GTR 49957510
Tenders Are Invited For Fabrication And Supply-Installation Of Electrical Manual Changeover Panel
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
49957510
Tendering Authority
Subscribe to view
Tender No
2332200672
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fabrication And Supply-Installation Of Electrical Manual Changeover Panel
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
05-04-2022
Closed
Work Detail
Quotation Are Invited For Fabrication And Supply-Installation Of Electrical Manual Changeover Panel Fabrication 1032200584Rfx Description Fabrication 1 Item-00001 Pr- 1032200584 Fabrication And Supply-Installation Of Electrical Manual Changeover Panel At Palm Jumeira Ro Plant 1.#Introduction & General Requirement: 1.1#This Enquiry Is Intended For Supply & Installation Of A Manual Change Over Panel For Old And New Control P Anel Of Palm Jumeira Ro Plant Cip Tank Heater For Independent Control-Operation From Any Of The Two Control Panels. 1.2#The Prospect Ive Supplier May Visit The Site To Understand The Detailed Scope For The Supply & Installation Of A Change Over Panel For Old And Ne W Control Panels Of Palm Jumeira Ro Plant Cip Tank Heater. Plant/Site Visit And Correspondence Shall Be Communicated By Email To Mr. Firoz Ahmed, Deputy Manager-Em(G), [email protected] With Copy To Mr. Ramasubramanian T.S, Manager-Em(G), 1 Job Ramasubramanian@Dew A.Gov.Ae. The Contractor May Contact With Mr. Firoz Ahmed, Mob: 050 4238725, 0505562685 For Technical Clarification. 2#Scope Of Work And Technical Specifications: 2.1#The Bidders Shall Visit Site And Collect Information Regarding Sizes Of The Existing Palm Jumeira Plant Cip Tank Heater Old And New Control Panels And Proposed Change Over Panel. Please Refer To The Attached Annexure-1& 2 For The Drawings Of Proposed Changeover Panel And The Drawings Of Old And New Control Panel. It Is The Contractor#S Responsibility To Tak E Correct Measurement For The Changeover Panel And Supply-Install Accordingly. 2.2#Fabrication And Supply Of New Electrical Manual C Hangeover Panel With Power Components Installed Inside. The Change-Over Panel Shall Be Installed Above The Existing Cip Heater Contr Ol Panel (Fig. 1A & 1B Of Annexure-1). The Bidders Shall Visit Site And Collect Information Regarding Size Of The Panel So That It Matches To The Incoming Supply Lines And Two Control Panels (Old & New). Approximate Size Of The Change-Over Panel Is Width 90 Cm X Height 90 Cm X Depth 35 Cm. The New Changeover Panel Will Be 10 Cm Extended Rear Side To Facilitate Fixing Of Its Supports, Cable L Adders & Cables At Backside Of Old Control Panel Which Will Be Just Below The Changeover Panel. It Is The Contractor#S Responsibili Ty To Take Correct Measurement Of The Panels, Trays And To Design The Correct Components So That Installation Of The Panel Is Done A Bove The Old Cip Heater Control Panel And Laying Of Cables Is Done Without Any Difficulty Or Further Site Modification. 2.3#The New Changeover Panel Shall Be Made Of Ax Fiberglass-Reinforced Polyester Enclosure Or Equivalent. Change Over Switch Handle Shall Be Ins Ide The Panel And Shall Be Accessible After Opening The Door. The Door Locks Shall Be Heavy Duty, Corrosion Proof And Friendly Handl E-Locks. The Panel Shall Comply Ip 65 Protection Rating. 2.4#Fabrication And Supply Of New Panel-Stand Which Shall Support The Chang Eover Panel Against The Floor Without Touching The Old Control Panel Facilitating The Change-Over Panel To Take Place Just Above The Old Cip Heater Control Panel And Adapt To The Respective Location Of The Panel And Overhead Cable Tray Properly (Annexure-1). New Panel-Stand Shall Be Made Of Corrosion-Proof Stainless Steel Grade 316 L. 2.5#All Cable Entries Shall Be As Per Attached Drawing With Removable Plate Matching To The Respective Panel#S Existing Incoming Power Cables And Heater Cables; These Power Cables Shall Be Re -Used. 2.6#Back-Plate, Electrical Power Components, Power Terminal Blocks With Shorting Bus And Wiring Need To Be Provided Along Wit H The Panel By The Contractor As Per Attached Drawings. 2.7#R, Y & B Bus-Bar Shall Be Supplied & Installed Inside The Panel Located Above The Change Over Switch. Existing Power Supply Incoming Cables Are To Be Connected To These Bus-Bar Terminals; Terminals Shall Be Connected To The Bus Bars By Bolts. The Changeover Switch Output-1 & 2 Terminals Shall Be Extended To The Old And New Control Pa Nel Main Incoming Breakers As Per Annexure-1. 