GTR 49488198

Tenders are invited for Complete Overhauling Of Booster Pump

ICB — International Competitive Bid Closed Western Asia
Tender Information
GTR Reference
49488198
Tendering Authority
Subscribe to view
Tender No
2332200583
Financer Name
Self-Funded
Work Title
Tenders are invited for Complete Overhauling Of Booster Pump
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
21-03-2022 Closed
Work Detail
Quotation Are Invited For Complete Overhauling Of Boost 1032200917Rfx Description Complete Overhauling Of Booster Pump For Najma Pumping Station Ph-Ii. Pump Details: Make-Torishima, Model-Cdmv350x300jn, Capacity-316L/Sec. Rpm-1475, Head-45M. 1 Item-00001 Complete Overhauling Of Booster Pump For Najma Pumping Station Ph-Ii. Pump Details: Make-Torishima, Model-Cdmv350x300jn, Capacity-3 16L/Sec. Rpm-1475, Head-45M. Please Contact Mr. Noor (04-3229439) For Further Clarifications. 1.0#Scope Of Work The Scope Of Work (Mandatory & Optional) For The Overhaul Of Booster Pumps And Their Accessories Of Booster Pumping Station. # A)#The Contractor Has To Take The Pump Assembly From Dewa Site To Their Workshop & Vice Versa. Dewa Shall Not Provide Any Transport To Shift The Same. Fo R Loading & Unloading Contractor Can Use Dewa Overhead Crane Available At Pumping Stations In Coordination With The Dewa Representat Ives. B)#Mechanical Seal Replacement, Coupling Bush Renewal & Gland Packing Renewal, Bearing Replacement As Required. C)#Overhauling Of Pump (See Annexure I-Mandatory & Ii-Optional) D)#Painting Of Pump Externally E)#Rectification Of The Pump For Any Complaint Rose After Installation. F)#If Any Part Is Found Defective, The Contractor Has To Repair/Replace The Same. Available Spare Shall Be Supp Lied By Dewa. If Any Spare Is Not Available With Dewa The Contractor Has To Arrange The Same. Additional Cost Of Spare To Be Submitt Ed To Dewa For Approval Before Placing The Order. 2.0#Prior To Submission Of Quotation, The Following Shall Be Determined Careful Ly: A)#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access Facilities, Complexiti Es, Etc., Before Submitting The Quotation. B)#Dewa Will Not Accept Any Claim For Extras Beyond The Order Rates / Prices During And After The Execution Of Work Ordered. C)#The Contractor Will Be Provided With The Equipment Shutdown Program In Coordination With Op Eration & Maintenance Department Of Water Division. D)# The Contractor Should Submit The Time Schedule /Bar Chart Indicating Each A Ctivity. E)#On Completion Of The Work, The Inspection Checklist Of Quality Procedures, Wherever Applicable Should Be Filled In And Submitted. F)#Site Supervision, Co-Ordination Of Field Activities, Supply Of Required Technicians, Tools, Equipments, Tackles Etc. Required For Execution Of The Contract Works Shall Be Suitably Considered. 4.0#Take Over On Completion Of All Work Within The Scope Of The Contract, For Acceptance Of The Maintenance Work, Contractor Shall Notify Dewa In Writing. A Certificate Of Completion Will Be Issued By Dewa On Final Inspection Only When The Contract Work Is Deemed To Have Been Taken Over By Dewa After Necessary Con Dition Monitoring Checks Wherever & Whenever Required. 5.0#Warranty A)#All The Work Carried Out Shall Carry A Warranty For 8000 Hours Of Operation Or 1 Year Whichever Is Earlier. B)#The Guarantee Will Take Effect From The Date Of Takeover By Dewa Of The Job C Arried Out By The Contractor. C)#When A Defect Is Noticed During The Period Of Warranty, The Contractor Must Rectify The Defect Wit Hin A Reasonable Amount Of Time Fixed By Dewa With No Claim Or Compensation. 6.0#Documents: # On Satisfactory Completion Of The Work & Handing Over, The Contractor Should Submit The Following To Dewa. ## A)#Inspection Report. B)#Overhau L Report. C)#Job Completion Report For Jobs Other Than Routine Inspection & Overhauls D)##As-Fitted# Bill Of Materials For Consump Tion Of Spares E)#Requisition For Planning Of Spares By Dewa Based On Current Condition Of The Equipment For Which Maintenance Work Was Taken Up. Annexure # I Detail Scope Of Work (Mandatory) For Overhaul The Booster Pump Of Pumping Station Sl.No#Activity #Remarks# 01#Dismantling Of The Pump#Dismantling Of The Pump As Per Dewa Engineer#S Instruction# ##Pump Shall Be Removed As Per Se Quence With Skilled Workmanship & Care.# 02#Overhauling Of Pump#The Contractor Shall Dismantle The Complete Rotating Assembly At The 1 Ea Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ac74d603-74e7-4a89-8d68-68fee8f18949.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders