GTR 50197821

Tenders Are Invited For Elevator Maintenance

ICB — International Competitive Bid Closed Western Asia
Tender Information
GTR Reference
50197821
Tendering Authority
Subscribe to view
Tender No
2332200733
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Elevator Maintenance
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
13-04-2022 Closed
Work Detail
Quotation Are Invited For Elevator Maintenance 1032201182Rfx Description Elevator Maintenance 1 Item-00001 Specialist Elevator Contractor Scope Of Works: Maintenance Of Elevators At Barhi 132/11Kv Substation For The Period 01/05/2022 Till 30/04/2024. Contractor Scope Of Works Includes The Following: A. Running Condition Of Elevator. (Once In A Month) 1. Inspection Of D Oor Closing And Opening. 2. Checking Of Door Closing And Opening Time. 3. Inspection Of Cage Running Vibration And Extraordinary Noi Se. 4. Checking Of Cage Stop Shock. 5. Checking Of Cage Landing Level. B. Machine Room Equipment. (Once In A Month) 1. Checking Of Operation Of Traction Machine For Extraordinary Noise, Vibration And Temperature Rise. 2. Checking Of Oil Leakage Of Traction Machin E And Cleaning. 3. Checking Of Gear Oil Level. 4. Checking Of Defacement Of The Sheave. 5. Checking Of Magnetic Brakes Operation And Cleaning. 6. Lubrication Of Pin Parts. 7. Checking & Measuring Of Remaining Thickness Of Brake Lining. 8. Inspection Of Rotating Co Ndition Of Governor Machine. 9. Checking For Main Rope Condition & Slippage. C. Cabin Equipments. (Once In A Month) 1. Inspection O F The Cage Interior. 2. Inspection And Cleaning Of The Cage Lighting And Fan. 3. Inspection Of Car Position Indicator, Button And La Mps. 4. Inspection Of The Functioning Of Safety Edge/Photo Eye. D. Entrance. (Once In A Month) 1. Cleaning Of Door Sill Groves, Ins Pection Of Door Shoe Abrasion. 2. Inspection Of Indicator Lamps And Push Buttons At All Floors. E. Maintenance To Be Carried Out On Ce In Three Months. 1. Measurement Of Brake Plunger Strokes. 2. Lubrication Of Pin Parts For The Brakes. 3. Inspection Of Pin Parts And Bearings Of The Governor. 4. Lubrication, Cleaning And Inspection Of Hanger Rail, Roller And Eccentric Rollers Of The Cage. 5. C Leaning And Lubrication Of Door Gripping Device Of The Cage. 6. Checking The Operation Of Door Lock Switch. 7. Confirmations Of Do Or Lock Mechanism. 8. Confirmation Of Unlocking Operation Of Hatch Door From Outside And Inside Of The Cage. 9. Inspection Cleaning And Lubrication Of The Drive Chain For The Door Machine. 10. Inspection And Lubrication Of Cage And Counter Weight Rollers And Pins. 11. Inspection Of Operation Of Normal Switch. 12. Inspection And Cleaning Of The Pit. 13. Inspection Of Buffers-Oil And Rust. 14. I Nspection Of The Emergency Landing System. F. Maintenance To Be Carried Out Once In Six Months. 1. Greasing Of Roller Bearing Of Tr Action Machine And Motor. 2. Overhaul Of Magnetic Brakes And Greasing Of Pin Parts. 3. Measurement Of Remaining Thickness Of Brakes Lining. 4. Inspection And Cleaning Of Hoist Way. 5. Lubrication And Greasing Of The Shaft Bearing Of The Door Machine And Door Motor . 6. Inspection Of The Main And Counter Weight Rails. 7. Inspection Of Operation Of Final Limit Switch. G. Emergency Break Down And Call Back Services 1. Emergency Minor Adjustments, Breakdown Call Back Services And Rescue Services For 24Hours A Day On All The Da Ys Of The Maintenance Period As Mentioned Above. H. General 1. The Elevator Entirely Shall Be Under The Maintenance Scope Of Contra Ctor During The Above Mentioned Period. 2. Qualified And Trained Personnel Directly Employed And Supervised By The Contractor Shall Only Be Deployed For Carrying Out The Elevator Maintenance. 3. All Reasonable Care Shall Be Taken To Maintain The Elevator Equipment In Proper And Safe Operating Condition. 4. To Replace Guide Shoe Gibs And Guide Rollers, When In Specialist Contractor#S Judgement, It Is Necessary To Ensure Smooth And Quiet Operation Except, Where Roller Guides Are Used To Keep The Guide Rails Properly Lubricat Ed. 5. To Replace All Wire Ropes As Often Is Necessary To Maintain An Adequate Factor Of Safety, To Equalize The Tension On All Hois Ting Ropes And Repair Or Replace Conductor Cable. 6. To Examine, Lubricate, Adjust And To Repair Or Replace All Necessary Equipment As Per The Specialist Contractor#S Judgment. 7. To Examine Periodically All Safety Devices And Governors And Carry Out Annual Safety Tests. 8. The Installation Shall Be Maintained In Good Working Condition During The Maintenance Period. Notes: A. The Party Shall Coordinate With The Following Engineers For Arranging Site Visit, If Any Required, Prior To Quote. Quote For Lump Sum Accordingly. No Change In Quoted Price Acceptable After Issue Of Po. Dewa Engineers To Be Coordinated For Site Visit/ Elevator Maintenance Mr. R Ashid Kallery - Mob: 052-5507585 Mr. Abdalla Hassan - Mob: 052-9696939 Mr. Farish Rafi - Mob: 055-9764652 B. Upon Issue Of Po Whene Ver Required, Contractor Shall Obtain The Entry Permit (Permit To Work- Ptw) Approval From Dewa-Tcm Department Separately For Each O F The Substations In The Prescribed Format Prior To Start Any Pm Work. C. All Maintenance Works Shall Be Done In Presence Of Dewa Su Pervision Staff. D. All Loading, Unloading And Shifting Of Materials Related To This Scope Shall Be Under Contractors Scope. E. Aft Er Completing The Works Each Time, Contractor Shall Perform Necessary Testing In Presence Of Dewa Supervisor/Engineer. F. Contractor Shall Submit Monthly Maintenance Report To Dewa-Tam. The Delivery Note, Testing & Commissioning Report, Warranty Certificate, Work Completion Report Along With Po Copy Shall Be Submitted To Dewa-Tam After Successful Completion Of The Work In Every Six Months. Co Ntact Person For Documents Submission In Dewa-Tam: Mr. Mohammed Azeemuddin (Ph: 04-3221689/ 055-7728480) 1 Ea Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9365a954-c2c2-436c-858a-2b0744f99450.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders