Sealed Immediately. # The Contractor Shall Close The Window Ac Opening And Make That Part Good Matching With The E Xisting Porta Cabin/Wall. # The Contractor Is Required To Take All Precaution, So As Not Damage Any Of The Existing Equipment/Struct Ure Etc. Inside The Room And Ensure That The Staff Do Not Enter Or Touch Any Of The Equipment Of The Wtc And The Radio Room. # Contr Actor Staff Is Required To Wear Proper Personal Productive Equipment At All Times Inside The Premises And Shall Take All Fire Precau Tion While Carrying Out The Work Of Brazing Etc. # All The Materials In General Will Conform As Per Latest Standards And Shall Be Su Bmitted To Dewa For Engineer#S Approval. # The Job Execution Shall Be Carried Out In The Timing Assigned By The Dewa Engineer. # Con Tractor Has To Provide Material Submittal, Method Statement, And Schedule Of Work To The Engineer For Approval Before Carrying Out The Installation. # The Contractor Shall Be Ready To Supply The Ac Units, Carry Out The Installations Within One Year As, And When Re Quire From The Date Of Purchase Order Based On Dewa Requirement. # The Ac Unit Design Operating Temperature Shall Be 460C And Compre Ssor Shall Be Squirrel Type. The Unit Shall Have Hp And Lp Protection. # After Awarded The Purchase Order Dewa Will Informed To Cont Ractor Do Installation The Ac Units As Per The Site Requirement. # Dewa Will Not Provide Store To Keep Ac Units. # The Contractor Sh All Consider The Brands Of Split Ac Units O-General, Carrier, Lg, Mitsubishi, Daikin, White Westinghouse, Etc... # Contact Person Fo R Site Visit Mr. Mohideen: 055 3810513, 04 3227879 ([email protected]) And Mr. Akbar Ali: 052 8682151 Qty: 15 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2492200317
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
aa8b9c58-74f7-474f-9ea9-69cdcde589d9.pdf
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders