Additional information: Ii. Como a - River Nitra, Passing Psoh Km 0.000 - 6,260 and soh Km 0,490 - 6,490 Nitra River Dyke construction work Short Description: CORRYTH CORRYT CORRYTH River Nitra River in the section is sufficient to convert dimensional flow, but at a longer-permanent flood situation on the Nitra River as well as on the balance and the Danube, the air level on Nitra causes the heating and watering on the air side of the protective dot in the space between Estate air heel of dyke and existing drainage rigol. This condition is identical along PSOH km 0,000 6.260 as well as along the SOH KM 0,490 6,490 of the Nitra River. For this reason, it is proposed to increase the safety of the territory against large waters on the Nitra flip and backward water from the Danube and the weight in the section from the movement of Nitra to the weight at the village of Komo a po Bridge in km 6,900 the Nitra River. In order to attack the protective dot of the Nitra river, the underground sealing wall (PTS) is designed in the koruna axis of the dike through their own bodies of the dyke as well as part of the castle. This is an underground sealing wall suspended by the trenchless technology of the current injection method. Deadline for Submission: 20220328 09:00 Type of Buyer: Body governed by public law Type of Contract: Works Type of Procedure: Open procedure Regulation: European Union, with participation by GPA countries Type of Bid: Submission for all lots Award Criteria: Lowest price [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.