2.8#The Panel Components Shall Be Arranged In Such A Way That Proper Spacing Among The Components Are Maintained. 2.9#All The Components Inside Panel E.G. Manual Changeover Switch, Terminal Blocks, Power Cables With Te Rminated Lugs, Bus-Bars Etc. Shall Be Provided And Installed-Connected By The Contractor. 2.10#Cable Trays/Ladders With Protection C Over Shall Be Provided & Installed For The New Cables Interfaced Among The New Change-Over Panel And 2 Control Panels As Per Annexur E-1. Existing Overhead Cable Trays Can Be Used For Laying Power Cable Between Change-Over Panel And New Control Panel. Existing Floo R Mounted Cable Trays Are To Be Used For Power Cables To Heater Stages. New Cable Tray Level Is To Be Elevated To Provide Same Groun D Clearance; Cable Trays Are To Be Provided With Protection Covers. All The Accessories Required For The Above Jobs Such As Reducers (Straight, Right, Left), Tee, Bends, Couplers, Hangers, Fish Plates And Fasteners Etc. Shall Be Arranged And Installed By The Contr Actor. All New Cable Trays, Ladders & Covers Shall Be Epoxy Coated Hdgi Cable Tray (Hot Dipped Galvanized Steel Materials With Epoxy Paint Coating). The Coating Thickness Of Galvanization Shall Be Minimum 100 Micron. All Cable Trays / Ladders Shall Be Fixed With S Upports With Stainless Steel Nuts & Bolts Of Suitable Size & Adequate Support For Cable Trays. The Thickness Of The Cable Trays Shal L Be 2.5 Mm And That Of Cover Shall Be 1.5 Mm. All Concerned Cables Are To Be Clamped With Trays Properly With Appropriate Pvc Clamp S. 2.11#Dewa Will Provide Un-Terminated Cables; Supply Of Glands, Termination Lugs & Accessories Is Under The Scope Of The Contracto R. The Contractor Shall Cut The Cables As Per Clause 2.16 And As Per Site Requirements. The Contractor Shall Carry Out Termination W Ith Their Supplied Termination Lugs & Accessories. Cable Laying, And Glanding-Termination Are The Scope Of The Contractor. There Wil L Be Outage And Non-Outage Related Works; Non-Outage Related Works Shall Be Carried Out First And Final Connection To The Heater And Existing Control Panel Shall Be Carried Out As Per Dewa Outage Of The Existing Cip Heater Control Panel. The Contractor Shall Provide Schedule Of The Works Showing Outage And Non-Outage Related Works Within 10 Working Days From The Issue Of The Order. 2.12#The Pa Nel Door Shall Have Indication Lamps For The Incoming Power Supply Phases With Necessary Transparent Protection Cover. 2.13#Necessar Y Fixing Rails At Back-Plate Shall Be Provided For Fixing The Terminal Blocks. 2.14#Kks / Name Details Of The Panel Shall Be Engrave D In Front Side Of The Panels. Kks / Name Details Will Be Provided By Dewa Engineer. 2.15#Drawing And Material Details Shall Be Subm Itted Along With Offer. 2.16#The Contractor Shall Carry Out Necessary Site Visit For Preparation Of Proper Drawings And Obtain Appro Val Of The Drawings And Documents Before Manufacturing / Fabrication Of The Panel. 2.17#The Following Manual Change-Over Switch And Terminal Block Shall Be Provided And Installed In The New Panel Interfaced With Incoming Supply, Old Control Panel And New Control Panel (As Per Attached Drawing); Cables Will Be Provided By Dewa: 1#Manual Changeover Switch, 400A, 400Vac, Schneider Ins400 - 3 Pol Es - 400 A / Abb Ot400e, Iec Type Or Equivalent- Qty-1 ( Existing Power Supply Incoming Cables To Be Connected To R, Y & B Bus-Bar Inside The Panel; Change-Over Terminals Shall Be Connected To The Bus Bars By The Contractor) 2#Power Terminal Block, 50A-100A, 60 0 V, Ge Iku2s : Terminal Block, 2-Pole, Shorting - Qty-18 (Each Terminal Block Will Contain Two Up-Down Connectors With Shorting Bus ) 3#Power Cables Terminated With Proper Size Lug And Glanding, 400A, 400V, 3 Phase, 4Core, Armored Xlpe -Qty -1 (For Power Suppl Y From Changeover Panel To The New Control Panels; Cables Will Be Provided By Dewa; Contractor Shall Transport The Cables From Dewa Store To Site) 4#Power Cables Terminated With Proper Size Lug And Glanding, Power Cables Terminated With Proper Size Lug And Glandin G, 400A, 400V, 3 Phase, 4 Core, Armored Xlpe, Qty Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
23f0544a-fe62-4110-b396-eff94816ce10.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.